Two family frame
546 SINCLAIR AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5171368
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
2,310 sfGross Floor Area
2Units
Two family frame · Owner of record: LUCKY 8 REAL PROPERTY LLC · 4,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Floor 213p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
Basement22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MP REALTY HOLDING3207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC1003/10/2023
THINK DESIGN ARCHITECTURE106/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MP REALTY HOLDING CORPGeneral Contractor507/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677403/10/2023
A TECH ENGINEERING NYC, P6738501/05/2023
Building Lifecycle
All (66)Filed (11)Permit Issued (5)Signed Off (3)Inspection (9)Objection (8)Special Inspection (30)
03/10/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-P8
03/08/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/08/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Fireplaces
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Metering
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
03/08/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
02/10/2023
Signed off — Alteration
S00525774-I1
02/10/2023
Signed off — Alteration
S00525785-I1
02/08/2023
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-S1
02/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-P6
01/04/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
12/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2022
Permit issued — Curb Cut
S00525785-I1-CC
11/01/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-P4
10/28/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-P5
08/17/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
07/14/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-P3
07/12/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/24/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/13/2022
Permit issued — Plumbing
S58771674-S1-PL
03/23/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-P1
03/23/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-P2
02/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/16/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/08/2021
Permit issued — Plumbing
S00514943-S1-PL
11/08/2021
Permit issued — General Construction
S00514943-I1-GC-CX
10/28/2021
Permit issued — Construction Fence
S00525774-I1-FN
09/13/2021
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDING DETACHED GARAGE ON LOT.
S00514943-S1
09/10/2021
Objection resolved — Addressed
09/09/2021
Objection raised — Scope
09/02/2021
Objection resolved — Addressed
09/01/2021
Objection raised — Scope
08/24/2021
Objection resolved — Addressed
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMP REALTY HOLDING CORP11/20/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/13/2022
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC11/08/2021
DOB NOWGeneral ConstructionPermit IssuedMP REALTY HOLDING CORP11/08/2021
DOB NOWConstruction FenceSigned-offMP REALTY HOLDING CORP10/28/2021
1 project · most recent 03/10/2023
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
03/10/2023Signed-offK.M.D. MCHNCL 1443 LLCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 01/10/2023
General Wiring
FiledStatusContractorScope
01/10/2023CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 03/10/2023
FiledStatusContractorScope
03/10/2023Permit IssuedMP REALTY HOLDING CORP3 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/24/2022Pass-Final PL - UndergroundPassView ↗
02/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
03/08/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
03/08/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
03/08/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
03/08/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
03/08/2023Mechanical SystemsWILLIAM MONTAGUEspecial
03/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
03/08/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
03/08/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/08/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
03/08/2023FinalWILLIAM MONTAGUEprogress
03/08/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
03/08/2023Footing and FoundationWILLIAM MONTAGUEprogress
03/08/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
03/08/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
03/08/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
03/08/2023FireplacesWILLIAM MONTAGUEenergy_progress
03/08/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
03/08/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
03/08/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
03/08/2023MeteringWILLIAM MONTAGUEenergy_progress
03/08/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
03/08/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
03/08/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
03/08/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
03/08/2023Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
Latest 25 of 69.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026S00525785-I1Request digital key ↗
08/25/2026S00525774-I1Request digital key ↗
08/23/2026S00514943-P8Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026S00514943-P8Open ↗
08/13/2026S00514943-I1Open ↗
08/13/2026S00514943-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00514943-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00514943-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature22
08/26/2026S00514943-P8Open ↗
08/26/2026S00514943-P8Open ↗
08/26/2026S00514943-P8Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026S00525774-I1Open ↗
08/23/2026S00514943-P4Open ↗
08/23/2026S00514943-P8Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/25/2026S00514943-P6Open ↗
09/14/2026S00514943-P2Open ↗
08/30/2026S00514943-P3Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00514943-P4Open ↗
08/13/2026S00514943-P1Open ↗
08/13/2026S00514943-P8Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/23/2026S00514943-P8Open ↗
08/23/2026S00514943-P4Open ↗
08/23/2026S00514943-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00514943-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00514943-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00514943-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00514943-I1Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT9
08/13/2026S00514943-P6Open ↗
08/13/2026S00514943-P1Open ↗
08/13/2026S00514943-P8Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00514943-S1Open ↗
08/13/2026S00514943-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00514943-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00514943-P8Open ↗
08/13/2026S00514943-P1Open ↗
08/13/2026S00514943-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00514943-P8Open ↗
08/13/2026S00514943-P4Open ↗
08/13/2026S00514943-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00514943-I1Open ↗