← Back
Banking facility, with or without parking
55-31 69 STREET
QUEENS · Maspeth · BIN 4058515
💬 Discuss this project
2024Year Built
1Stories
K7Building Class
R4-1Zoning
4,187 sfGross Floor Area
1Units
0 Open Violations
Banking facility, with or without parking · Owner of record: MASPETH FEDERAL SAVINGS AND LOAN ASSOCIA TION · 4,363 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof18p · 2 filings · 20 docs
Floor 141p · 1 filing · 20 docs
Cellar36p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MASPETH FEDERAL SAVINGS5207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/03/2019$1.6M—Private party → MASPETH FEDERAL SAVINGS AND LOAN ASSOCIATION— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE203/21/2026
OCULUS CONSULTING GROUP1903/21/2026
EXPEDITE DEM603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H.M. HUGHES CO. INCGeneral Contractor2907/08/2026
CARA PLUMBING GROUP INCPlumbing307/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor203/21/2026
UNITED INDUSTRIES & CONSTGeneral Contractor207/08/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
ACCORD POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561104/23/2025
JAJ ENGINEERING PLLC9301404/02/2025
H & O ENGINEERING, DPC5595111/06/2023
Building Lifecycle
All (137)Filed (24)Permit Issued (26)Signed Off (10)Violation (3)Inspection (8)Objection (36)Special Inspection (30)
05/29/2026
Signed off — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-S3
02/11/2026
Permit issued — Mechanical Systems
Q00927143-S3-MS
09/09/2025
Signed off — Alteration
Installation of 24.705 kw solar energy system on roof. No change of occupancy, use or egress
Q01204851-I1
07/29/2025
Filed — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-A2
05/05/2025
Permit issued — Plumbing
Q00927143-S1-PL
04/25/2025
Signed off — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-S2
04/25/2025
Permit issued — Solar
Q01204851-I1-SL
04/23/2025
Filed — Alteration
Installation of 24.705 kw solar energy system on roof. No change of occupancy, use or egress
Q01204851-I1
04/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/02/2025
Filed — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-P8
04/02/2025
Special inspection requirement — Mechanical Systems
Joseph Jabour
04/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
04/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
04/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
04/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
04/02/2025
Special inspection requirement — Maintenance information
Joseph Jabour
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
04/02/2025
Special inspection requirement — Final
John Scheschareg
04/02/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
04/02/2025
Special inspection requirement — Shutoff dampers
Joseph Jabour
04/02/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
03/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/10/2025
Signed off — Alteration
Q01100926-I1
03/07/2025
Signed off — Alteration
Installation of Temporary Construction Fence as per the drawings
Q00919002-I1
03/04/2025
Signed off — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-S7
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/25/2025
Permit issued — Mechanical Systems
Q00927143-S3-MS
02/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2025
Signed off — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-S5
02/18/2025
Special inspection requirement — Sprinkler Systems
Joseph Jabour
02/14/2025
Filed — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-A1
02/14/2025
Filed — New Building
PROPOSED PLUMBING WORK ASSOCIATED WITH NEW 1-STORY COMMERCIAL BUILDING. REFER TO PLUMBING DRAWINGS. (REFER TO COMMENTS SECTION).
