← Back
Elevator cooperative
55-25 98 PLACE
QUEENS · BIN 4431638
💬 Discuss this project
1965Year Built
6Stories
D4Building Class
R7BZoning
225,240 sfGross Floor Area
208Units
LL97 CoveredRent Stabilized87 Open Violations 86 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · 84,760 sf lot · 2.66 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 4 docs
Cellar6p · 2 filings · 4 docs
1 job · most recent 11/07/2022
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
11/07/2022Permit IssuedLXS AIR INCAssociated Ducts and Piping
Ducts & Piping
Juniper Elbow P0630 - 6” 1,200 CFM · Ductwork ×3
3 jobs · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedDENALI ELECTRIC CORPGeneral Wiring
06/03/2026Permit IssuedDENALI ELECTRIC CORP—
04/21/2022CompleteRICHARD NEU—
Building Lifecycle
All (87)Filed (4)Permit Issued (5)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (4)
07/19/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
C
04/27/2026
Violation issued (HPD, closed)
C
04/13/2026
Violation issued (ECB, open)
Elevators
04/12/2026
Violation issued (HPD, open)
A
04/12/2026
Violation issued (HPD, closed)
C
03/26/2026
Violation issued (HPD, closed)
C
02/22/2026
Violation issued (HPD, open)
A
02/12/2026
Violation issued (ECB, closed)
Elevators
02/12/2026
Violation issued (ECB, closed)
Elevators
02/10/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
A
02/10/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, closed)
A
01/29/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, closed)
C
01/17/2026
Violation issued (HPD, open)
B
01/17/2026
Violation issued (HPD, closed)
C
01/12/2026
Violation issued (HPD, open)
B
01/12/2026
Violation issued (HPD, open)
A
01/12/2026
Violation issued (HPD, open)
B
01/12/2026
Violation issued (HPD, open)
B
12/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/23/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
12/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2025
Violation issued (ECB, closed)
Elevators
04/07/2025
Permit issued — Mechanical Systems
Q08034930-I1-MS
04/04/2025
Permit issued — Plumbing
Q08034719-I1-PL
04/04/2025
Permit issued — Plumbing
Q08034719-I1-EW-SP
03/27/2025
Violation issued (HPD, closed)
C
03/27/2025
Violation issued (HPD, closed)
C
03/22/2025
Violation issued (HPD, closed)
C
03/21/2025
Violation issued (HPD, closed)
C
03/21/2025
Violation issued (HPD, closed)
C
03/21/2025
Violation issued (HPD, closed)
C
03/21/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, closed)
C
02/22/2025
Violation issued (HPD, closed)
C
02/18/2025
Violation issued (HPD, open)
C
02/18/2025
Violation issued (HPD, closed)
C
02/18/2025
Violation issued (HPD, closed)
C
02/15/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
A
02/12/2025
Violation issued (HPD, open)
C
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
C
01/03/2025
Violation issued (HPD, closed)
B
01/03/2025
Violation issued (HPD, closed)
C
01/03/2025
Violation issued (HPD, closed)
B
01/03/2025
Violation issued (HPD, closed)
B
Latest 60 of 87 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTRAL QUEENS PROPERTIES1607/08/2026
ZKW ENTERPRISES INC.503/22/2026
SHERWOOD VILLAGE OWNERS1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROMAN S. MARDAREWICH ARCHITECT211/07/2022
MOHAMMAD AHEAD, PE104/21/2022
STRUCTURAL ENGINEERING BURO111/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
SKY MANAGEMENT GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZKW ENTERPRISES INCGeneral Contractor303/21/2026
RAPID MASONRY RESTORATION CORPGeneral Contractor307/08/2026
QUEREM IRON WORKS INCElectrical103/21/2026
ADVANCED PLBG, MECH & SPRFire Protection106/28/2026
LXS AIR INCGeneral Contractor104/09/2026
JOSEPH ADAMOElectrical103/21/2026
ADVANCED PLUMBING MECHPlumbing106/28/2026
PETILLI, EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704211/07/2022
STRUCTURAL ENGINEERING BU5883111/06/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedLXS AIR INC04/07/2025
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH04/04/2025
DOB NOWPlumbingPermit IssuedADVANCED PLBG, MECH & SPR04/04/2025
DOB NOWGeneral ConstructionSigned-offPIOTR POTOCKI05/04/2022
DOB NOWSidewalk ShedSigned-offZKW ENTERPRISES INC04/22/2022
BISFSISSUEDACE ATLAS CORP01/19/2017
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM09/20/2016
BISOTISSUEDTELCOM ENGINEERING GP INC02/03/2015
BISOTISSUEDGJF CONSTRUCTION CORP.04/12/2001
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/23/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
12/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00568118-I1Request digital key ↗
08/26/2026Q00722106-I1Request digital key ↗
08/25/2026Q08034930-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
01/13/2017440377370Open ↗
09/19/2016440345119Open ↗
04/16/2015421146307Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
01/13/2017440377370Open ↗
09/19/2016440345119Open ↗
02/17/2015421060997Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/17/2017421060997Open ↗
04/10/2017440377370Open ↗
04/16/2015421146307Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00568118-I1Open ↗
08/26/2026Q00722106-I1Open ↗
08/25/2026Q08034719-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/13/2017440377370Open ↗
09/19/2016440345119Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/13/2017440377370Open ↗
09/19/2016440345119Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/13/2017440377370Open ↗
09/19/2016440345119Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA2
02/12/2015421060997Open ↗
02/12/2015421060997Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/13/2017440377370Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/16/2015421146307Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
01/13/2017440377370Open ↗
▸BISSTREET TREE CHECKLIST1
04/16/2015421146307Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/16/2015421146307Open ↗
12/17/2014421060997Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00568118-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/16/2015421146307Open ↗
02/17/2015421060997Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/17/2017421060997Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/19/2016440345119Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00568118-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/13/2017440377370Open ↗
09/19/2016440345119Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/10/2017440377370Open ↗
04/10/2017440377370Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/17/2017421060997Open ↗
04/10/2017440377370Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/16/2015421146307Open ↗
12/17/2014421060997Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
04/10/2017440377370Open ↗
01/13/2017440377370Open ↗
04/16/2015421146307Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
01/13/2017440377370Open ↗
09/19/2016440345119Open ↗
▸BISEFILING COVER SHEET2
04/16/2015421146307Open ↗
12/17/2014421060997Open ↗