Nursing home
5434 2 AVENUE
BROOKLYN · BIN 3344923
💬 Discuss this project
1931Year Built
7Stories
I6Building Class
R6Zoning
110,000 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸FISP: SAFEFDNY Report ↗
Nursing home · 45,000 sf lot · 2.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction36p · 2 filings · 20 docs
Floor 81p · 1 filing · 7 docs
Floor 7Under Construction30p · 3 filings · 20 docs
Floor 6Under Construction13p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3Under Construction37p · 2 filings · 20 docs
Floor 2Under Construction25p · 3 filings · 20 docs
Floor 1Under Construction39p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYULH1007/08/2026
HOLT CONSTRUCTION404/09/2026
BIGMAN BROTHER, INC.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.3203/21/2026
WILLIAM VITACCO ASSOCIATES803/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE GENERAL CONTRACTINGeneral Contractor707/08/2026
PAUL M MAINTENANCE INCGeneral Contractor607/08/2026
HOLT CONSTRUCTION CORPGeneral Contractor604/09/2026
AMERICON CONSTRUCTION INC.General Contractor404/09/2026
CARDOZA PLUMBING CORPPlumbing307/08/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
TRISTATE PLBG SVCS CORPPlumbing206/27/2026
B.R. FRIES & ASSOCIATES LLCGeneral Contractor203/21/2026
ALLIANCE PLUMBING CORPPlumbing207/08/2026
BIGMAN BROS., INC.Electrical203/22/2026
SCOTT BIGMANElectrical103/21/2026
ROCKMOR ELEC. ENTERPR INCElectrical103/22/2026
BRIAN CLARKEElectrical103/21/2026
CARLITOS CONTRACTING CORPGeneral Contractor104/09/2026
NYC FIRE SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4232012/10/2025
ATLANTIC ENGINEERINGLABOR1381104/07/2021
Building Lifecycle
All (171)Filed (27)Permit Issued (34)Signed Off (9)Facade (FISP) (9)Violation (60)Inspection (32)
09/01/2026
Permit issued — Sprinklers
B01272499-I1-EW-SP
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/09/2026
Signed off — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA 3RD FLOOR REHAB - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01277014-I1
06/11/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/11/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2026
Permit issued — Sprinklers
B01293279-S3-EW-SP
04/02/2026
Permit issued — General Construction
B01277014-I1-GC
04/02/2026
Permit issued — Structural
B01277014-S4-ST
04/02/2026
Permit issued — Mechanical Systems
B01277014-S1-MS
03/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Permit issued — Mechanical Systems
B01293279-S1-MS
03/02/2026
Permit issued — Plumbing
B01293279-S2-PL
02/24/2026
Signed off — Alteration
B00497370-I1
02/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/10/2026
Permit issued — Supported Scaffold
B01357276-I1-SF
02/09/2026
Filed — Alteration
B01357276-I1
01/22/2026
Signed off — Alteration
Alteration of existing offices at first floor. No change to egress, use, or occupancy.
B01013719-I1
01/22/2026
Permit issued — General Construction
B01272473-I1-GC
01/22/2026
Permit issued — Mechanical Systems
B01272473-S3-MS
01/21/2026
Signed off — Alteration
Alteration of existing offices at first floor. No change to egress, use, or occupancy.
