← Back
Garden apartments
544 CLAREMONT PARKWAY
BRONX · Claremont Village-Claremont (East) · BIN 2092128
💬 Discuss this project
1986Year Built
3Stories
C9Building Class
R7-1Zoning
66,990 sfGross Floor Area
74Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸
Garden apartments · Owner of record: UNION HOUSING PRESERVATION LP. · 110,000 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof11p · 4 filings · 20 docs
Floor 211p · 1 filing · 4 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 321p · 2 filings · 12 docs
Floor 220p · 2 filings · 12 docs
Floor 121p · 2 filings · 12 docs
Cellar26p · 2 filings · 20 docs
Site & exterior8p · 2 filings · 11 docs
Filed — no permit issued23p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2407/08/2026
NYCHA1907/08/2026
N Y C HOUSING AUTHORITY703/21/2026
UNION HOUSING PRESERVATION607/08/2026
UAC PACT HDFC507/08/2026
CVM CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC403/21/2026
W J PROFESSIONAL EXPEDITING1403/21/2026
S R SOLAR DESIGN203/21/2026
PLANNING FOR SAFETY103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RENEWAL CONSTRUCTION SERVICESGeneral Contractor2207/08/2026
OROSZ, JOSEPHElectrical603/21/2026
VITAL PLUMBING, INCPlumbing407/08/2026
IOVINE, MICHAELElectrical403/21/2026
PHILLIPS, WENDELLElectrical403/21/2026
MOSHE ROTHElectrical303/21/2026
B.P. ELECTRIC CORPElectrical103/22/2026
CVM CONSTRUCTION CORPGeneral Contractor107/08/2026
EMES SOLAR INCGeneral Contractor107/08/2026
MAC FHIONNGHAILE & SONSElectrical103/22/2026
MAXWELL PLUMB MECH. CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244101/20/2025
DOMANI INSPECTION SERVICE843602/02/2024
DOKA ENGINEERING PC1158207/21/2023
Building Lifecycle
All (122)Filed (11)Permit Issued (24)Signed Off (4)Violation (42)Inspection (11)Special Inspection (30)
03/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/07/2025
Signed off — Alteration
FILING FOR FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
X00918470-I1
11/06/2025
Signed off — Alteration
X00860836-I1
09/08/2025
Signed off — Alteration
Filing plans for Tenant-in-Place roof renovation to include roof shingles. no change in use egress or occupancy
X00892260-I1
05/15/2025
Permit issued — General Construction
X00918470-I1-GC
05/15/2025
Permit issued — General Construction
X00892260-I1-GC
05/14/2025
Permit issued — General Construction
X00860836-I1-GC
02/18/2025
Permit issued — General Construction
X00918470-I1-GC
02/14/2025
Permit issued — General Construction
X00892260-I1-GC
02/14/2025
Permit issued — General Construction
X00860836-I1-GC
02/10/2025
Permit issued — Solar
X01163113-I1-SL
01/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/20/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01163113-I1
01/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/06/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
01/06/2025
Special inspection requirement — Final
NARESH MAHANGU
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
12/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/25/2024
Violation issued (HPD, closed)
B
12/25/2024
Violation issued (HPD, closed)
A
10/12/2024
Violation issued (HPD, closed)
A
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/09/2024
Permit issued — General Construction
X00918470-I1-GC
05/10/2024
Permit issued — General Construction
X00860836-I1-GC
05/10/2024
Permit issued — General Construction
X00892260-I1-GC
04/10/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
04/05/2024
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER DRAWINGS.
X00941425-I1
04/04/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/12/2024
Filed — Alteration
Removal and replacement of gas riser, heating and domestic distribution system as part of tenant in place moderate rehabilitation. No change in egress , use , or occupancy.
X00992730-P2
03/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/29/2024
Permit issued — Plumbing
X00992730-I1-PL
02/12/2024
Permit issued — General Construction
X00892260-I1-GC
02/09/2024
Permit issued — General Construction
X00860836-I1-GC
02/02/2024
Filed — Alteration
Removal and replacement of gas riser, heating and domestic distribution system as part of tenant in place moderate rehabilitation. No change in egress , use , or occupancy.
X00992730-I1
02/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2024
Filed — Alteration
Renovation of Mechanical Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use or occupancy.
X00931456-I1
01/03/2024
Permit issued — General Construction
X00860836-I1-GC
01/02/2024
Permit issued — General Construction
X00860836-I1-GC
01/02/2024
Permit issued — General Construction
X00892260-I1-GC
12/27/2023
Special inspection requirement — Chimneys and vents
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
12/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
12/01/2023
Permit issued — General Construction
X00860836-I1-GC
11/29/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/22/2023
Filed — Alteration
Renovation of Plumbing Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use, or occupancy.