Q00927143-P9
02/13/2025
Special inspection requirement — Sprinkler Systems
Joseph Jabour
02/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2025
Special inspection requirement — Final
John Scheschareg
01/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
01/09/2025
Special inspection requirement — Mechanical Systems
Joseph Jabour
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
01/09/2025
Special inspection requirement — Maintenance information
Joseph Jabour
01/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
01/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
01/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
01/09/2025
Special inspection requirement — Shutoff dampers
Joseph Jabour
12/20/2024
Permit issued — General Construction
Q00927143-I1-GC
12/17/2024
Permit issued — General Construction
Q00927143-S5-EA
12/17/2024
Permit issued — General Construction
Q00927143-S5-GC
12/16/2024
Permit issued — Foundation
Q00927143-S5-FO
12/03/2024
Permit issued — Construction Fence
Q00919002-I1-FN
11/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2024
Special inspection requirement — Fenestration areas
Joseph Jabour
11/15/2024
Special inspection requirement — Vestibules
Joseph Jabour
11/15/2024
Special inspection requirement — Fenestration air leakage
Joseph Jabour
11/15/2024
Special inspection requirement — Subgrade Inspections
Joseph Jabour
11/15/2024
Special inspection requirement — Maintenance information
Joseph Jabour
11/12/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/08/2024
Objection raised — Other
11/08/2024
Objection resolved — Addressed
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHM HUGHES CO INC02/11/2026
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY05/05/2025
DOB NOWSolarSigned-offACCORD POWER INC04/25/2025
DOB NOWMechanical SystemsSigned-offHM HUGHES CO INC02/25/2025
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC12/20/2024
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC12/17/2024
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC12/17/2024
DOB NOWFoundationSigned-offHM HUGHES CO INC12/16/2024
DOB NOWConstruction FenceSigned-offHM HUGHES CO INC12/03/2024
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY10/24/2024
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC10/21/2024
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY08/27/2024
DOB NOWGeneral ConstructionPermit IssuedHM HUGHES CO INC05/17/2024
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY05/01/2024
DOB NOWFoundationSigned-offHM HUGHES CO INC04/12/2024
DOB NOWMechanical SystemsSigned-offHM HUGHES CO INC02/02/2024
DOB NOWFoundationSigned-offHM HUGHES CO INC01/25/2024
DOB NOWFoundationSigned-offHM HUGHES CO INC01/25/2024
DOB NOWStructuralSigned-offHM HUGHES CO INC01/25/2024
DOB NOWStructuralSigned-offHM HUGHES CO INC01/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offHM HUGHES CO INC01/23/2024
DOB NOWSupport of ExcavationSigned-offHM HUGHES CO INC01/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offUNITED INDUSTRIES & CONST12/12/2023
DOB NOWFull DemolitionSigned-offUNITED INDUSTRIES & CONST12/12/2023
DOB NOWConstruction FenceSigned-offHM HUGHES CO INC12/07/2023
DOB NOWConstruction FenceSigned-offHM HUGHES CO INC08/25/2023
1 project · most recent 07/29/2025
Associated Ducts and Piping Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2025Signed-offH.M. HUGHES CO. INCAssociated Ducts and Piping, Generators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin DAIKIN FXSQ36TBVJU 3 tons · Vrf Indoor ×6
DAIKIN FXAQ12PVJU 1 tons · Vrf Indoor ×2
DAIKIN RXSQ24TBVJUB 2 tons · Vrf Outdoor ×2
DAIKIN RXYQ120AATJB 10 tons · Vrf Outdoor ×2
DAIKIN FXAQ24PVJU 2 tons · Vrf Indoor ×1
Ventilation
Greenheck GREENHECK G-080-VG 200 CFM · Exhaust Fan ×1
GREENHECK SQ-120-VG 1,000 CFM · Exhaust Fan ×1
Generators
Kohler KOHLER KG180 100 kW · Generator ×1
Ducts & Piping
__Junk__ N/A Custom Sheet Metal 1 BTU · Ductwork ×1
1 project · most recent 07/29/2025
Sprinkler System
FiledStatusContractorScope
07/29/2025Signed-offARCO PLBG AND HTG INCSprinkler System
1 project · most recent 07/29/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/29/2025Permit IssuedCARA PLUMBING GROUP INCGas, Storm, Water/Sanitary
4 projects · most recent 04/16/2026
General Wiring
FiledStatusContractorScope
04/16/2026CompleteGLEN OAKS ELEC'L INC.General Wiring
04/25/2025CompleteACCORD POWER ELECTRIC LLC—
08/26/2024CompleteHIGH QUALITY ELECTRIC OF—
03/13/2022CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 07/29/2025
Steel Concrete
FiledStatusContractorScope
07/29/2025Signed-offH.M. HUGHES CO. INCSteel, Concrete
1 project · most recent 07/29/2025
Earthwork
FiledStatusContractorScope
07/29/2025Signed-offH.M. HUGHES CO. INCEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/06/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
