Primarily 3 family with 1 store or office
548 LA GUARDIA PLACE
MANHATTAN · BIN 1008640
💬 Discuss this project
1870Year Built
4Stories
S3Building Class
R7-2Zoning
3,120 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸
Primarily 3 family with 1 store or office · 1,111 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 34p · 2 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 548 W. BROADWAY103/22/2026
548 LAGUARDIA ASSOC403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.802/18/2022
TERRA PRETA ARCHITECTS301/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN CONCEPTS303/21/2026
CITY GAS HEATING SVC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY GAS HTG SVC CO INCPlumbing207/08/2026
YOUNG CHOEElectrical103/21/2026
CITY GAS HTG SVC. CO INCGeneral Contractor107/08/2026
KCM PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808602/18/2022
Building Lifecycle
All (54)Filed (11)Permit Issued (4)Signed Off (4)Violation (10)Inspection (9)Objection (2)Special Inspection (14)
05/07/2026
Violation issued (HPD, open)
A
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
03/29/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
06/03/2022
Signed off — Alteration
INSTALL NEW DIRECT VENT GAS-FIRED BOILER ON 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562866-I1
06/01/2022
Signed off — Alteration
INSTALL NEW EXHAUST VENT AND AIR INTAKE VENT FOR NEW DIRECT VENT BOILER ON 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562999-I1
05/31/2022
Signed off — Alteration
INSTALL NEW GAS PIPING FOR NEW DIRECT VENT GAS-FIRED BOILER ON 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562986-I1
04/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/07/2022
Signed off — Alteration
PAA to address Plumbing Inspection issues.
M00585073-I1
02/18/2022
Filed — Alteration
INSTALL NEW GAS PIPING FOR NEW DIRECT VENT GAS-FIRED BOILER ON 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562986-P2
02/18/2022
Filed — Alteration
INSTALL NEW EXHAUST VENT AND AIR INTAKE VENT FOR NEW DIRECT VENT BOILER ON 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562999-P2
02/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2022
Special inspection requirement — Chimneys and vents
Joseph Bazini
02/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
02/10/2022
Special inspection requirement — Final
Joseph Bazini
02/10/2022
Special inspection requirement — Mechanical Systems
Joseph Bazini
02/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
George Turner
02/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
George Turner
02/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2022
Filed — Alteration
PAA to address Plumbing Inspection issues.
M00585073-P2
01/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
George Turner
01/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
George Turner
01/27/2022
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/26/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2021
Filed — Alteration
PAA to address Plumbing Inspection issues.
M00585073-P1
12/21/2021
Filed — Alteration
INSTALL NEW DIRECT VENT GAS-FIRED BOILER ON 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562866-P1
12/21/2021
Filed — Alteration
INSTALL NEW GAS PIPING FOR NEW DIRECT VENT GAS-FIRED BOILER ON 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562986-P1
12/21/2021
Filed — Alteration
INSTALL NEW EXHAUST VENT AND AIR INTAKE VENT FOR NEW DIRECT VENT BOILER ON 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562999-P1
12/21/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
George Turner
12/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
George Turner
10/18/2021
Special inspection requirement — Final
Joseph Bazini
10/18/2021
Special inspection requirement — Mechanical Systems
Joseph Bazini
10/18/2021
Special inspection requirement — Chimneys and vents
Joseph Bazini
10/15/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/12/2021
Permit issued — Mechanical Systems
M00562999-I1-MS
10/04/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/04/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/17/2021
Permit issued — Plumbing
M00562986-I1-PL
09/17/2021
Permit issued — Boiler Equipment
M00562866-I1-BE
09/16/2021
Permit issued — Plumbing
M00585073-I1-PL
09/13/2021
Filed — Alteration
INSTALL NEW DIRECT VENT GAS-FIRED BOILER ON 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562866-I1
09/13/2021
Filed — Alteration
INSTALL NEW EXHAUST VENT AND AIR INTAKE VENT FOR NEW DIRECT VENT BOILER ON 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562999-I1
09/13/2021
Filed — Alteration
INSTALL NEW GAS PIPING FOR NEW DIRECT VENT GAS-FIRED BOILER ON 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00562986-I1
08/31/2021
Objection raised — Other
08/31/2021
Objection resolved — Addressed
08/29/2021
Filed — Alteration
PAA to address Plumbing Inspection issues.
