← Back
BuildNYC
One story - permanent living quarter
543 TODT HILL ROAD
STATEN ISLAND · BIN 5022818
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R1-1Zoning
788 sfGross Floor Area
1Units
One story - permanent living quarter · 12,772 sf lot · 0.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 1Unit PH5Under Construction18p · 2 filings · 20 docs
CellarUnder Construction16p · 2 filings · 20 docs
BasementUnder Construction3p · 2 filings · 20 docs
Sub-BasementUnder Construction14p · 1 filing · 6 docs
Site & exteriorUnder Construction45p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture507/06/2026
Baalbaki & Associates Engineering101/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A Inspections203/21/2026
Aprile Bonamo Filing Rep403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zaim Contractorspecialty_contractor508/01/2026
Zaim ContractorScaffold207/31/2026
K.M.D. Mechanical 1443Plumbing106/27/2026
Liberty Plumbing & HeatingGeneral Contractor106/04/2003
Liberty Plumbing & HeatingPlumbing106/04/2003
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Design Architecture7159207/06/2026
Building Lifecycle
10/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/31/2026
Permit renewed — Mechanical Systems
Renewed without changes
S01079181-I1-MS
07/30/2026
Permit renewed — Mechanical Systems
Renewed without changes
S01079181-I1-GC
07/30/2026
Permit renewed — Construction Fence
Renewed without changes
S01079181-S4-FN
72 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedZaim Contractor07/31/2026
DOB NOWMechanical SystemsPermit IssuedZaim Contractor07/30/2026
DOB NOWConstruction FencePermit IssuedZaim Contractor07/30/2026
DOB NOWPlumbingPermit IssuedK.M.D. Mechanical 144303/25/2026
DOB NOWConstruction FencePermit IssuedSuffolk Construction08/13/2025
DOB NOWMechanical SystemsPermit IssuedSuffolk Construction07/23/2025
DOB NOWMechanical SystemsPermit IssuedSuffolk Construction07/23/2025
BISPLRE-ISSUEDNYC Parks & Recreation06/04/2003
BISMHISSUEDLiberty Plumbing & Heating06/04/2003
1 project · most recent 07/06/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
07/06/2026Permit IssuedZaim ContractorHeating and Air Conditioning Systems
1 project · most recent 02/01/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/01/2026Permit IssuedK.M.D. Mechanical 1443Gas, Storm, Water/Sanitary
1 project · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026Permit IssuedApex ElectricGeneral Wiring
1 project · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026Permit IssuedZaim Contractor—
1 project · most recent 07/06/2026
Fence
FiledStatusContractorScope
07/06/2026Permit IssuedZaim ContractorFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/25/2026Electric vehicle service equipment requirementsDaniel Ryanenergy_progress
06/25/2026Chimneys and ventsDaniel Ryanspecial
06/25/2026Concrete - Cast-In-PlaceDaniel Ryanspecial
06/25/2026Fire-Resistant Penetrations and JointsDaniel Ryanspecial
06/25/2026Mechanical SystemsDaniel Ryanspecial
06/25/2026Structural Stability – Alterations of existing buildingsDaniel Ryanspecial
06/25/2026Subgrade InspectionsDaniel Ryanspecial
06/25/2026Energy Code Compliance InspectionsDaniel Ryanprogress
06/25/2026FinalDaniel Ryanprogress
06/25/2026Air barrier — testing Daniel Ryanenergy_progress
06/25/2026HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
06/25/2026Ventilation and air distribution systemDaniel Ryanenergy_progress
06/25/2026Fenestration air leakageDaniel Ryanenergy_progress
06/25/2026Air barrier - visual inspectionDaniel Ryanenergy_progress
06/25/2026Insulation placement and R valuesDaniel Ryanenergy_progress
06/25/2026HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
06/25/2026Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
06/25/2026Maintenance informationDaniel Ryanenergy_progress
06/25/2026Fenestration areasDaniel Ryanenergy_progress
06/25/2026HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
06/25/2026Permanent certificateDaniel Ryanenergy_progress
06/25/2026Interior lighting powerDaniel Ryanenergy_progress
01/14/2025Chimneys and vents—special
01/14/2025Concrete - Cast-In-Place—special
01/14/2025Fire-Resistant Penetrations and Joints—special
Latest 25 of 44.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account