← Back
Two stories - detached, small or mid-size
55-40 97 PLACE
QUEENS · BIN 4047190
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R6AZoning
1,185 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 2,800 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
Structural
Bulkhead1p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 11p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
55 97 PL2307/08/2026
SUNLIGHT CONSTRUCTION AA303/22/2026
METROCITY CONSTRUCTION303/22/2026
972 PL1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.511/02/2021
NCE CONSULTING ENGINEERS105/05/2021
LI ARCHITECT ASSOCIATE, PLLC112/15/2020
DEPC303/02/2020
TIMES BUILDINGS ENGINEERING SERVICE112/06/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEIYUN CHEN103/21/2026
CONSOLIDATED SCAFFOLD BRIDGE1003/21/2026
LLL CONSTRUCTION403/21/2026
CONAPAC SERVICES DBA103/21/2026
CONAPAC SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor404/09/2026
METRO CITY CONSTRUCTIONGeneral Contractor407/08/2026
VCL CONSTRUCTION INCGeneral Contractor204/09/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
SUNLIGHT CONSTRUCTION AAGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778203/02/2020
Building Lifecycle
All (61)Filed (11)Permit Issued (9)Signed Off (7)Violation (11)Objection (10)Special Inspection (13)
06/16/2025
Violation issued (HPD, closed)
A
12/02/2024
Violation issued (HPD, closed)
I
04/18/2024
Violation issued (HPD, closed)
A
11/22/2022
Signed off — Alteration
New 5 story building structure. Masonry load-bearing walls and steel framed floors with concrete on metal deck. Building utilizes party wall with adjacent new construction at 55-44 97 place. Architectural filing is DOB Job No 421641030.
Q00324256-I1
09/02/2022
Permit issued — Structural
Q00324256-I1-ST
08/16/2022
Signed off — Alteration
Q00441339-I1
08/15/2022
Signed off — Alteration
Project is Support of Excavation Only. Support of Excavation system consists of solider piles on the 97th Street,north lot line and west lot line. Same drawings will be submitted for the work at the adjacent lot.
Q00247547-I1
08/05/2022
Signed off — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD IN ELEVATOR SHAFT AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
Q00512855-I1
08/05/2022
Permit issued — Structural
Q00247547-I1-ST
08/03/2022
Signed off — Alteration
Q00107088-I1
05/31/2022
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00443229-S1
04/26/2022
Violation issued (ECB, closed)
Unknown
03/22/2022
Permit issued — Construction Fence
Q00441339-I1-FN
01/20/2022
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00443229-I1
12/07/2021
Violation issued (ECB, closed)
Construction
11/24/2021
Permit issued — Construction Fence
Q00441339-I1-FN
11/04/2021
Special inspection requirement — Final
RAFI HAMID
11/02/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00443229-P4
09/17/2021
Violation issued (ECB, closed)
Site Safety
05/26/2021
Violation issued (ECB, closed)
Construction
05/06/2021
Permit issued — Supported Scaffold
Q00512855-I1-SF
05/05/2021
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD IN ELEVATOR SHAFT AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
Q00512855-I1
04/13/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00443229-P3
01/21/2021
Permit issued — Supported Scaffold
Q00443229-S1-SF
01/20/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00443229-S1
01/19/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00443229-P2
01/19/2021
Special inspection requirement — Final
RAFI HAMID
01/07/2021
Permit issued — Sidewalk Shed
Q00443229-I1-SH
01/07/2021
Violation issued (ECB, closed)
Construction
12/24/2020
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00443229-I1
12/16/2020
Permit issued — Construction Fence
Q00441339-I1-FN
12/15/2020
Filed — Alteration
Q00441339-I1
09/29/2020
Violation issued (ECB, closed)
Construction
07/13/2020
Violation issued (ECB, closed)
Construction
04/07/2020
Objection raised — Admin
04/07/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Inspections
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Admin
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Admin
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Admin
03/10/2020
Objection resolved — Addressed
03/02/2020
Filed — Alteration
New 5 story building structure. Masonry load-bearing walls and steel framed floors with concrete on metal deck. Building utilizes party wall with adjacent new construction at 55-44 97 place. Architectural filing is DOB Job No 421641030.
