← Back
MANHATTAN
646 WEST 47 STREET
MANHATTAN · BIN 1026982
💬 Discuss this project
—Year Built
—Stories
—Building Class
R8Zoning
—Gross Floor Area
—Units
2 Open Violations ▸
2,510 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof3p · 3 filings · 20 docs
Floor 31p · 1 filing · 14 docs
Floor 22p · 2 filings · 20 docs
Floor 17p · 4 filings · 20 docs
Mezzanine1p · 1 filing · 14 docs
Cellar12p · 6 filings · 20 docs
Sub-Cellar6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRD GROUP707/08/2026
SK DEVELOPMENT2707/08/2026
PLATINUM SERVICES NY607/08/2026
CMA807/08/2026
WVA807/08/2026
STREAMLINE CONSULTANTS NY304/09/2026
ROCK GROUP NY1803/22/2026
ALBA SERVICES INC503/22/2026
CM AND ASSOCIATES CONSTRU3303/22/2026
JCT DEVELOPMENT NY503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/08/2018$93.1M—GIRT REALTY, LLC → 646 11TH OWNER LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1603/21/2026
PATUXENT ENGINEERING203/21/2026
J CALLAHAN CONSULTING403/21/2026
AK CONSULTING SERVICES203/21/2026
KAZAM CONSULTANTS1403/21/2026
A1 EXPEDITING SERVICE1003/21/2026
DOMANI CONSULTING103/21/2026
OUTSOURCE CONSULTANTS, INC.803/21/2026
GREEN STUDIO203/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor1803/21/2026
JCT DEVELOPMENT NY INCGeneral Contractor1507/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor1407/08/2026
TRIDENT GENERAL CONTRACTGeneral Contractor1203/21/2026
CM AND ASSOCIATES CONSTGeneral Contractor807/08/2026
SILVERCUP SCFFLDNG I LLCGeneral Contractor607/08/2026
PRD GROUP INCGeneral Contractor507/08/2026
BALATON CONSULTING LLCScaffold407/08/2026
NEW22 CONSTRUCTION CORPGeneral Contractor303/21/2026
DEMAR PLUMBING CORPFire Protection207/08/2026
AGIR ELEC'L LTD. D/B/AElectrical203/22/2026
DEMAR PLUMBING CORPPlumbing207/08/2026
ALBA SERVICES INCGeneral Contractor203/21/2026
DEMAR PLUMBING CORPGeneral Contractor203/21/2026
DEMAR MECHANICAL INCPlumbing107/08/2026
M&G PLUMBING AND HEATINGPlumbing107/08/2026
CENTRIFUGAL ELECTRIC LLCElectrical103/22/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
AMOK INCFire Protection107/08/2026
LINTECH ELECTRIC, INC.Electrical103/22/2026
CITY ELEC'L SIGN ERECTORSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431210/04/2023
REVANS DESIGN PE PC4617507/06/2023
COLLECTIF ENGINEERING, PL7799206/20/2023
DOMINICK R. PILLA1300106/02/2023
PETRACCA DESIGN AND ENGIN668202/14/2023
JOEL PHAGOO ,PE, PLLC2416103/02/2020
Building Lifecycle
All (233)Filed (41)Permit Issued (52)Signed Off (26)Violation (60)Inspection (6)Objection (18)Special Inspection (30)
02/27/2026
Signed off — Alteration
Modification of plumbing system as shown on plans. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00648778-I1
10/28/2025
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR RESTORATION WORK AT 646 11 AVENUE, MANHATTAN, NY 10036.
M01184433-I1
10/12/2025
Violation issued (HPD, open)
B
10/12/2025
Violation issued (HPD, open)
A
02/26/2025
Permit issued — Suspended Scaffold
M01184433-I1-SC
02/21/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR RESTORATION WORK AT 646 11 AVENUE, MANHATTAN, NY 10036.
M01184433-I1
02/21/2025
Objection raised — Other
02/21/2025
Objection resolved — Addressed
11/20/2024
Signed off — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00266437-I1
11/13/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES TO USE, EGRESS AND OCCUPANCY.
M00509773-I1
06/27/2024
Signed off — Alteration
Interior alteration for new Cadillac dealership as shown on plans
M00646535-I1
02/16/2024
Signed off — Alteration
Interior plumbing work in apt #914 on the 9th floor. No change in use, egress or occupancy.
M00879235-I1
02/08/2024
Signed off — Alteration
M00879226-I1
02/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2024
Signed off — Alteration
M00934468-I1
01/05/2024
Permit issued — Mechanical Systems
M00934468-I1-MS
11/10/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. FENCE FILED IN CONJUNCTION WITH NB APPLICATION 121204302.