B01013719-S2
01/07/2026
Permit issued — General Construction
B01293279-I1-GC
12/19/2025
Permit issued — General Construction
B01314828-I1-GC
12/19/2025
Permit issued — Mechanical Systems
B01314828-S1-MS
12/17/2025
Permit issued — Sprinklers
B01277014-S3-EW-SP
12/16/2025
Permit issued — Mechanical Systems
B01013719-S2-MS
12/10/2025
Filed — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA GYM REHAB - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01314828-S1
11/21/2025
Filed — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA GYM REHAB - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01314828-I1
11/13/2025
Filed — Alteration
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
B01293279-S3
11/11/2025
Filed — Alteration
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
B01293279-S2
11/11/2025
Filed — Alteration
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
B01293279-S1
11/07/2025
Filed — Alteration
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
B01293279-I1
11/07/2025
Permit issued — Plumbing
B01277014-S2-PL
11/05/2025
Filed — Alteration
SPRINKLER MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01272499-I1
10/29/2025
Permit issued — General Construction
B01277014-I1-GC
10/29/2025
Permit issued — Mechanical Systems
B01277014-S1-MS
10/29/2025
Permit issued — Structural
B01277014-S4-ST
10/23/2025
Filed — Alteration
B01272473-S3
10/06/2025
Filed — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA 3RD FLOOR REHAB - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01277014-S2
10/03/2025
Filed — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA 3RD FLOOR REHAB - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01277014-S3
10/02/2025
Filed — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA 3RD FLOOR REHAB - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01277014-I1
10/02/2025
Filed — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA 3RD FLOOR REHAB - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01277014-S4
10/02/2025
Filed — Alteration
NYU LANGONE - BROOKLYN AUGUSTANA 3RD FLOOR REHAB - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01277014-S1
09/03/2025
Filed — Alteration
B01272473-I1
08/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/21/2025
Permit issued — Sprinklers
B01013719-S3-EW-SP
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedARCHER CONSULTANTS GROUP09/01/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP04/10/2026
DOB NOWGeneral ConstructionSigned-offHOLT CONSTRUCTION CORP04/02/2026
DOB NOWStructuralPermit IssuedHOLT CONSTRUCTION CORP04/02/2026
DOB NOWMechanical SystemsPermit IssuedHOLT CONSTRUCTION CORP04/02/2026
DOB NOWMechanical SystemsPermit IssuedAMERICON CONSTRUCTION INC.03/03/2026
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP03/02/2026
DOB NOWSupported ScaffoldPermit IssuedCARLITOS CONTRACTING CORP02/10/2026
DOB NOWGeneral ConstructionPermit IssuedAMERICON CONSTRUCTION INC.01/22/2026
DOB NOWMechanical SystemsPermit IssuedAMERICON CONSTRUCTION INC.01/22/2026
DOB NOWGeneral ConstructionPermit IssuedAMERICON CONSTRUCTION INC.01/07/2026
DOB NOWGeneral ConstructionPermit IssuedEMPIRE GENERAL CONTRACTIN12/19/2025
DOB NOWMechanical SystemsPermit IssuedEMPIRE GENERAL CONTRACTIN12/19/2025
DOB NOWSprinklersPermit IssuedNYC FIRE SPRINKLER CORP12/17/2025
DOB NOWMechanical SystemsSigned-offPAUL M MAINTENANCE INC12/16/2025
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP11/07/2025
DOB NOWGeneral ConstructionSigned-offHOLT CONSTRUCTION CORP10/29/2025
DOB NOWMechanical SystemsPermit IssuedHOLT CONSTRUCTION CORP10/29/2025
DOB NOWStructuralPermit IssuedHOLT CONSTRUCTION CORP10/29/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP07/21/2025
DOB NOWMechanical SystemsSigned-offPAUL M MAINTENANCE INC04/17/2025
DOB NOWGeneral ConstructionSigned-offPAUL M MAINTENANCE INC04/16/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/23/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP07/05/2024
DOB NOWGeneral ConstructionSigned-offPAUL M MAINTENANCE INC05/03/2024
DOB NOWMechanical SystemsSigned-offPAUL M MAINTENANCE INC05/03/2024
DOB NOWMechanical SystemsSigned-offB.R. FRIES & ASSOCIATES L03/07/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE02/20/2024
