← Back
Three families
541A MACON STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3046523
💬 Discuss this project
1882Year Built
2Stories
C0Building Class
R6BZoning
2,220 sfGross Floor Area
3Units
Three families · 1,667 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/13/2022$2.0M—— → —$890/sf building
04/08/2020$1.4M—DECKER DEVELOPMENT, LLC → Private party$642/sf building
10/07/2019$825K—— → —$372/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SCADUTO ARCHITECT103/17/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LOPOPOLO IRON WORKS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL SCADUTO ARCHITECT4833103/17/2021
Building Lifecycle
All (14)Filed (1)Permit Issued (1)Signed Off (1)Inspection (3)Objection (8)
03/17/2022
Signed off — Alteration
new deck in rear yard per tppn 04/03. replace window with door in same frame. no change to use, or occupancy.
B00479606-I1
03/16/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/28/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/21/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/14/2021
Permit issued — General Construction
B00479606-I1-GC
03/22/2021
Objection raised — Energy
03/22/2021
Objection resolved — Addressed
03/22/2021
Objection raised — Admin
03/22/2021
Objection resolved — Addressed
03/22/2021
Objection raised — Scope
03/22/2021
Objection resolved — Addressed
03/22/2021
Objection raised — Other
03/22/2021
Objection resolved — Addressed
03/17/2021
Filed — Alteration
new deck in rear yard per tppn 04/03. replace window with door in same frame. no change to use, or occupancy.
B00479606-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLOPOPOLO IRON WORKS INC07/14/2021
2 projects · most recent 01/16/2020
General Wiring
FiledStatusContractorScope
01/16/2020CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
01/09/2020CompletePOWER SURGE ELECTRIC, INC3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/16/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/28/2021Pass-Final General Construction Non-Directive 14PassView ↗
12/21/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00479606-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026B00479606-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00479606-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00479606-I1Open ↗