X00931468-I1
11/16/2023
Violation issued (HPD, closed)
I
11/15/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
10/05/2023
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER DRAWINGS.
X00941425-I1
10/05/2023
Permit issued — Sidewalk Shed
X00941425-I1-SH
09/29/2023
Permit issued — General Construction
X00860836-I1-GC
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV05/15/2025
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV05/15/2025
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV05/14/2025
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV02/18/2025
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV02/14/2025
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV02/14/2025
DOB NOWSolarPermit IssuedEMES SOLAR INC02/10/2025
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV08/09/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV05/10/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV05/10/2024
DOB NOWPlumbingPermit IssuedMAXWELL PLUMB MECH. CORP02/29/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV02/12/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV02/09/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV01/03/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV01/02/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV01/02/2024
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV12/01/2023
DOB NOWSidewalk ShedSigned-offCVM CONSTRUCTION CORP10/05/2023
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV09/29/2023
DOB NOWGeneral ConstructionSigned-offRENEWAL CONSTRUCTION SERV09/25/2023
DOB NOWBoiler EquipmentPermit IssuedVITAL PLUMBING, INC03/01/2023
DOB NOWBoiler EquipmentPermit IssuedVITAL PLUMBING, INC10/19/2022
DOB NOWBoiler EquipmentPermit IssuedVITAL PLUMBING, INC06/23/2022
DOB NOWBoiler EquipmentPermit IssuedVITAL PLUMBING, INC07/22/2021
BISPLISSUEDDUAL FUEL PLUBING & HTING02/23/2007
BISBLISSUEDPROGRAM UNLIMITED PLBG. & HTG. I04/15/2005
BISPLISSUEDPROGRAM UNLIMITED PLBG. & HTG. I03/10/2005
BISPLISSUEDPROGRAM UNLIMITED PLBG. & HTG. I03/12/2004
1 project · most recent 01/08/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2024——Heating Systems
Heating
Markel F2F5103N 10,300 BTU · Electric Heater ×1
2 projects · most recent 03/12/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/12/2024Permit IssuedMAXWELL PLUMB MECH. CORPGas
11/22/2023——Storm, Water/Sanitary
5 projects · most recent 01/06/2025
Boiler Controls
FiledStatusContractorScope
01/06/2025CompleteB.P. ELECTRIC CORP—
12/17/2024Permit IssuedB.P. ELECTRIC CORP—
12/03/2024Permit IssuedB.P. ELECTRIC CORP—
11/14/2023Permit IssuedMAC FHIONNGHAILE & SONS—
04/08/2022CompleteKATCO ELECTRIC INCBoiler Controls
1 project · most recent 01/20/2025
FiledStatusContractorScope
01/20/2025Permit IssuedEMES SOLAR INC299 panels, 155.48 kw, 1,989,566.5 roof_area_sqft
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
01/06/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
01/06/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/06/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
01/06/2025FinalNARESH MAHANGUprogress
01/06/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
12/27/2023Chimneys and ventsJOHN MCMONAGLEspecial
12/27/2023Maintenance informationJOHN MCMONAGLEenergy_progress
12/27/2023HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
12/27/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
12/27/2023Heating SystemsJOHN MCMONAGLEspecial
12/27/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/27/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
12/27/2023Shutoff dampersJOHN MCMONAGLEenergy_progress
12/27/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
11/07/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/14/2023Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
09/14/2023Fenestration air leakageJOHN MCMONAGLEenergy_progress
09/14/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
09/14/2023Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
09/08/2023Mechanical SystemsJOHN MCMONAGLEspecial
09/08/2023Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
09/08/2023FinalJOHN MCMONAGLEprogress
09/08/2023Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
08/11/2023FinalJOHN MCMONAGLEprogress
08/11/2023Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
Latest 25 of 38.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/23/2026X00860836-I1Request digital key ↗
08/22/2026X00536917-P1Request digital key ↗
08/22/2026X00536917-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/23/2026X00860836-I1Open ↗
08/22/2026X00536917-I1Open ↗
08/22/2026X00892260-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026X00536917-I1Open ↗
09/01/2026X00918470-I1Open ↗
09/01/2026X00918470-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X00536917-I1Open ↗
09/01/2026X00918470-I1Open ↗
09/01/2026X00931456-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/23/2026X00860836-I1Open ↗
08/22/2026X00536917-I1Open ↗
08/22/2026X00892260-I1Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/22/2026X00536917-I1Open ↗
08/21/2026X00992730-I1Open ↗
08/13/2026X00941425-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDCLA Approval of Artwork1
08/13/2026X00941425-I1Open ↗