← Back
BuildNYC
Two family frame
549 ROCKAWAY STREET
STATEN ISLAND · BIN 5174830
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,468 sfGross Floor Area
2Units
Two family frame · 3,750 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential Development3p · 1 filing · 20 docs
Floor 2Residential Development8p · 2 filings · 20 docs
Floor 1Residential Development10p · 3 filings · 20 docs
CellarResidential Development7p · 2 filings · 20 docs
BasementResidential Development7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Think Design Architecture902/06/2023
A Tech Engineering NYC112/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.T.C. ContractingGeneral Contractor307/08/2026
Flow-Right Plumbing & HeatingPlumbing207/08/2026
Sure Electrical ContractingElectrical103/22/2026
ATC Contractingspecialty_contractor107/08/2026
Sunrun Installation ServiceGeneral Contractor106/26/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738702/06/2023
Building Lifecycle
02/10/2023
Signed off — New Building
APPLICATION IS FILED FOR THE CONSTRUCTION OF A2-FAMILY, 2-STORY DETACHED RESIDENCE ON OWN ZONING/TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00500289-I1
02/08/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
02/08/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
02/08/2023
Special inspection requirement — Masonry
anthony santoro
02/08/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
65 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offA.T.C. Contracting12/14/2022
DOB NOWCurb CutSigned-offA.T.C. Contracting10/07/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating05/09/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating03/17/2022
DOB NOWEarth WorkPermit IssuedA.T.C. Contracting03/04/2022
BISOTISSUEDSunrun Installation Service06/26/2023
1 project · most recent 02/06/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/06/2023Signed-offFlow-Right Plumbing & HeatingGas, Storm, Water/Sanitary
3 projects · most recent 06/26/2023
General Wiring
FiledStatusContractorScope
06/26/2023CompleteSunrun Solar Electl—
01/17/2023CancelledSure Electrical ContractingGeneral Wiring
05/06/2022CompleteSure Electrical ContractingGeneral Wiring
1 project · most recent 02/06/2023
Wood
FiledStatusContractorScope
02/06/2023Signed-offA.T.C. ContractingWood
1 project · most recent 02/06/2023
Earthwork
FiledStatusContractorScope
02/06/2023Signed-offA.T.C. ContractingEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/29/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2022Pass-Final PL - UndergroundPassView ↗
04/06/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 104
DateRequirementInspectorRole
02/08/2023Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
02/08/2023Concrete - Cast-In-Placeanthony santorospecial
02/08/2023Wood – Prefabricated I-Joistsanthony santorospecial
02/08/2023Masonryanthony santorospecial
02/08/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/08/2023Subgrade Inspectionsanthony santorospecial
02/08/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
02/08/2023Subsurface Conditions – Fill Placement & In-Place Densityanthony santorospecial
02/08/2023Fire-Resistance Rated Constructionanthony santoroprogress
02/08/2023Finalanthony santoroprogress
02/08/2023Preliminaryanthony santoroprogress
02/08/2023Structural Wood Frameanthony santoroprogress
02/08/2023Energy Code Compliance Inspectionsanthony santoroprogress
02/08/2023Footing and Foundationanthony santoroprogress
02/08/2023Protection of exposed foundation insulationanthony santoroenergy_progress
02/08/2023Interior lighting poweranthony santoroenergy_progress
02/08/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/08/2023Meteringanthony santoroenergy_progress
02/08/2023Maintenance informationanthony santoroenergy_progress
02/08/2023Insulation placement and R valuesanthony santoroenergy_progress
02/08/2023Fenestration areasanthony santoroenergy_progress
02/08/2023Fenestration air leakageanthony santoroenergy_progress
02/08/2023Fireplacesanthony santoroenergy_progress
02/08/2023Air barrier — testing anthony santoroenergy_progress
02/08/2023Air barrier - visual inspectionanthony santoroenergy_progress
Latest 25 of 104.
95 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account