04/02/2025Shutoff dampersJoseph Jabourenergy_progress
04/02/2025HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
04/02/2025HVAC-R and service water heating system controlsJoseph Jabourenergy_progress
04/02/2025HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
04/02/2025FinalJohn Schescharegprogress
04/02/2025Energy Code Compliance InspectionsJoseph Jabourprogress
04/02/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
04/02/2025Mechanical SystemsJoseph Jabourspecial
04/02/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
04/02/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
04/02/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
04/02/2025FinalMalathi Ananthakrishnanprogress
04/02/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
04/02/2025Maintenance informationJoseph Jabourenergy_progress
02/18/2025Sprinkler SystemsJoseph Jabourspecial
02/13/2025Sprinkler SystemsJoseph Jabourspecial
01/09/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
01/09/2025HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
01/09/2025Shutoff dampersJoseph Jabourenergy_progress
01/09/2025HVAC-R and service water heating system controlsJoseph Jabourenergy_progress
01/09/2025HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
01/09/2025Maintenance informationJoseph Jabourenergy_progress
01/09/2025Energy Code Compliance InspectionsJoseph Jabourprogress
01/09/2025FinalJohn Schescharegprogress
01/09/2025Mechanical SystemsJoseph Jabourspecial
Latest 25 of 86.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/24/2026Q00919002-I1Request digital key ↗
08/24/2026Q00927143-A1Request digital key ↗
08/24/2026Q00927143-S1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
12/07/2023440810213Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/28/2023440810213Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q00927143-I1Open ↗
08/13/2026Q00927143-P7Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026Q00927143-I1Open ↗
08/13/2026Q00927143-P7Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00927143-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/24/2026Q00919002-I1Open ↗
08/24/2026Q00927143-I1Open ↗
08/24/2026Q00927143-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/30/2026Q00927143-S5Open ↗
09/30/2026Q00927143-S5Open ↗
09/03/2026Q00927143-P8Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/30/2026Q00927143-S5Open ↗
09/30/2026Q00927143-S5Open ↗
09/03/2026Q00927143-P8Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/28/2023440810213Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/28/2023440810213Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026Q00927143-I1Open ↗
08/13/2026Q00927143-P7Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00943663-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00943663-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00943663-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00943663-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/15/2026Q00927143-I1Open ↗
08/15/2026Q00927143-S5Open ↗
08/13/2026Q00927143-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/13/2026Q00927143-S5Open ↗
08/13/2026Q00927143-I1Open ↗
▸BISSTREET TREE CHECKLIST1
12/06/2023440810213Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00927143-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00927143-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026Q00943663-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00943663-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/24/2026Q00927143-S3Open ↗
▸Inspections & Test Reports11
▸DOB NOWSOIL REPORT7
08/24/2026Q00927143-S4Open ↗
08/15/2026Q00927143-I1Open ↗
08/15/2026Q00927143-S5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026Q00927143-S4Open ↗
08/13/2026Q00927143-S5Open ↗
08/13/2026Q00927143-I1Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00927143-S5Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01204851-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/28/2023440810213Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/15/2026Q00927143-I1Open ↗
08/15/2026Q00927143-S5Open ↗
08/13/2026Q00927143-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026Q00927143-S5Open ↗
08/13/2026Q00927143-P7Open ↗
08/13/2026Q00927143-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00943663-I1Open ↗
08/15/2026Q00927143-I1Open ↗
08/13/2026Q00927143-P7Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00927143-S4Open ↗
08/13/2026Q00927143-S5Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/06/2023440810213Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00943663-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00943663-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00927143-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00943663-I1Open ↗