DOB NOWGeneral ConstructionSigned-offEMPIRE GENERAL CONTRACTIN05/10/2022
DOB NOWMechanical SystemsSigned-offEMPIRE GENERAL CONTRACTIN05/10/2022
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP04/11/2022
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP04/06/2022
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP05/10/2021
DOB NOWMechanical SystemsSigned-offEMPIRE GENERAL CONTRACTIN10/28/2020
BISSDISSUEDRIGHTWAY PLBG & HTG INC08/10/2016
BISOTISSUEDEXPERT MAINTENANCE CORP05/02/2016
BISOTISSUEDEXPERT MAINTENANCE CORP12/16/2015
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING07/29/2015
BISOTISSUEDPAUL M MAINTENANCE INC03/03/2014
BISMHISSUEDPAUL M MAINTENANCE INC03/03/2014
+ 20 more permits on file
3 projects · most recent 12/10/2025
Heating Systems Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/10/2025Permit IssuedEMPIRE GENERAL CONTRACTINHeating Systems
Heating
Qmark CWH3307F 3 kW · Electric Heater ×3
11/13/2025Permit IssuedAMERICON CONSTRUCTION INCAir Conditioning Systems
Cooling
Mitsubishi Electric FXAQ24PVJU 24,000 BTU · Vrf Indoor ×1
PUY-AH24NL 24,000 BTU · Heat Pump Outdoor ×1
04/29/2024Signed-offPAUL M MAINTENANCE INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARNU053TRD4 5,500 BTU · Vrf Indoor ×3
ARNU093TRD4 9,600 BTU · Vrf Indoor ×2
ARUM036GSS5 36,000 BTU · Vrf Outdoor ×1
LSN243HLV3 24,000 BTU · Vrf Indoor ×1
LSU243HLV3 24,000 BTU · Condensing Unit ×1
Ventilation
Greenheck CSP-700-VG 230 CFM · Exhaust Fan ×1
4 projects · most recent 11/13/2025
FiledStatusContractorScope
11/13/2025Permit IssuedSIRINA FIRE PROT CORP8 heads
11/05/2025Permit IssuedARCHER CONSULTANTS GROUP16 heads
10/06/2025Permit IssuedNYC FIRE SPRINKLER CORP151 heads
04/29/2024Signed-offSIRINA FIRE PROT CORP—
3 projects · most recent 11/13/2025
Water/Sanitary
FiledStatusContractorScope
11/13/2025Signed-offTRISTATE PLBG SVCS CORPWater/Sanitary
10/06/2025Permit IssuedTRISTATE PLBG SVCS CORPWater/Sanitary
04/29/2024Signed-offALLIANCE PLUMBING CORPWater/Sanitary
8 projects · most recent 01/13/2026
General Wiring Lighting
FiledStatusContractorScope
01/13/2026Permit IssuedBIGMAN BROS., INC.General Wiring
12/02/2025Permit IssuedHATZEL AND BUEHLER, INCGeneral Wiring
11/19/2025Permit IssuedBIGMAN BROS., INC.General Wiring, Lighting
11/19/2025Permit IssuedBIGMAN BROS., INC.General Wiring, Lighting
10/16/2025Permit IssuedFOREST ELECTRIC CORP.General Wiring
06/03/2025CompleteBIGMAN BROS., INC.General Wiring
01/14/2025CompleteROCKMOR ELEC. ENTERPR INCGeneral Wiring
03/15/2024CompleteBIGMAN BROS., INC.General Wiring
1 project · most recent 10/06/2025
Steel
FiledStatusContractorScope
10/06/2025Signed-offHOLT CONSTRUCTION CORPSteel
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/11/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/11/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
02/02/2026Energy Code Compliance InspectionsYoung Suhprogress
02/02/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
12/03/2025Post-installed AnchorsYoung Suhspecial
11/20/2025Interior lighting powerYoung Suhenergy_progress
11/20/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
11/20/2025Maintenance informationYoung Suhenergy_progress
11/20/2025Lighting controlsYoung Suhenergy_progress
11/20/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
11/20/2025Electrical motors and elevatorsYoung Suhenergy_progress
11/20/2025Duct leakage testing, insulation and designYoung Suhenergy_progress
11/06/2025Post-installed AnchorsYoung Suhspecial
11/06/2025Energy Code Compliance InspectionsYoung Suhprogress
11/06/2025Fire-Resistance Rated ConstructionYoung Suhprogress
11/06/2025FinalYoung Suhprogress
11/06/2025Mechanical SystemsYoung Suhspecial
11/06/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
11/06/2025FinalYoung Suhprogress
11/05/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
11/05/2025Maintenance informationYoung Suhenergy_progress
11/05/2025Ventilation and air distribution systemYoung Suhenergy_progress
11/05/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
11/05/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
11/05/2025Duct leakage testing, insulation and designYoung Suhenergy_progress
10/07/2025Energy Code Compliance InspectionsYoung Suhprogress
10/07/2025FinalYoung Suhprogress
Latest 25 of 105.
