← Back
Primarily 3 family with 1 store or office
5409 4 AVENUE
BROOKLYN · BIN 3014573
💬 Discuss this project
1931Year Built
3Stories
S3Building Class
R7AZoning
3,180 sfGross Floor Area
4Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 5409 4TH AVENUE LLC · 1,600 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 33p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
1 job · most recent 08/11/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/11/2025Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
Building Lifecycle
All (66)Filed (5)Permit Issued (2)Violation (26)Inspection (3)Objection (24)Special Inspection (6)
04/19/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Addressed
08/18/2025
Objection raised — Scope
08/18/2025
Objection raised — Cost
08/11/2025
Filed — Alteration
EMERGENCY REPAIR DUE TO FIRE DAMAGE AT 2 FLOOR FRONT CEILING / TO RECONFIGURE EXISTING LAYOUT. ALL WORK AS PER PLANS FILED HEREWITH
B00987159-P4
07/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2024
Objection resolved — Addressed
09/10/2024
Objection raised — Scope
09/06/2024
Objection resolved — Addressed
09/06/2024
Objection resolved — Addressed
09/06/2024
Objection resolved — Addressed
09/06/2024
Objection resolved — Addressed
09/06/2024
Objection resolved — Addressed
09/05/2024
Objection raised — Fire_Protection
09/05/2024
Objection raised — Scope
09/05/2024
Objection raised — Scope
09/05/2024
Objection raised — Scope
09/05/2024
Objection raised — Structural
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZARINA KINDO
09/04/2024
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/04/2024
Special inspection requirement — Final
CALVIN TRAN
09/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
CALVIN TRAN
09/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CALVIN TRAN
09/04/2024
Special inspection requirement — Fenestration air leakage
CALVIN TRAN
08/30/2024
Filed — Alteration
EMERGENCY REPAIR DUE TO FIRE DAMAGE AT 2 FLOOR FRONT CEILING / TO RECONFIGURE EXISTING LAYOUT. ALL WORK AS PER PLANS FILED HEREWITH
B00987159-P2
08/30/2024
Filed — Alteration
EMERGENCY REPAIR DUE TO FIRE DAMAGE AT 2 FLOOR FRONT CEILING / TO RECONFIGURE EXISTING LAYOUT. ALL WORK AS PER PLANS FILED HEREWITH
B00987159-P1
08/15/2024
Permit issued — Plumbing
B00987159-S1-PL
03/28/2024
Permit issued — General Construction
B00987159-I1-GC
02/28/2024
Objection resolved — Addressed
02/13/2024
Objection resolved — Addressed
01/29/2024
Objection resolved — Addressed
01/29/2024
Objection resolved — Addressed
01/17/2024
Objection raised — Structural
01/17/2024
Objection raised — Fire_Protection
01/17/2024
Objection raised — Admin
01/17/2024
Objection raised — Scope
01/10/2024
Filed — Alteration
EMERGENCY REPAIR DUE TO FIRE DAMAGE AT 2 FLOOR FRONT CEILING / TO RECONFIGURE EXISTING LAYOUT. ALL WORK AS PER PLANS FILED HEREWITH
B00987159-S1
01/10/2024
Filed — Alteration
EMERGENCY REPAIR DUE TO FIRE DAMAGE AT 2 FLOOR FRONT CEILING / TO RECONFIGURE EXISTING LAYOUT. ALL WORK AS PER PLANS FILED HEREWITH
B00987159-I1
12/27/2023
Violation issued (HPD, open)
I
12/27/2023
Violation issued (HPD, open)
I
12/21/2023
Violation issued (HPD, open)
A
12/21/2023
Violation issued (HPD, open)
C
12/21/2023
Violation issued (HPD, open)
A
12/21/2023
Violation issued (HPD, open)
C
12/21/2023
Violation issued (HPD, open)
C
12/21/2023
Violation issued (HPD, open)
C
12/21/2023
Violation issued (HPD, open)
C
02/18/2022
Violation issued (HPD, closed)
A
08/13/2019
Violation issued (HPD, closed)
B
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2005
Violation issued (HPD, open)
B
04/05/2005
Violation issued (HPD, open)
B
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 66 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5409 4TH AVENUE LLC1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION508/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANKLYN ESTRELLA ARCHITECT PLLC503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZARINA KINDO, RA4900208/30/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG08/15/2024
DOB NOWGeneral ConstructionPermit IssuedKLE CONSTRUCTION INC03/28/2024
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/04/2024Fire-Resistant Penetrations and JointsZARINA KINDOspecial
09/04/2024Energy Code Compliance InspectionsCALVIN TRANprogress
09/04/2024FinalCALVIN TRANprogress
09/04/2024Fire-Resistance Rated ConstructionCALVIN TRANprogress
09/04/2024Fenestration and door U-factor and product ratingsCALVIN TRANenergy_progress
09/04/2024Fenestration air leakageCALVIN TRANenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026B00987159-P4Request digital key ↗
08/26/2026B00987159-P4Request digital key ↗
08/26/2026B00987159-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B00987159-I1Open ↗
08/29/2026B00987159-I1Open ↗
08/29/2026B00987159-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00987159-P4Open ↗
08/26/2026B00987159-P2Open ↗
08/26/2026B00987159-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B00987159-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B00987159-P4Open ↗
08/26/2026B00987159-P4Open ↗
08/26/2026B00987159-P2Open ↗
Showing 3 of 7 on file for this type