M00094314-I1
10/04/2023
Filed — Alteration
M00934468-I1
09/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
09/15/2023
Special inspection requirement — Final
JOHN MCMONAGLE
09/15/2023
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/12/2023
Signed off — Alteration
Structural work as shown on plans
M00649354-I1
07/31/2023
Permit issued — Plumbing
M00879235-I1-PL
07/27/2023
Signed off — Alteration
Modification of sprinkler system as shown on plans. No change in means of egress, use group, or occupancy.
M00648790-I1
07/25/2023
Permit issued — General Construction
M00879226-I1-GC
07/24/2023
Signed off — Alteration
Mechanical work as shown on plans. Modify existing ductwork. No change to existing equipment. No change in means of egress, use group, or occupancy.
M00648760-I1
07/06/2023
Filed — Alteration
Modification of plumbing system as shown on plans. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00648778-P3
07/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Filed — Alteration
Modification of plumbing system as shown on plans. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00648778-P2
06/20/2023
Filed — Alteration
Modification of sprinkler system as shown on plans. No change in means of egress, use group, or occupancy.
M00648790-P1
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
06/13/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00061157-I1
06/13/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2023
Filed — Alteration
Interior plumbing work in apt #914 on the 9th floor. No change in use, egress or occupancy.
M00879235-I1
06/02/2023
Filed — Alteration
M00879226-I1
04/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/05/2023
Signed off — Alteration
HEREWITH FILING MECHANICAL WORK IN CONJUNCTION WITH A TEMPORARY SALES OFFICE BUILDOUT. THIS IS IN CONJUNCTION WITH A NEW BUILDING APPLICATION.
M00191174-I1
03/27/2023
Violation issued (ECB, closed)
Unknown
03/22/2023
Signed off — Alteration
M00512154-I1
03/22/2023
Signed off — Alteration
HEREWITH FILING CURB CUT WORK FOR NEW 12-STORY, MULTIFAMILY RESIDENTIAL BUILDING WITH COMMERCIAL AT THE GROUND FLOOR.
M00109134-I1
03/17/2023
Signed off — Alteration
M00050440-I1
03/17/2023
Permit issued — Supported Scaffold
M00050440-I1-SF
03/17/2023
Violation issued (ECB, closed)
Construction
03/16/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/28/2023
Permit issued — Curb Cut
M00109134-I1-CC
02/27/2023
Permit issued — Curb Cut
M00512154-I1-CC
02/17/2023
Permit issued — Mechanical Systems
M00648760-I1-MS
02/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Petracca
02/15/2023
Special inspection requirement — Structural Steel - Welding
JOHN MCMONAGLE
02/15/2023
Special inspection requirement — Post-installed Anchors
Thomas Petracca
02/15/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Thomas Petracca
02/15/2023
Special inspection requirement — Structural Steel - Details
Thomas Petracca
02/15/2023
Special inspection requirement — Final
Thomas Petracca
02/15/2023
Special inspection requirement — Concrete - Cast-In-Place
Thomas Petracca
Latest 60 of 233 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY02/26/2025
DOB NOWMechanical SystemsSigned-offCHRISTOPHER B. MESBAH01/05/2024
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING07/31/2023
DOB NOWGeneral ConstructionSigned-offNEW22 CONSTRUCTION CORP07/25/2023
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP03/17/2023
DOB NOWCurb CutSigned-offCHRISTOPHER B. MESBAH02/28/2023
DOB NOWCurb CutSigned-offCHRISTOPHER B. MESBAH02/27/2023
DOB NOWMechanical SystemsSigned-offDEMAR PLUMBING CORP02/17/2023
DOB NOWStructuralSigned-offJCT DEVELOPMENT NY INC01/25/2023
DOB NOWGeneral ConstructionSigned-offJCT DEVELOPMENT NY INC01/25/2023
DOB NOWStructuralSigned-offJCT DEVELOPMENT NY INC12/06/2022
DOB NOWStructuralSigned-offJCT DEVELOPMENT NY INC12/06/2022
DOB NOWStructuralSigned-offJCT DEVELOPMENT NY INC12/06/2022
DOB NOWGeneral ConstructionSigned-offJCT DEVELOPMENT NY INC12/05/2022
