ECB11/10/2026Upon inspection of a active 7 story NB construction site i observed missing and inadequately installed fire extinguishers throughout the site. No extinguishers on 1ST floor, cellar, expos 3 yard and roof. Extin$1K due
ECB11/10/2026Upon inspection of an active 7 story NB i observed fences installed at expos 2 and 4 on the verge of collapsing onto the adjoining properties at expos 2 and 4. Potential for property damage with vehicles parked$5K due
ECB11/10/2026Upon inspection i observed a fence installed at expos 1 with a inadequate fence project info panel installed contrary to code. Primary permit not posted on the info panel contrary to code 3301.9.1.1 project inf$1K due
ECB11/10/2026Upon inspection of an active 7 story NB construction site i observed on going and incomplete work on roof and bulkhead within close proximity above the adjoining property at expos 2 with no roof protection inst$2K due
ECB11/10/2026I observed unsafe and potentially hazardous housekeeping practices throughout the entire site. Compromised egress and accumulated combustible material on multiple floors. Observed tripping hazards cause by mate$2K due
ECB11/10/2026Upon inspection of an active 7 story NB construction site i observed ongoing and incomplete work in close proximity to the adjoining property at expos 2 with no window protection installed contrary to code 3309$2K due
ECB11/10/2026Upon inspection i observed a fence installed at expos 1 not constructed or maintained according to code. Viewing panels were not 12X12 in size. Sliding fence was not 8FT in height as per code. Protruding object$1K due
ECB11/10/2026Upon inspection i observed DOT barriers installed at expos 1 in the street contrary to the site safety plan and DOT stipulations. Barriers did not fully enclose storage and loading zone and were not filled with$1K due
ECB11/10/2026Upon inspection i observed a fence installed at exposure 1. Upon request to see the approved fence drawings and fence log (documents to be kept on site) none was provided at the time of my inspection.$1K due
ECB11/10/2026Upon inspection of an active 7 story NB construction site i observed safety straps installed on every floor. Upon request to see the safety strap log and installation photos for the installed safety straps non$1K due
ECB07/07/2026At the time of my inspection i observed construction fence not maintained/constructed as per code-at exp#2 loose unsecured plywood sheets leaning towards adj property(parked car),at exp#1 observed protruding naHearing held — result not yet published$1K proposed
ECB07/07/2026I observed-sws not extended 5' to adj property at exp#2 while work not complete above walkway/adj property (parapet wall copings at roof/setback)as required by BC3307.6.3,loose shed parapet panel broken by runnHearing held — result not yet published$2K proposed