← Back
BuildNYC
Three families
5408 7TH AVENUE
BROOKLYN · BIN 3014753
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R7AZoning
3,300 sfGross Floor Area
3Units
Rent Stabilized17 Active Violations ▸FDNY Report ↗
Three families · Owner of record: Steadypath Real Estate · 1,600 sf lot · 2.06 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issued17p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Steadypath Real Estate103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/19/2025$2.3M—Private party → STEADYPATH REAL ESTATE LLC$691/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates210/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Highquality Construction VNW203/21/2026
Building Lifecycle
All (79)Filed (2)Violation (37)Objection (10)Special Inspection (30)
10/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL EXTENSION. OBTAIN A NEW C OF O.
B01236484-P1
10/09/2026
Special inspection requirement — Insulation placement and R values
10/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/09/2026
Special inspection requirement — Energy Code Compliance Inspections
10/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
10/09/2026
Special inspection requirement — Lowest Floor Elevation
10/09/2026
Special inspection requirement — Exterior lighting power
10/09/2026
Special inspection requirement — Lighting in dwelling units
10/09/2026
Special inspection requirement — Protection of exposed foundation insulation
10/09/2026
Special inspection requirement — Interior lighting power
10/09/2026
Special inspection requirement — Maintenance information
10/09/2026
Special inspection requirement — Air barrier - visual inspection
10/09/2026
Special inspection requirement — Lighting controls
10/09/2026
Special inspection requirement — Metering
10/09/2026
Special inspection requirement — Fenestration air leakage
10/09/2026
Special inspection requirement — Fenestration areas
10/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
10/09/2026
Special inspection requirement — Permanent certificate
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
09/17/2025
Objection raised — Zoning
09/17/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Zoning
07/23/2025
Special inspection requirement — Permanent certificate
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
06/25/2025
Objection raised — Zoning
06/25/2025
Objection raised — Zoning
06/25/2025
Objection raised — Zoning
06/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL EXTENSION. OBTAIN A NEW C OF O.
B01236484-I1
06/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/11/2025
Special inspection requirement — Lowest Floor Elevation
06/11/2025
Special inspection requirement — Lighting controls
06/11/2025
Special inspection requirement — Protection of exposed foundation insulation
06/11/2025
Special inspection requirement — Exterior lighting power
06/11/2025
Special inspection requirement — Lighting in dwelling units
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
06/11/2025
Special inspection requirement — Maintenance information
06/11/2025
Special inspection requirement — Metering
06/11/2025
Special inspection requirement — Interior lighting power
06/05/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, closed)
I
04/03/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, closed)
I
11/01/2023
Violation issued (HPD, open)
A
03/20/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, open)
A
10/04/2021
Violation issued (HPD, closed)
C
10/04/2021
Violation issued (HPD, closed)
C
10/04/2021
Violation issued (HPD, closed)
B
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, open)
A
10/28/2019
Violation issued (HPD, closed)
I
08/26/2019
Violation issued (HPD, open)
B
Latest 60 of 79 events.
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/09/2026Insulation placement and R values—energy_progress
10/09/2026Fire-Resistant Penetrations and Joints—special
10/09/2026Structural Stability – Alterations of existing buildings—special
10/09/2026Energy Code Compliance Inspections—progress
10/09/2026Fire-Resistance Rated Construction—progress
10/09/2026Lowest Floor Elevation—progress
10/09/2026Exterior lighting power—energy_progress
10/09/2026Lighting in dwelling units—energy_progress
10/09/2026Protection of exposed foundation insulation—energy_progress
10/09/2026Interior lighting power—energy_progress
10/09/2026Maintenance information—energy_progress
10/09/2026Air barrier - visual inspection—energy_progress
10/09/2026Lighting controls—energy_progress
10/09/2026Metering—energy_progress
10/09/2026Fenestration air leakage—energy_progress
10/09/2026Fenestration areas—energy_progress
10/09/2026Fenestration and door U-factor and product ratings—energy_progress
10/09/2026Permanent certificate—energy_progress
07/23/2025Permanent certificate—energy_progress
06/11/2025Fire-Resistance Rated Construction—progress
06/11/2025Lowest Floor Elevation—progress
06/11/2025Lighting controls—energy_progress
06/11/2025Protection of exposed foundation insulation—energy_progress
06/11/2025Exterior lighting power—energy_progress
06/11/2025Lighting in dwelling units—energy_progress
Latest 25 of 36.
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01236484-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)2
10/15/2026B01236484-P1Open ↗
08/13/2026B01236484-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
10/15/2026B01236484-P1Open ↗
08/13/2026B01236484-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01236484-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
10/15/2026B01236484-P1Open ↗
08/13/2026B01236484-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
10/15/2026B01236484-P1Open ↗
08/13/2026B01236484-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
10/15/2026B01236484-P1Open ↗
08/13/2026B01236484-I1Open ↗
▸DOB NOWProperty Ownership Certification2
10/15/2026B01236484-P1Open ↗
08/13/2026B01236484-I1Open ↗