1910Year Built
6Stories
D1Building Class
R8Zoning
42,265 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized23 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · 10,092 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Roof14p · 2 filings · 17 docs
Site & exterior35p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLUMBIA UNIVERSITY1407/08/2026
ROCKLEDGE SCAFFOLD CORP503/22/2026
LEMX407/08/2026
Trustees of Columbia University403/21/2026
CAPITAL PROJECT MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC105/15/2024
NORFAST ENGINEERING PLLC104/22/2024
HOFFMANN ARCHITECTS, INC.210/09/2023
ASHRAF CORP306/20/2023
JOEL PHAGOO P.E. PLLC104/30/2019
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEMS INSTAL S&SGeneral Contractor603/21/2026
M&A PROJECTS RESTORATION*General Contractor603/21/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor203/21/2026
CERCONE EXTERIOR REST CORGeneral Contractor107/08/2026
SORTINO JOSEPHElectrical103/21/2026
LEMX CORPGeneral Contractor107/08/2026
RICHARD NEUElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658105/30/2024
NORFAST ENGINEERING PLLC6655104/22/2024
COLE TECHNOLOGIES/CONTROL1290210/09/2023
SITE SAFETY LLC8555107/18/2023
Building Lifecycle
All (114)Filed (9)Permit Issued (8)Signed Off (7)Facade (FISP) (18)Violation (60)Special Inspection (12)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
07/11/2025
Cycle 10 facade report submitted
07/10/2025
Cycle 10 facade report signed — SAFE
07/01/2025
Cycle 10 facade inspection completed
06/04/2025
Violation issued (HPD, open)
A
06/02/2025
Cycle 9 facade report signed — SAFE
05/02/2025
Cycle 9 facade report submitted
05/01/2025
Cycle 9 facade inspection completed
12/05/2024
Signed off — Alteration
M01050746-I1
09/30/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00891821-I1
09/30/2024
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00891818-I1
09/04/2024
Signed off — Alteration
M01010271-I1
08/22/2024
Signed off — Alteration
M01052026-I1
06/12/2024
Permit issued — General Construction
M01010271-I1-GC
06/06/2024
Permit issued — Suspended Scaffold
M01052026-I1-SC
05/30/2024
Filed — Alteration
M01052026-I1
05/15/2024
Filed — Alteration
M01050746-I1
05/15/2024
Permit issued — Sidewalk Shed
M01050746-I1-SH
05/15/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
05/15/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
04/22/2024
Filed — Alteration
M01010271-I1
04/01/2024
Violation issued (HPD, open)
A
03/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Michelle Noris
03/20/2024
Special inspection requirement — Masonry
Michelle Noris
02/23/2024
Special inspection requirement — Final
Michelle Noris
12/15/2023
Signed off — Alteration
Removal of existing roof assembly and installation of new with masonry repairs where required as shown on drawings filed herewith.
M00873903-I1
11/15/2023
Violation issued (HPD, closed)
I
10/13/2023
Permit issued — General Construction
M00873903-I1-GC
10/11/2023
Special inspection requirement — Insulation placement and R values
Juan Kuriyama
10/11/2023
Special inspection requirement — Air barrier - visual inspection
Juan Kuriyama
10/11/2023
Special inspection requirement — Post-installed Anchors
GEORGE ANDERSEN
10/11/2023
Special inspection requirement — Masonry
GEORGE ANDERSEN
10/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
KHALID ALGENDE
10/11/2023
Special inspection requirement — Final
Juan Kuriyama
10/09/2023
Filed — Alteration
Removal of existing roof assembly and installation of new with masonry repairs where required as shown on drawings filed herewith.
M00873903-P1
07/18/2023
Filed — Alteration
Removal of existing roof assembly and installation of new with masonry repairs where required as shown on drawings filed herewith.