DOB NOWGeneral ConstructionSigned-offJCT DEVELOPMENT NY INC11/29/2022
DOB NOWSprinklersSigned-offAMOK INC11/03/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC08/19/2022
DOB NOWGeneral ConstructionSigned-offJCT DEVELOPMENT NY INC04/26/2022
DOB NOWStructuralSigned-offJCT DEVELOPMENT NY INC03/30/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO03/23/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO03/23/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO03/23/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO03/23/2022
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC07/07/2021
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/10/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/03/2021
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC02/04/2021
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP12/21/2020
DOB NOWSupported ScaffoldSigned-offPRD GROUP INC10/15/2020
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP09/29/2020
DOB NOWPlumbingSigned-offDEMAR PLUMBING CORP07/08/2020
DOB NOWSprinklersSigned-offDEMAR PLUMBING CORP07/07/2020
DOB NOWSupported ScaffoldSigned-offPRD GROUP INC05/20/2020
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/14/2020
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP03/04/2020
DOB NOWSprinklersSigned-offDEMAR PLUMBING CORP03/02/2020
DOB NOWPlumbingSigned-offDEMAR PLUMBING CORP03/02/2020
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP12/09/2019
DOB NOWSupported ScaffoldSigned-offPRD GROUP INC11/19/2019
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP10/07/2019
+ 60 more permits on file
18 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026CompleteOPTIMAL ELECTRIC, INC—
03/23/2026CompleteM.O.S. ELEC'L CONTR'G CORGeneral Wiring
05/11/2024CompleteCENTRIFUGAL ELECTRIC LLCGeneral Wiring
04/22/2024CompleteMAUCERI ELECTRIC CORP.General Wiring
06/14/2023CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
12/21/2022CompleteCITY ELEC'L SIGN ERECTORS—
12/21/2022CompleteCITY ELEC'L SIGN ERECTORS—
12/21/2022CompleteCITY ELEC'L SIGN ERECTORS—
12/21/2022CompleteCITY ELEC'L SIGN ERECTORS—
11/01/2022CompleteJAM ELECTRICAL CORP—
10/26/2021CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
09/12/2019CompleteAGIR ELEC'L LTD. D/B/A—
07/18/2019CompleteAGIR ELEC'L LTD. D/B/A—
06/17/2019Complete5 J'S ELECTL CONTS CORP—
03/14/2019CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/13/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
09/18/2023Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
09/15/2023FinalJOHN MCMONAGLEprogress
09/15/2023Mechanical SystemsJOHN MCMONAGLEspecial
07/06/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
06/16/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
02/15/2023Structural Stability – Alterations of existing buildingsThomas Petraccaspecial
02/15/2023Structural Steel - WeldingJOHN MCMONAGLEspecial
02/15/2023Post-installed AnchorsThomas Petraccaspecial
02/15/2023Structural Steel - High Strength BoltingThomas Petraccaspecial
02/15/2023Structural Steel - DetailsThomas Petraccaspecial
02/15/2023FinalThomas Petraccaprogress
02/15/2023Concrete - Cast-In-PlaceThomas Petraccaspecial
02/13/2023Post-installed AnchorsThomas Petraccaspecial
02/13/2023Concrete - Cast-In-PlaceThomas Petraccaspecial
02/13/2023FinalThomas Petraccaprogress
02/13/2023Structural Steel - High Strength BoltingThomas Petraccaspecial
02/13/2023Structural Steel - DetailsThomas Petraccaspecial
02/13/2023Structural Stability – Alterations of existing buildingsThomas Petraccaspecial
02/13/2023Structural Steel - WeldingJOHN MCMONAGLEspecial
02/07/2023Duct leakage testing, insulation and designPAUL REVANSenergy_progress
02/07/2023Maintenance informationPAUL REVANSenergy_progress
08/16/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
08/09/2022Maintenance informationSTEPHEN WOODCHEKEenergy_progress
08/09/2022Mechanical SystemsSTEPHEN WOODCHEKEspecial
08/09/2022Heating SystemsSTEPHEN WOODCHEKEspecial
Latest 25 of 58.
