← Back
Over six families without stores
547 HANCOCK STREET
BROOKLYN · BIN 3045777
💬 Discuss this project
1910Year Built
4Stories
C1Building Class
R6BZoning
7,336 sfGross Floor Area
8Units
Rent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · 2,500 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar8p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS807/08/2026
OWNER OF PREMISES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.204/12/2021
SYED ENGINEERING, P.C.206/24/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AURORA P & H CONT INCPlumbing603/22/2026
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
SERGIO GIANNACHIElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851204/12/2021
Building Lifecycle
All (40)Filed (4)Permit Issued (5)Signed Off (2)Violation (17)Inspection (4)Special Inspection (8)
06/09/2025
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
A
02/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2021
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/05/2021
Permit issued — Boiler Equipment
B00423741-I1-BE
04/13/2021
Permit issued — Boiler Equipment
B00423741-I1-BE
04/13/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
04/13/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
04/13/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
04/13/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
04/12/2021
Filed — Alteration
REPLACE BOILER AND OIL BURNER.
B00423741-P1
04/09/2021
Violation issued (HPD, closed)
A
03/26/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
03/26/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
03/26/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
03/26/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
12/07/2020
Permit issued — Boiler Equipment
B00423741-I1-BE
12/04/2020
Filed — Alteration
REPLACE BOILER AND OIL BURNER.
B00423741-I1
10/08/2019
Signed off — Alteration
B00181220-I1
10/08/2019
Signed off — Alteration
B00181223-I1
06/24/2019
Filed — Alteration
B00181223-I1
06/24/2019
Permit issued — Sidewalk Shed
B00181220-I1-SH
06/24/2019
Permit issued — Supported Scaffold
B00181223-I1-SF
06/23/2019
Filed — Alteration
B00181220-I1
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2005
Violation issued (HPD, open)
B
07/09/2005
Violation issued (HPD, open)
B
07/09/2005
Violation issued (HPD, open)
B
07/09/2005
Violation issued (HPD, open)
B
07/09/2005
Violation issued (HPD, open)
B
05/07/1998
Violation issued (ECB, open)
Construction
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedFERRANTINO FUEL CORP11/05/2021
DOB NOWBoiler EquipmentPermit IssuedFERRANTINO FUEL CORP04/13/2021
DOB NOWBoiler EquipmentPermit IssuedFERRANTINO FUEL CORP12/07/2020
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS06/24/2019
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS06/24/2019
2 projects · most recent 09/22/2022
FiledStatusContractorScope
09/22/2022Permit IssuedWCK ELECTRIC CORP.9 meters, 9 new_meters
06/23/2019Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/13/2021Maintenance informationLOUIS ARENAenergy_progress
04/13/2021Heating SystemsLOUIS ARENAspecial
04/13/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
04/13/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
03/26/2021Heating SystemsLOUIS ARENAspecial
03/26/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/26/2021Maintenance informationLOUIS ARENAenergy_progress
03/26/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/01/2026B00423741-I1Request digital key ↗
08/15/2026B00423741-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00181223-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00181220-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B00423741-I1Open ↗
09/23/2026B00423741-I1Open ↗
09/23/2026B00423741-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00423741-P1Open ↗
09/01/2026B00423741-I1Open ↗
08/13/2026B00181223-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B00423741-I1Open ↗
09/01/2026B00423741-P1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026B00423741-P1Open ↗
08/13/2026B00423741-I1Open ↗
▸Other Documents2
▸DOB NOWDHCR Document2
08/13/2026B00423741-I1Open ↗
08/13/2026B00423741-P1Open ↗