M00873903-I1
06/21/2023
Permit issued — Protection and Mechanical Methods
M00891828-I1-PMM
06/20/2023
Filed — Alteration
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00891828-I1
06/19/2023
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00891821-I1
06/19/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00891818-I1
06/19/2023
Permit issued — Sidewalk Shed
M00891818-I1-SH
06/19/2023
Permit issued — Supported Scaffold
M00891821-I1-SF
11/16/2022
Violation issued (FDNY_NOV, closed)
11/02/2022
Violation issued (HPD, closed)
I
05/16/2022
Cycle 9 facade report signed — SWARMP
05/05/2022
Cycle 9 facade inspection completed
02/16/2022
Violation issued (HPD, closed)
A
02/07/2022
Cycle 9 facade report submitted
04/02/2021
Violation issued (HPD, closed)
A
12/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/22/2019
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00159769-I1
07/12/2019
Violation issued (FDNY_NOV, closed)
04/30/2019
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00159769-I1
04/30/2019
Permit issued — Sidewalk Shed
M00159769-I1-SH
04/26/2019
Special inspection requirement — Final
JOEL PHAGOO
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2016
Cycle 8 facade report submitted
09/29/2016
Cycle 8 facade report signed — SWARMP
09/13/2016
Cycle 8 facade inspection completed
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCERCONE EXTERIOR REST COR06/12/2024
DOB NOWSuspended ScaffoldSigned-offCERCONE EXTERIOR REST COR06/06/2024
DOB NOWSidewalk ShedSigned-offLEMX CORP05/15/2024
DOB NOWGeneral ConstructionSigned-offM&A PROJECTS RESTORATION*10/13/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedM&A PROJECTS RESTORATION*06/21/2023
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S06/19/2023
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S06/19/2023
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP04/30/2019
BISOTISSUEDIDEAL ROOFING & SHEET ME05/03/2019
BISOTISSUEDIDEAL ROOFING & SHEET ME04/26/2019
BISPLISSUEDALAFOGIANNIS PLBG & HTG09/23/2015
BISPLISSUEDALAFOGIANNIS PLBG & HTG12/16/2013
BISFBISSUEDALAFOGIANNIS PLBG & HTG12/16/2013
BISOTISSUEDCOLUMBIA UNIVERSITY02/27/2012
BISOTISSUEDKAY WATERPROOFING CORP06/17/2011
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/28/2011
BISBLISSUEDC C CONTROLLED COMBUSTION02/24/1998
BISOTISSUEDALL COUNTRY RESTORATION04/26/1995
BISEQISSUEDYORK SCAFFOLDING ,INC.02/23/1993
4 projects · most recent 05/15/2024
FiledStatusContractorScope
05/15/2024CompleteRICHARD NEU—
06/16/2023Permit IssuedAUR0RA ELECL CONTG INC—
12/09/2022CompleteROBERT CHIMENTI46 meters, 1 new_meters
04/24/2019CompleteANTHONY G FERRY INC—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/15/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/15/2024Post-installed AnchorsGeorge Xerakiasspecial
03/20/2024Tenant Protection Plan ComplianceMichelle Norisspecial
03/20/2024MasonryMichelle Norisspecial
02/23/2024FinalMichelle Norisprogress
10/11/2023Insulation placement and R valuesJuan Kuriyamaenergy_progress
10/11/2023Air barrier - visual inspectionJuan Kuriyamaenergy_progress
10/11/2023Post-installed AnchorsGEORGE ANDERSENspecial
10/11/2023MasonryGEORGE ANDERSENspecial
10/11/2023Tenant Protection Plan ComplianceKHALID ALGENDEspecial
10/11/2023FinalJuan Kuriyamaprogress
04/26/2019FinalJOEL PHAGOOprogress
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/30/2026M00891821-I1Request digital key ↗
08/30/2026M00891818-I1Request digital key ↗
08/30/2026M00891828-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00159769-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION7
04/29/2019123835751Open ↗
12/23/2013121805662Open ↗
12/23/2013121805662Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
04/16/2019123835751Open ↗
10/11/2013121805662Open ↗
02/02/2012120963145Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
10/31/2019123835751Open ↗
10/31/2019123835751Open ↗
10/31/2019123835751Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/30/2026M00891821-I1Open ↗
08/30/2026M00891818-I1Open ↗
08/30/2026M00891828-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/26/2026M01010271-I1Open ↗
08/26/2026M01010271-I1Open ↗
08/26/2026M00873903-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026M00159769-I1Open ↗
08/26/2026M01010271-I1Open ↗
08/26/2026M00873903-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/16/2019123835751Open ↗
10/11/2013121805662Open ↗
05/16/2011120690305Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/16/2019123835751Open ↗
10/11/2013121805662Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/16/2011120690305Open ↗
05/02/2011120673958Open ↗
▸Trade Schedules & Equipment5
▸BISBOILERS - SUPPORTING DOCUMENTATION2
11/10/2015121805662Open ↗
06/09/2014121805662Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/10/2015121805662Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/11/2013121805662Open ↗
▸BISSCHEDULE B - PLUMBING1
10/11/2013121805662Open ↗
▸Safety & Tenant Protection2
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/18/2019123835751Open ↗
▸BISTenant Protection Plan and Notes1
04/16/2019123835751Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/16/2019123835751Open ↗
10/11/2013121805662Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/02/2011120673958Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/16/2011120690305Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00873903-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01010271-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/16/2019123835751Open ↗
10/11/2013121805662Open ↗
10/11/2013121805662Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/31/2019123835751Open ↗
09/20/2013120963145Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/02/2012120963145Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/27/2026M01050746-I1Open ↗
08/13/2026M00873903-I1Open ↗
08/13/2026M01010271-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/31/2019123835751Open ↗
09/20/2013120963145Open ↗
06/11/2013120690305Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
02/02/2012120963145Open ↗
05/16/2011120690305Open ↗
05/02/2011120673958Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
06/11/2013120690305Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
04/16/2019123835751Open ↗
10/11/2013121805662Open ↗
09/20/2013120963145Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
04/16/2019123835751Open ↗
10/11/2013121805662Open ↗
05/16/2011120690305Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
10/31/2019123835751Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/16/2019123835751Open ↗
01/03/2013120673958Open ↗
▸DOB NOWCalculations1
08/13/2026M01052026-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01052026-I1Open ↗