▾Documents — 1,001 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch27
09/06/2026M00061157-I1Request digital key ↗
09/06/2026M00050440-I1Request digital key ↗
09/06/2026M00094314-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00180659-I1Request digital key ↗
09/03/2026M00160595-P1Request digital key ↗
09/03/2026M00160595-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut2
09/06/2026M00109134-P1Request digital key ↗
08/15/2026M00109134-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00195721-I1Request digital key ↗
08/15/2026M00195721-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026M00191174-I1Request digital key ↗
08/15/2026M00191174-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00194982-I1Request digital key ↗
08/15/2026M00194982-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00266437-I1Request digital key ↗
09/05/2026M00320281-I1Request digital key ↗
▸Applications & Permits150
▸BISPLAN / WORK APPROVAL APPLICATION109
02/18/2025123373642Open ↗
02/04/2025123373642Open ↗
02/03/2025123373642Open ↗
Showing 3 of 109 on file for this type
▸BISWORK PERMIT APPLICATION36
03/09/2022121204302Open ↗
Showing 1 of 36 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
05/22/2023140748038Open ↗
Showing 1 of 3 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING EXHIBIT I: CERTIFICATION3
07/21/2022121253696Open ↗
Showing 1 of 3 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
07/21/2022121253696Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
07/21/2022121253696Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications163
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/06/2026M00061157-I1Open ↗
09/06/2026M00109134-P1Open ↗
09/06/2026M00109134-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/14/2026M00320281-I1Open ↗
09/01/2026M00649354-P1Open ↗
09/01/2026M00649354-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/14/2026M00320281-I1Open ↗
09/01/2026M00649354-P1Open ↗
09/01/2026M00649354-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment97
▸BISEQUIPMENT USE PERMITS58
04/26/2022121204302Open ↗
04/26/2022121204302Open ↗
04/26/2022121204302Open ↗
Showing 3 of 58 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT13
04/26/2022121204302Open ↗
04/26/2022121204302Open ↗
01/19/2022121204302Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/18/2022123240448Open ↗
Showing 1 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
11/30/2022121204302Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
08/12/2022121204302Open ↗
07/12/2022140820459Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
08/12/2022121204302Open ↗
07/12/2022140820459Open ↗
▸Safety & Tenant Protection49
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist30
09/06/2026M00061157-I1Open ↗
09/05/2026M00180659-I1Open ↗
09/04/2026M00195721-I1Open ↗
Showing 3 of 30 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00180659-I1Open ↗
08/13/2026M00109134-P1Open ↗
▸Environmental & Asbestos44
▸DOB NOWOER: Notice to Proceed18
09/06/2026M00061157-I1Open ↗
09/05/2026M00180659-I1Open ↗
09/04/2026M00195721-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/13/2026M00649354-I1Open ↗
08/13/2026M00195721-I1Open ↗
08/13/2026M00194982-I1Open ↗
Showing 3 of 10 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION7
05/03/2023140849973Open ↗
01/25/2023123505830Open ↗
08/10/2022123769608Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY27
12/21/2021121204302Open ↗
Showing 1 of 27 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
08/09/2022140835782Open ↗
08/05/2022121204302Open ↗
06/30/2022140820459Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/05/2022140835782Open ↗
07/12/2022140820459Open ↗
▸BISELECTRIC MOTORS2
08/12/2022121204302Open ↗
07/12/2022140820459Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00191174-I1Open ↗
▸Inspections & Test Reports78
▸BISTECHNICAL REPORT: RESPONSIBILITY59
12/21/2021121204302Open ↗
12/21/2021121204302Open ↗
Showing 2 of 59 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER8
11/09/2023121204302Open ↗
11/09/2023121204302Open ↗
11/09/2023121204302Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISMECHANICAL SYSTEMS2
08/05/2022121204302Open ↗
07/12/2022140820459Open ↗
▸Approvals, Objections & Sign-offs78
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
05/03/2023140849973Open ↗
02/28/2023123240448Open ↗
01/25/2023123505830Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
03/09/2022121204302Open ↗
12/15/2021121204302Open ↗
Showing 2 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISFINAL5
05/03/2023140849973Open ↗
08/05/2022140835782Open ↗
07/12/2022140820459Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/03/2023140849973Open ↗
01/24/2023123505830Open ↗
08/10/2022123769608Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms98
▸BISADDITIONAL INFORMATION62
10/06/2023140748038Open ↗
08/14/2023121204302Open ↗
08/14/2023121204302Open ↗
Showing 3 of 62 on file for this type
▸BISEFILING COVER SHEET23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISBOROUGH INTAKE FORM7
03/09/2022121204302Open ↗
Showing 1 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00160595-P2Open ↗
▸Other Documents35
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
07/21/2022121253696Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation9
09/06/2026M00061157-I1Open ↗
09/05/2026M00180659-I1Open ↗
09/03/2026M00160595-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board9
09/06/2026M00061157-I1Open ↗
09/05/2026M00180659-I1Open ↗
09/03/2026M00160595-P1Open ↗
Showing 3 of 9 on file for this type
▸BISMAINTENANCE INFORMATION3
08/12/2022121204302Open ↗
08/05/2022140835782Open ↗
07/12/2022140820459Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01184433-I1Open ↗