← Back
All parking garages
Mount Sinai Kidney Center
545 EAST 116 STREET · East Harlem (North) · BIN 1081374
💬 Discuss this project
2007Year Built
7Stories
G1Building Class
C4-4Zoning
617,062 sfGross Floor Area
1Units
LL97 Covered3 Open Violations 1 unresolved · 2 paperwork only ▸FISP: SWARMP
All parking garages · Owner of record: TIAGO HOLDINGS, LLC · 92,136 sf lot · 6.7 FAR built · Flood zone X500
Locations of Work
StructuralElectricalEquipmentGeneral
Roof2p · 1 filing · 2 docs
Site & exterior12p · 2 filings · 8 docs
Filed — no permit issued5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIAGO HOLDINGS9607/08/2026
BDG GOTHAM PLAZA1304/21/2026
JEBRAHAN303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANFORD BERGER108/04/2026
WELLWORTH CONSULTING LLC209/04/2025
WJE ENGINEERS & ARCHITECTS, P.C.105/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
JAM CONSULTANTS, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor207/08/2026
JOSEPH SORTINOElectrical103/21/2026
JTE ELECTRICAL SERVICESElectrical103/22/2026
SKYLINE RESTORATION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481407/29/2025
PROJECT TACTICAL SOLUTION5859105/22/2024
Building Lifecycle
All (107)Filed (9)Permit Issued (5)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (1)Objection (6)Special Inspection (12)
08/07/2026
Objection resolved — Addressed
08/07/2026
Objection resolved — Addressed
08/07/2026
Objection resolved — Addressed
08/06/2026
Objection raised — Other
08/06/2026
Objection raised — Other
08/06/2026
Objection raised — Other
08/04/2026
Filed — No Work
M01438115-I1
04/23/2026
Cycle 9 facade report signed — SWARMP
04/18/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01389454-I1
04/16/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT FDR DRIVE AND EAST 61TH STREET ELEVATIONS.
M01164177-I1
03/03/2026
Cycle 9 facade inspection completed
02/27/2026
Permit issued — Suspended Scaffold
M01146125-I1-SC
01/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/21/2026
Permit issued — Sidewalk Shed
M01164177-I1-SH
01/02/2026
Violation issued (ECB, closed)
Construction
12/16/2025
Cycle 9 facade report submitted
12/11/2025
Signed off — Alteration
M01041525-I1
09/04/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT FDR DRIVE AND EAST 61TH STREET ELEVATIONS.
M01164177-P1
07/29/2025
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #3, Added scaffold drops and outrigger beam details
M01146125-P3
07/29/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
07/29/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
06/06/2025
Cycle 9 facade report submitted
06/04/2025
Cycle 9 facade report signed — UNSAFE
04/30/2025
Cycle 9 facade inspection completed
03/17/2025
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #3, Added scaffold drops and outrigger beam details
M01146125-P2
03/01/2025
Violation issued (ECB, closed)
Construction
02/11/2025
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #3, Added scaffold drops and outrigger beam details
M01146125-P1
02/11/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
02/11/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
01/24/2025
Permit issued — Structural
M01041525-I1-ST
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2025
Permit issued — Sidewalk Shed
M01164177-I1-SH
01/14/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT FDR DRIVE AND EAST 61TH STREET ELEVATIONS.
M01164177-I1
12/31/2024
Violation issued (ECB, closed)
Elevators
12/31/2024
Violation issued (ECB, closed)
Elevators
12/31/2024
Violation issued (ECB, closed)
Elevators
12/31/2024
Violation issued (ECB, closed)
Elevators
12/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/20/2024
Permit issued — Suspended Scaffold
M01146125-I1-SC
11/27/2024
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #3, Added scaffold drops and outrigger beam details
M01146125-I1
11/19/2024
Violation issued (ECB, closed)
Construction
10/16/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2024
Violation issued (ECB, open)
Construction
05/22/2024
Filed — Alteration
M01041525-I1
04/25/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Max Lee
04/25/2024
Special inspection requirement — Structural Steel - Welding
Max Lee
04/25/2024
Special inspection requirement — Concrete - Cast-In-Place
Max Lee
04/25/2024
Special inspection requirement — Final
Max Lee
04/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Max Lee
04/25/2024
Special inspection requirement — Masonry
Max Lee
04/25/2024
Special inspection requirement — Post-installed Anchors
Max Lee
04/25/2024
Special inspection requirement — Structural Steel - Details
Max Lee
02/15/2024
Violation issued (ECB, open)
Local Law
07/07/2023
Violation issued (ECB, closed)
Elevators
02/21/2022
Cycle 9 facade report submitted
02/21/2022
Cycle 9 facade report signed — UNSAFE
02/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2022
Cycle 9 facade inspection completed
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC02/27/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/21/2026
DOB NOWStructuralSigned-offSKYLINE RESTORATION INC01/24/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/15/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC12/20/2024
BISOTISSUEDACE ATLAS CORPORATION12/19/2016
BISFSISSUEDACE-ATLAS PLBG & HTG LLC12/14/2016
BISPLISSUEDACCESS PLUMBING CORP01/12/2016
BISOTISSUEDBDG CONSTRUCTION CORP11/04/2015
BISOTISSUEDBDG CONSTRUCTION CORP11/04/2015
BISSPISSUEDGLENDALE CONT.P,H &ACINC01/06/2015
BISPLISSUEDGLENDALE CONT P,H&A/C INC08/11/2014
BISMHISSUEDBDG CONSTRUCTION CORP08/04/2014
BISOTISSUEDBDG CONSTRUCTION CORP08/01/2014
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN01/13/2011
BIS—ISSUEDRCDOLNER LLC04/01/2010