Q00324256-I1
02/28/2020
Special inspection requirement — Final
XIONGCAI GU
02/28/2020
Special inspection requirement — Structural Steel - Details
XIONGCAI GU
02/28/2020
Special inspection requirement — Structural Steel - High Strength Bolting
XIONGCAI GU
02/28/2020
Special inspection requirement — Structural Steel - Welding
XIONGCAI GU
02/28/2020
Special inspection requirement — Post-installed Anchors
XIONGCAI GU
02/28/2020
Special inspection requirement — Concrete - Cast-In-Place
XIONGCAI GU
02/28/2020
Special inspection requirement — Masonry
XIONGCAI GU
02/07/2020
Special inspection requirement — Subgrade Inspections
XIONGCAI GU
02/07/2020
Special inspection requirement — Final
XIONGCAI GU
02/07/2020
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
XIONGCAI GU
02/07/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIONGCAI GU
02/06/2020
Filed — Alteration
Project is Support of Excavation Only. Support of Excavation system consists of solider piles on the 97th Street,north lot line and west lot line. Same drawings will be submitted for the work at the adjacent lot.
Q00247547-P1
10/18/2019
Filed — Alteration
Project is Support of Excavation Only. Support of Excavation system consists of solider piles on the 97th Street,north lot line and west lot line. Same drawings will be submitted for the work at the adjacent lot.
Q00247547-I1
05/21/2019
Permit issued — Construction Fence
Q00107088-I1-FN
12/06/2018
Filed — Alteration
Q00107088-I1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offVCL CONSTRUCTION INC09/02/2022
DOB NOWStructuralSigned-offVCL CONSTRUCTION INC08/05/2022
DOB NOWConstruction FenceSigned-offMETRO CITY CONSTRUCTION03/22/2022
DOB NOWConstruction FenceSigned-offMETRO CITY CONSTRUCTION11/24/2021
DOB NOWSupported ScaffoldSigned-offMETRO CITY CONSTRUCTION05/06/2021
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING01/21/2021
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING01/07/2021
DOB NOWConstruction FenceSigned-offMETRO CITY CONSTRUCTION12/16/2020
DOB NOWConstruction FenceSigned-offSUNLIGHT CONSTRUCTION AA05/21/2019
BISOTISSUEDVCL CONSTRUCTION INC09/30/2022
BIS—ISSUEDMETRO CITY CONSTRUCTION03/18/2022
BIS—ISSUEDMETRO CITY CONSTRUCTION12/28/2021
BIS—ISSUEDMETRO CITY CONSTRUCTION09/04/2021
BIS—ISSUEDMETRO CITY CONSTRUCTION06/23/2021
BIS—ISSUEDMETRO CITY CONSTRUCTION01/13/2021
BIS—ISSUEDMETRO CITY CONSTRUCTION01/11/2021
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA10/27/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA08/25/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA02/19/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA02/19/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA01/31/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA01/31/2020
BIS—ISSUEDDYNASTY CONTRACTING LLC06/07/2019
4 projects · most recent 05/25/2022
General Wiring
FiledStatusContractorScope
05/25/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
07/18/2021CompleteTITAN ELEC'L & ELEV CONTR—
01/27/2021CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
01/04/2021CompleteV. VASS ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/04/2021FinalRAFI HAMIDprogress
01/19/2021FinalRAFI HAMIDprogress
02/28/2020FinalXIONGCAI GUprogress
02/28/2020Structural Steel - DetailsXIONGCAI GUspecial
02/28/2020Structural Steel - High Strength BoltingXIONGCAI GUspecial
02/28/2020Structural Steel - WeldingXIONGCAI GUspecial
02/28/2020Post-installed AnchorsXIONGCAI GUspecial
02/28/2020Concrete - Cast-In-PlaceXIONGCAI GUspecial
02/28/2020MasonryXIONGCAI GUspecial
02/07/2020Subgrade InspectionsXIONGCAI GUspecial
02/07/2020FinalXIONGCAI GUprogress
02/07/2020Subsurface Conditions – Fill Placement & In-Place DensityXIONGCAI GUspecial
02/07/2020Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Supported Scaffold3
08/27/2026Q00443229-S1Request digital key ↗
08/15/2026Q00443229-P4Request digital key ↗
08/15/2026Q00443229-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
08/28/2026Q00247547-P1Request digital key ↗
08/28/2026Q00247547-I1Request digital key ↗
08/28/2026Q00324256-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/28/2026Q00107088-I1Request digital key ↗
08/27/2026Q00512855-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/27/2026Q00443229-I1Request digital key ↗
08/15/2026Q00443229-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00441339-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION19
06/24/2022421641030Open ↗
04/26/2022421641030Open ↗
03/07/2022421791706Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION13
09/30/2022421757502Open ↗
03/11/2022421641030Open ↗
07/28/2021421641030Open ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