M00585073-I1
04/16/2021
Violation issued (HPD, closed)
A
10/05/2019
Violation issued (ECB, closed)
Construction
10/16/2015
Violation issued (HPD, closed)
I
06/14/2001
Violation issued (ECB, closed)
Plumbing
09/27/1982
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCITY GAS HTG SVC. CO INC10/12/2021
DOB NOWPlumbingSigned-offCITY GAS HTG SVC CO INC09/17/2021
DOB NOWBoiler EquipmentSigned-offCITY GAS HTG SVC CO INC09/17/2021
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO09/16/2021
BISPLISSUEDKCM PLUMBING & HEATING CO02/04/2021
BISPLISSUEDKCM PLUMBING & HEATING CO01/22/2021
BISPLISSUEDKCM PLUMBING & HEATING CO12/03/2019
BISFPISSUEDRELIABLE FIRE PROT. INC02/06/2012
BISFPISSUEDACTIVE FIRE CONTROL INC03/20/1998
BISEQISSUEDJOHN TARA INC07/01/1997
BISMHISSUEDJOHN TARA INC07/01/1997
BISPLISSUEDCOMPOWER CONSTRUCTION CO04/29/1992
BISOTISSUEDAM PM CONSTRUCTION03/02/1992
BISOTISSUEDARTIMUS CONST. INC.12/03/1990
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/26/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/04/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/04/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/10/2022Chimneys and ventsJoseph Bazinispecial
02/10/2022Fire-Resistant Penetrations and JointsJoseph Bazinispecial
02/10/2022FinalJoseph Baziniprogress
02/10/2022Mechanical SystemsJoseph Bazinispecial
02/04/2022HVAC-R and service water heating system controlsGeorge Turnerenergy_progress
02/04/2022HVAC-R and service water heating equipmentGeorge Turnerenergy_progress
01/30/2022HVAC-R and service water heating system controlsGeorge Turnerenergy_progress
01/30/2022HVAC-R and service water heating equipmentGeorge Turnerenergy_progress
12/21/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/09/2021HVAC-R and service water heating system controlsGeorge Turnerenergy_progress
12/09/2021HVAC-R and service water heating equipmentGeorge Turnerenergy_progress
10/18/2021FinalJoseph Baziniprogress
10/18/2021Mechanical SystemsJoseph Bazinispecial
10/18/2021Chimneys and ventsJoseph Bazinispecial
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00585073-P2Request digital key ↗
09/03/2026M00585073-P1Request digital key ↗
09/03/2026M00562866-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits15
▸DOB NOWLPC Approval/Permit9
09/03/2026M00585073-P2Open ↗
09/03/2026M00585073-P1Open ↗
08/15/2026M00585073-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/25/2023101721308Open ↗
01/19/2021100365123Open ↗
10/29/2020101542662Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
02/05/2021100365123Open ↗
12/03/2019120948154Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00585073-P1Open ↗
09/03/2026M00585073-P2Open ↗
09/03/2026M00585073-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M00562866-I1Open ↗
08/29/2026M00562999-P2Open ↗
08/28/2026M00562999-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00562986-P2Open ↗
08/29/2026M00562999-P2Open ↗
08/29/2026M00562999-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/11/2018120948154Open ↗
01/26/2012120948154Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/26/2012120948154Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/07/2012120948154Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00562866-I1Open ↗
09/03/2026M00562866-P1Open ↗
09/02/2026M00562999-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
01/26/2012120948154Open ↗
01/26/2012120948154Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00562866-I1Open ↗
08/15/2026M00585073-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/21/2021100365123Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/04/2022120948154Open ↗
10/01/2021100365123Open ↗
01/26/2021101542662Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/26/2012120948154Open ↗
▸BISSUPERSEDING LETTER1
02/05/2021100365123Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
10/01/2021100365123Open ↗
05/11/2018120948154Open ↗
01/26/2012120948154Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/03/2022120948154Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
05/11/2018120948154Open ↗
▸BISADDITIONAL INFORMATION1
01/21/2021100365123Open ↗
▸BISEFILING COVER SHEET1
01/26/2012120948154Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
05/11/2018120948154Open ↗