← Back
One family attached or semi-detached
547 68 STREET
BROOKLYN · BIN 3144804
💬 Discuss this project
1915Year Built
2Stories
A5Building Class
R4-1Zoning
1,480 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,460 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PONDOSA DESIGN INC112/10/2023
LUKE LICALZI, P.E., P.C.201/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMBINED ELECL CONTNG INCElectrical103/22/2026
XH&RC PLUMBING HEATINGGeneral Contractor107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PONDOSA DESIGN INC.5126112/10/2023
JON LIBASCI3068201/08/2021
Building Lifecycle
All (27)Filed (3)Permit Issued (2)Signed Off (2)Violation (3)Inspection (2)Objection (6)Special Inspection (9)
09/19/2025
Signed off — Alteration
INTERIOR RENOVATION AT CELLAR AND 002; EXISTING 3PC BATHROOM TO BE LEGALIZED AS PER BB 2011-010; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY; NO CHANGE IN BULK.
B00447138-I1
09/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/12/2025
Signed off — Alteration
B00449293-I1
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
12/12/2023
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
12/12/2023
Special inspection requirement — Air barrier - visual inspection
jon libasci
12/11/2023
Objection raised — Admin
12/11/2023
Objection resolved — Addressed
12/10/2023
Filed — Alteration
INTERIOR RENOVATION AT CELLAR AND 002; EXISTING 3PC BATHROOM TO BE LEGALIZED AS PER BB 2011-010; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY; NO CHANGE IN BULK.
B00447138-P1
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANG WONG
12/08/2023
Special inspection requirement — Energy Code Compliance Inspections
MANG WONG
12/08/2023
Special inspection requirement — Air barrier - visual inspection
MANG WONG
11/09/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/30/2023
Permit issued — General Construction
B00447138-I1-GC
04/20/2023
Objection resolved — Addressed
04/17/2023
Objection resolved — Addressed
03/27/2023
Objection raised — Admin
04/29/2021
Permit issued — Plumbing
B00449293-I1-PL
01/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2021
Objection raised — Other
01/08/2021
Filed — Alteration
INTERIOR RENOVATION AT CELLAR AND 002; EXISTING 3PC BATHROOM TO BE LEGALIZED AS PER BB 2011-010; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY; NO CHANGE IN BULK.
B00447138-I1
01/08/2021
Filed — Alteration
B00449293-I1
01/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
01/08/2021
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
01/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
jon libasci
10/20/2020
Violation issued (ECB, closed)
Unknown
10/20/2020
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offXH&RC PLUMBING HEATING05/30/2023
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR04/29/2021
2 projects · most recent 03/13/2025
General Wiring
FiledStatusContractorScope
03/13/2025CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
07/27/2023CompleteCOMBINED ELECL CONTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/09/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/12/2023Fire-Resistant Penetrations and Jointsjon libascispecial
12/12/2023Energy Code Compliance Inspectionsjon libasciprogress
12/12/2023Air barrier - visual inspectionjon libascienergy_progress
12/08/2023Fire-Resistant Penetrations and JointsMANG WONGspecial
12/08/2023Energy Code Compliance InspectionsMANG WONGprogress
12/08/2023Air barrier - visual inspectionMANG WONGenergy_progress
01/08/2021Fire-Resistant Penetrations and Jointsjon libascispecial
01/08/2021Energy Code Compliance Inspectionsjon libasciprogress
01/08/2021HVAC-R and service water piping design and insulationjon libascienergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - General Construction2
08/14/2026B00447138-P1Request digital key ↗
08/14/2026B00447138-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/02/2026B00449293-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
09/02/2026B00449293-I1Open ↗
08/13/2026B00447138-P1Open ↗
08/13/2026B00447138-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026B00449293-I1Open ↗
08/28/2026B00449293-I1Open ↗
08/24/2026B00447138-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00449293-I1Open ↗
08/24/2026B00447138-P1Open ↗
08/24/2026B00447138-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026B00449293-I1Open ↗
08/26/2026B00447138-P1Open ↗
08/26/2026B00447138-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026B00449293-I1Open ↗
08/14/2026B00447138-P1Open ↗
08/14/2026B00447138-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/02/2026B00449293-I1Open ↗
08/13/2026B00447138-I1Open ↗
▸Other Documents2
▸DOB NOWWaiver Document2
09/02/2026B00449293-I1Open ↗
08/13/2026B00447138-I1Open ↗