← Back
BuildNYC
Two stories - detached, small or mid-size
55-08 HASPEL STREET
QUEENS · Elmhurst · BIN 4065719
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4Zoning
1,618 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: 55-08 Haspel Street · 3,082 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 27p · 2 filings · 16 docs
Floor 16p · 2 filings · 16 docs
Cellar11p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2025$895K—55-08 HASPEL STREET, LLC → Private party$553/sf building
05/22/2025$850K—Private party → 55-08 HASPEL STREET, LLC$525/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Engineering Inspection (Pei) Consultants412/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor107/08/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Paul Engineering Inspecti4672212/08/2025
Building Lifecycle
05/28/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILER AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01313757-I1
05/28/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q01313755-I1
02/26/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/04/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building11/13/2025
DOB NOWGeneral ConstructionSigned-offKale Construction11/13/2025
1 project · most recent 12/08/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/08/2025Signed-offWatson's Plumbing, Heating, & BuildingGas, Storm, Water/Sanitary
1 project · most recent 12/08/2025
FiledStatusContractorScope
12/08/2025Signed-offKale Construction—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/26/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/04/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/08/2025Fire-Resistant Penetrations and JointsHugues Paulspecial
12/08/2025Energy Code Compliance InspectionsHugues Paulprogress
12/08/2025Fire-Resistance Rated ConstructionHugues Paulprogress
12/05/2025Fire-Resistant Penetrations and JointsHugues Paulspecial
12/05/2025Energy Code Compliance InspectionsHugues Paulprogress
12/05/2025Fire-Resistance Rated ConstructionHugues Paulprogress
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account