07/14/2022421641030Open ↗
03/26/2019421641030Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
01/18/2019421641030Open ↗
01/18/2019421641030Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
03/26/2019421641030Open ↗
03/26/2019421641030Open ↗
▸BISVERIFY TAX LOT1
05/10/2022421641030Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/26/2022421641030Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026Q00107088-I1Open ↗
08/28/2026Q00247547-I1Open ↗
08/28/2026Q00247547-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/26/2026Q00324256-I1Open ↗
08/26/2026Q00324256-I1Open ↗
08/26/2026Q00324256-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/11/2020421641030Open ↗
02/11/2020421641030Open ↗
02/10/2020421641030Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q00443229-S1Open ↗
08/26/2026Q00324256-I1Open ↗
08/24/2026Q00443229-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
04/26/2022421641030Open ↗
01/03/2022421641030Open ↗
07/30/2021421641030Open ↗
Showing 3 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/15/2022421641030Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/15/2018421641030Open ↗
▸BISSPRINKLER SYSTEMS1
07/15/2022421641030Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
03/26/2019421641030Open ↗
▸Safety & Tenant Protection8
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
02/11/2020421641030Open ↗
06/18/2019421689408Open ↗
▸BISSTREET TREE CHECKLIST2
03/30/2019421894668Open ↗
10/15/2018421641030Open ↗
▸BISSTREET TREE SIGNOFF1
05/10/2022421641030Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/18/2019421689408Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/18/2019421689408Open ↗
▸BISRODENT CONTROL1
06/18/2019421689408Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/24/2022421757502Open ↗
06/28/2022421641030Open ↗
06/04/2020421757502Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/11/2020421641030Open ↗
03/26/2019421641030Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/15/2022421641030Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/15/2022421641030Open ↗
▸BISLIGHTING CONTROLS1
07/15/2022421641030Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/13/2022421641030Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
07/15/2022421641030Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY9
09/30/2022421757502Open ↗
09/07/2022421757502Open ↗
08/24/2022421757502Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
10/03/2022421757502Open ↗
09/07/2022421757502Open ↗
02/11/2020421641030Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
09/07/2022421757502Open ↗
01/15/2021421641030Open ↗
02/11/2020421641030Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
10/03/2022421757502Open ↗
07/25/2022421641030Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
06/04/2020421757502Open ↗
03/26/2019421641030Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISPOST-INSTALLED ANCHORS1
09/30/2022421757502Open ↗
▸BISHYDRO FLOW TEST LETTER1
03/26/2019421641030Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
06/02/2022421641030Open ↗
▸BISMECHANICAL SYSTEMS1
07/15/2022421641030Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION7
03/11/2022421641030Open ↗
01/07/2022421791706Open ↗
03/25/2021421641030Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
06/24/2022421641030Open ↗
06/21/2022421641030Open ↗
10/28/2020421641030Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/07/2022421757502Open ↗
10/05/2022421757502Open ↗
▸BISLANDMARKS APPROVAL1
06/18/2019421689408Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/20/2022421894668Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/11/2022421641030Open ↗
03/11/2021421641030Open ↗
02/11/2020421641030Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/30/2022421757502Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET4
03/07/2022421791706Open ↗
03/25/2019421894668Open ↗
11/14/2018421689408Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
03/11/2022421641030Open ↗
07/28/2021421641030Open ↗
03/25/2021421641030Open ↗
▸BISADDITIONAL INFORMATION2
07/14/2022421641030Open ↗
08/06/2021421641030Open ↗
▸Other Documents10
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/11/2022421641030Open ↗
02/10/2020421641030Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
09/30/2022421757502Open ↗
07/15/2022421641030Open ↗
▸BISVESTIBULES1
07/15/2022421641030Open ↗
▸BISMAINTENANCE INFORMATION1
07/15/2022421641030Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/07/2022421791706Open ↗
▸BIS* LOADING DECK WEATHER SEALS1
07/15/2022421641030Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
07/15/2022421641030Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/11/2020421641030Open ↗