← Back
Two family brick
542 76 STREET
BROOKLYN · BIN 3149315
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R5BZoning
1,740 sfGross Floor Area
2Units
5 Open Violations ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 2 filings · 9 docs
Floor 1
Cellar2p · 2 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALFRED C. BARTOLOMEO,AIA,ARCHITECT210/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WERNER ZLOKLIKOVITSGeneral Contractor203/21/2026
K.H. WERBER PLBG CO INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GAMILL ENGINEERING, P.C.1773110/26/2021
Building Lifecycle
All (28)Filed (2)Permit Issued (2)Signed Off (2)Violation (16)Inspection (5)Special Inspection (1)
03/11/2022
Signed off — Alteration
B00597959-I1
03/11/2022
Signed off — Alteration
CAP & REMOVE GAS RANGE, SINK & SHOWER IN CELLAR IN ORDER TO DISMISS VIOLATION NUMBERS 35485169L, 35477066Z & 35477067K. REPLACE SLOP SINK, WASHER & DRYER IN CELLAR AND LEGALIZE TOILET & LAVATORY SINK IN CELLAR.
B00598005-I1
02/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2021
Permit issued — Plumbing
B00598005-I1-PL
12/07/2021
Permit issued — General Construction
B00597959-I1-GC
10/26/2021
Filed — Alteration
B00597959-I1
10/26/2021
Filed — Alteration
CAP & REMOVE GAS RANGE, SINK & SHOWER IN CELLAR IN ORDER TO DISMISS VIOLATION NUMBERS 35485169L, 35477066Z & 35477067K. REPLACE SLOP SINK, WASHER & DRYER IN CELLAR AND LEGALIZE TOILET & LAVATORY SINK IN CELLAR.
B00598005-I1
10/26/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Alfred Bartolomeo
10/08/2021
Violation issued (ECB, closed)
Construction
08/25/2021
Violation issued (ECB, closed)
Construction
06/29/2021
Violation issued (ECB, closed)
Construction
04/13/2021
Violation issued (ECB, closed)
Construction
12/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2020
Violation issued (ECB, closed)
Construction
08/26/2020
Violation issued (ECB, closed)
Construction
08/26/2020
Violation issued (ECB, closed)
Unknown
07/28/2020
Violation issued (HPD, open)
I
07/20/2020
Violation issued (HPD, closed)
C
07/20/2020
Violation issued (HPD, open)
I
07/06/2020
Violation issued (HPD, open)
B
07/06/2020
Violation issued (HPD, open)
B
07/06/2020
Violation issued (HPD, open)
B
07/06/2020
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offK.H. WERBER PLBG CO INC12/10/2021
DOB NOWGeneral ConstructionSigned-offWERNER ZLOKLIKOVITS12/07/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
10/26/2021HVAC-R and service water piping design and insulationAlfred Bartolomeoenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00597959-I1Request digital key ↗
08/31/2026B00598005-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/31/2026B00597959-I1Open ↗
08/31/2026B00598005-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026B00598005-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026B00597959-I1Open ↗
08/31/2026B00598005-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/31/2026B00598005-I1Open ↗
08/13/2026B00597959-I1Open ↗