HPD04/30/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB06/23/2024FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
DOB04/22/2023FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
DOB01/23/2023CYCLE 9B UNSAFE REPORT FILED
ECB11/10/2022FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 7B AND 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#811999.AGG2 HISTORY OF NONCOMPLI$6K due
DOB08/21/2022FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
DOB04/13/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB12/07/2021AC28-302.1 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT.NOTE:ATOI,EXTERIOR WALL CONDITION CERT WASNT POSTED IN INTERIOR OF BLDG (LOBBY OR VESTIBULE) COMPLY W/CODE AS PER 1-RCNY-103-04$96 due
DOB06/20/2021FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
DOB06/12/2021V-DOB VIOLATION - ACTIVE
ECB07/08/201926B11,02X10,52M07,59B01; (26-B)REPLACE WITH MANUAL RESET SWITCH(02-X)REPAIR IN CAR PHONE(52-M)PROVIDE TAG(59-B)ADJUST TAG MARK WITH PERMANENT MARK.$3K due
DOB07/31/2018FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
DOB08/30/2013FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
DOB12/31/2009V-DOB VIOLATION - ACTIVE
HPD08/24/2005SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW/FRAME IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT H43, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5401'', AT SOUTH
HPD08/24/2005SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT H43, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5401'', AT SOUTH
DOB04/04/2004V-DOB VIOLATION - ACTIVE
ECB11/15/20243307.6.4.10 FOUNDING. AT TIME OF INSPECTION I OBSERVED 6 STORY RESIDENTIAL BUILDING SIDEWALK SHED IN PLACE EXPOSURE 1 AND 4.I OBSERVED SERVAL VERTICAL POST NOT ON SUPPORTING SOLID FOOTING PLANK AND HAS ROTTEN MNothing owed — awaiting certificate of correction
ECB12/19/2022FAILURE TO PROVIDE REQUIRED SAFETY MEASURES TO PROTECT PUBLIC SAFETY. NOTE FISP3 UNSAFE NOTIFICATION#911999 DATED ON 12/14/2022 FILED FOR THIS BUILDING.HOWEVER AS OF TODAY 12/19/2022 PARTIAL INADEQUATE SIDEWALKNothing owed — awaiting certificate of correction
ECB01/21/2022FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES.OBSERVED MULTIPLELARGE CRACKS ON TWO SIDES OF A BIG MASONRY,GRIMEY AND BROKEN GLASS WINDOW PANES ON GROUND LEVEL AT EXP3 EAST ELEVATION.I OBSERVED DEFECTIVENothing owed — awaiting certificate of correction
ECB12/07/2021FAILURE TO MAINTAIN BLDG EXTERIOR FACADE/WALLS&APPURTENANCES.NOTE:ATOI,OBSERVED@EXP3,E ELEVATION STEP CRACKING IN CHIMNEY FACADE.OPEN MORTARJOINTS,INADEQUATE A/C SUPPORT.EXP1,E ELEVATION OBSERVED FLOWER POTS ONNothing owed — awaiting certificate of correction
ECB04/23/2016FAILURE TO MAINTAIN EXTERIOR BLDG FACADE. NOTED: EAST ELEVATION EXP#1 (NETHERLAND AV) STEP CARCK AND LOOSE MORTAR AT CHIMNEY MASONRY FACADE WERE OBSERVED.RMDY:MAINTAIN EXTERIOR BLDG FACADE,PROVIDE SAFETY MEASURNothing owed — awaiting certificate of correction