BISEQISSUEDRCDOLNER LLC03/31/2010
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDNORTH SHORE NEON SIGN CO11/23/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/30/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/30/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/24/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/24/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/24/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/24/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/24/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/24/2009
BIS—ISSUEDLANDMARK SIGNS & ELECT MA07/24/2009
BISOTRE-ISSUEDR C DOLNER LLC07/15/2009
BIS—ISSUEDR C DOLNER LLC02/24/2009
BISEQISSUEDR C DOLNER LLC02/24/2009
+ 15 more permits on file
3 projects · most recent 02/20/2025
General Wiring
FiledStatusContractorScope
02/20/2025CompleteJTE ELECTRICAL SERVICES—
12/17/2024CompleteTOP SHELF ELECTRIC CORP—
10/09/2018Permit IssuedMILLENNIUM MAINT & ELEC'LGeneral Wiring
2 projects · most recent 04/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/18/2026———
07/29/2025Permit IssuedSKYLINE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/29/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
07/29/2025Post-installed AnchorsLeo Leespecial
02/11/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
02/11/2025Post-installed AnchorsLeo Leespecial
04/25/2024Structural Steel - High Strength BoltingMax Leespecial
04/25/2024Structural Steel - WeldingMax Leespecial
04/25/2024Concrete - Cast-In-PlaceMax Leespecial
04/25/2024FinalMax Leeprogress
04/25/2024Structural Stability – Alterations of existing buildingsMax Leespecial
04/25/2024MasonryMax Leespecial
04/25/2024Post-installed AnchorsMax Leespecial
04/25/2024Structural Steel - DetailsMax Leespecial
▾Documents — 438 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/27/2026M01041525-I1Request digital key ↗
08/22/2026M01146125-P2Request digital key ↗
08/22/2026M01146125-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/15/2026M01438115-I1Request digital key ↗
▸Applications & Permits70
▸BISWORK PERMIT APPLICATION38
12/19/2016122262292Open ↗
12/16/2016140586809Open ↗
12/16/2016140586809Open ↗
Showing 3 of 38 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION32
09/05/2017123110025Open ↗
09/05/2017123110025Open ↗
12/16/2016140586809Open ↗
Showing 3 of 32 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZRD1-Zoning Resolution Determination3
09/06/2012120094548Open ↗
09/06/2012120094539Open ↗
09/06/2012120094502Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/08/2019104355243Open ↗
▸Seals & Professional Certifications125
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION75
09/05/2017123110025Open ↗
09/05/2017123110025Open ↗
04/18/2017140586809Open ↗
Showing 3 of 75 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026M01041525-I1Open ↗
09/01/2026M01146125-P1Open ↗
09/01/2026M01146125-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026M01164177-I1Open ↗
08/16/2026M01438115-I1Open ↗
08/13/2026M01164177-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/16/2016140586809Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/16/2016140586809Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/16/2016140586809Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/27/2026M01041525-I1Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE7
03/18/2015122125011Open ↗
03/03/2015122063006Open ↗
02/03/2015122063006Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/09/2015122262292Open ↗
09/11/2014122125011Open ↗
07/15/2014122063006Open ↗
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/16/2016140586809Open ↗
02/09/2015122262292Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
12/16/2016140586809Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
09/05/2017123110025Open ↗
04/18/2017140586809Open ↗
10/13/2015122063006Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/18/2017140586809Open ↗
10/13/2015122063006Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/16/2016140586809Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/16/2016140586809Open ↗
▸Approvals, Objections & Sign-offs72
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST41
01/29/2021104355243Open ↗
11/05/2020104355243Open ↗
08/10/2020104355243Open ↗
Showing 3 of 41 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
12/04/2014122125011Open ↗
07/27/2012120176344Open ↗
Showing 2 of 10 on file for this type
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT47
09/05/2017123110025Open ↗
09/05/2017123110025Open ↗
04/18/2017140586809Open ↗
Showing 3 of 47 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
05/01/2025104355243Open ↗
01/24/2025104355243Open ↗
▸Filing & Intake Forms51
▸BISEFILING COVER SHEET26
09/05/2017123110025Open ↗
09/05/2017123110025Open ↗
02/09/2015122262292Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM14
02/25/2020104355243Open ↗
02/21/2020104355243Open ↗
11/22/2019104355243Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION8
01/20/2017140586809Open ↗
10/02/2015122063006Open ↗
09/06/2012120094520Open ↗
Showing 3 of 8 on file for this type
▸BISeFiling Job Application Cover Sheet3
12/16/2016140586809Open ↗
Showing 1 of 3 on file for this type
▸Other Documents13
▸DOB NOWManufacturer's Specifications4
08/22/2026M01146125-I1Open ↗
08/13/2026M01146125-P1Open ↗
08/13/2026M01146125-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/22/2026M01146125-I1Open ↗
08/13/2026M01146125-P2Open ↗
08/13/2026M01146125-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/18/2017140586809Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/27/2012120176344Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01389454-I1Open ↗