← Back
BuildNYC
Elevator cooperative
55-05 WOODSIDE AVENUE
QUEENS · Woodside · BIN 4028174
💬 Discuss this project
1956Year Built
6Stories
D4Building Class
R5BZoning
145,379 sfGross Floor Area
147Units
LL97 CoveredRent Stabilized8 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 55 Woodside · 33,483 sf lot · 4.34 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDecommission NYCWIN Telecom Site1 filing · 5 docs
CellarGas to gas replacement10p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation9p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
55 Woodside1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Merritt Engineering Consultants108/21/2024
Ashraf107/09/2024
Ronald Krigsman P.E.P.C209/16/2022
Bazini Engineering610/19/2021
The MTM Design Group102/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Danico Services403/21/2026
Construction Permit Services103/21/2026
Sandeep Kaur103/21/2026
Merritt Engineering Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Millennium Tank Maintenance*General Contractor303/21/2026
Lakhi General ContractorGeneral Contractor203/21/2026
L.e.c.incGeneral Contractor203/21/2026
DNR ElectricElectrical203/21/2026
Lakhi General ContractorScaffold104/09/2026
Joseph Ferrigno P&H CoPlumbing107/08/2026
K.N.C. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AP Professional Engineering5974109/16/2024
HRF Services5616108/21/2024
Merritt Engineering Consulting460108/21/2024
Bazini Engineering1808310/19/2021
The MTM Design Group1319102/05/2021
Building Lifecycle
10/08/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/01/2026
Elevator Category 5 inspection report filed
09/16/2026
Elevator Category 1 inspection report filed
09/16/2026
Elevator Category 5 inspection report filed
03/17/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR EXTERIOR BUILDING REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
Q01076362-I1
201 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offLakhi General Contracting07/29/2025
DOB NOWSidewalk ShedSigned-offLakhi General Contractor01/08/2025
DOB NOWGeneral ConstructionSigned-offLakhi General Contractor01/08/2025
DOB NOWSuspended ScaffoldPermit IssuedLakhi General Contracting09/20/2024
DOB NOWSuspended ScaffoldSigned-offLakhi General Contracting07/29/2024
DOB NOWPlumbingSigned-offJoseph Ferrigno P&H Co10/06/2022
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn09/28/2022
DOB NOWGeneral ConstructionPermit IssuedMillennium Tank Maintenance*07/30/2021
DOB NOWBoiler EquipmentSigned-offNew York Heating07/22/2021
DOB NOWGeneral ConstructionSigned-offL.e.c.inc04/27/2021
BISOTISSUEDCommunication Component S09/16/2016
BISOTISSUEDSquan Construction Services10/06/2015
BISEQISSUEDSpring Scaffolding06/11/2014
BISOTISSUEDDelwar Hussain06/11/2014
BISOTISSUEDDavrial Enterprises11/16/2007
BISOTISSUEDTelcom Engineering GP02/16/2007
2 projects · most recent 07/24/2024
FiledStatusContractorScope
07/24/2024Permit IssuedK.N.C. Electric—
09/28/2022CompleteLaura Electrical Lighting—
1 project · most recent 07/09/2024
Sidewalk Shed
FiledStatusContractorScope
07/09/2024Signed-offLakhi General ContractorSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/06/2024Fenestration air leakageChristopher Krepcioenergy_progress
08/06/2024MasonryChristopher Krepciospecial
08/06/2024Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
08/06/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
08/06/2024Air barrier - visual inspectionChristopher Krepcioenergy_progress
08/06/2024FinalChristopher Krepcioprogress
08/06/2024Energy Code Compliance InspectionsChristopher Krepcioprogress
09/06/2022Maintenance informationHOWARD KRIGSMANenergy_progress
09/06/2022HVAC-R and service water heating equipmentHOWARD KRIGSMANenergy_progress
10/21/2021Fire-Resistance Rated ConstructionJoseph Baziniprogress
10/21/2021FinalJoseph Baziniprogress
10/20/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
10/20/2021Fire-Resistant Penetrations and JointsJoseph Bazinispecial
10/18/2021FinalJoseph Baziniprogress
10/18/2021Fire-Resistant Penetrations and JointsJoseph Bazinispecial
10/18/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
10/18/2021Fire-Resistance Rated ConstructionJoseph Baziniprogress
07/21/2021Fire-Resistance Rated ConstructionJoseph Baziniprogress
07/21/2021FinalJoseph Baziniprogress
01/26/2021MasonryRobert Tomsspecial
01/26/2021FinalRobert Tomsprogress
125 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account