▾Documents — 264 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch24
09/01/2026B00497420-I1Request digital key ↗
09/01/2026B00497370-I1Request digital key ↗
08/26/2026B00913529-P2Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00357422-I1Request digital key ↗
08/31/2026B00467465-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/31/2026B00467535-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00466508-I1Request digital key ↗
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION13
08/11/2016321391677Open ↗
05/16/2016340335444Open ↗
12/14/2015340335444Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
08/04/2016321391677Open ↗
12/14/2015340335444Open ↗
07/28/2015340285863Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications96
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/01/2026B00497420-I1Open ↗
09/01/2026B00497370-I1Open ↗
09/01/2026B00466508-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B01314828-S1Open ↗
09/23/2026B01314828-S1Open ↗
09/23/2026B01293279-S1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
11/02/2018340335444Open ↗
08/15/2018340285863Open ↗
01/25/2017321391677Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026B01314828-S1Open ↗
09/23/2026B01277014-S3Open ↗
09/23/2026B01293279-S1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/04/2016321391677Open ↗
12/14/2015340335444Open ↗
07/28/2015340285863Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/04/2016321391677Open ↗
06/11/2013320867344Open ↗
10/27/2008310212597Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/11/2013320867344Open ↗
06/11/2013320867344Open ↗
10/27/2008310212597Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/14/2015340335444Open ↗
07/28/2015340285863Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/14/2015340335444Open ↗
07/28/2015340285863Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
06/26/2013320424402Open ↗
06/11/2013320867344Open ↗
01/26/2012320424402Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
01/30/2014320867344Open ↗
01/22/2014320867344Open ↗
10/30/2013320424402Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
05/20/2013320424402Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/04/2016321391677Open ↗
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/01/2026B00466508-I1Open ↗
08/31/2026B00467535-I1Open ↗
08/31/2026B00467465-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/04/2016321391677Open ↗
12/14/2015340335444Open ↗
06/11/2013320867344Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/26/2012320424402Open ↗
10/27/2008310212597Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/02/2018340335444Open ↗
10/10/2013320867344Open ↗
06/11/2013320867344Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/02/2018340335444Open ↗
06/17/2014320867344Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00466508-I1Open ↗
08/13/2026B00467465-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/28/2015340285863Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/14/2015340335444Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/17/2014320867344Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/14/2015340335444Open ↗
▸BISNYCECC ANALYSIS1
12/14/2015340335444Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/14/2015340335444Open ↗
07/28/2015340285863Open ↗
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
09/01/2026B00497420-I1Open ↗
09/01/2026B00497370-I1Open ↗
09/01/2026B00466508-I1Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/02/2018340335444Open ↗
08/15/2018340285863Open ↗
01/25/2017321391677Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/11/2013320867344Open ↗
01/26/2012320424402Open ↗
10/20/2008310212597Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/30/2014320867344Open ↗
01/30/2014320867344Open ↗
01/30/2014320867344Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
11/02/2018340335444Open ↗
01/25/2017321391677Open ↗
08/04/2016321391677Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET4
08/04/2016321391677Open ↗
06/20/2013320867344Open ↗
06/20/2013320867344Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
06/12/2014320867344Open ↗
05/30/2014320867344Open ↗
05/30/2014320867344Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
11/02/2018340335444Open ↗
08/15/2018340285863Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/14/2015340335444Open ↗
07/28/2015340285863Open ↗
▸Other Documents2
▸BISFEE EXEMPTION DOCUMENTATION2
12/14/2015340335444Open ↗
07/28/2015340285863Open ↗