← Back
BuildNYC
Condo, residential unit in elevator building
Island Condominium
55 AUSTIN PLACE · BIN 5112220
💬 Discuss this project
1962Year Built
8Stories
R4Building Class
R3-2Zoning
138,052 sfGross Floor Area
239Units
Rent Stabilized118 Active Violations 113 unresolved · 5 paperwork only 4 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: Imperial Tower Conduminuim Associates · 1,559 sf lot · 88.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofIsland Condo Management CORP.Under Construction6p · 5 filings · 20 docs
Floor 6Crm Management Services7p · 1 filing · 3 docs
Floor 5Crm Management Services7p · 1 filing · 3 docs
Floor 4Crm Management Services7p · 1 filing · 3 docs
Floor 3Crm Management Services7p · 1 filing · 3 docs
Floor 2Crm Management Services7p · 1 filing · 3 docs
Floor 1Crm Management ServicesUnder Construction11p · 2 filings · 6 docs
Sub-BasementCrm Management Services7p · 1 filing · 3 docs
Site & exteriorIsland Condo Management CORP.Under Construction18p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Imperiial Towers Condominium303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants303/21/2026
Rigid Structural Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Canido Basonas Construction ServiceScaffold807/08/2026
Canido Basonas Construction ServiceGeneral Contractor411/07/2026
Andamio ScaffoldingScaffold404/09/2026
G & C Builders ImprovementScaffold407/08/2026
K.E.S. ConstructionScaffold203/21/2026
K.E.S. ConstructionGeneral Contractor107/08/2026
Rock Group NYGeneral Contractor103/21/2026
Elite Plumbing & HeatingPlumbing103/21/2026
Edras GroupGeneral Contractor207/20/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
French & Parrello Associates1271103/16/2026
R Marsac Consulting329103/16/2026
George J. Xerakias, PE1658208/20/2025
Waypoint Consulting Group6175108/09/2023
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/28/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
S01135395-I1
10/08/2026
Permit renewed — General Construction
Renewed without changes
S00892760-I1-GC
09/03/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S01268737-I1-GC
08/27/2026
Elevator Category 1 inspection report filed
279 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service10/08/2026
DOB NOWConstruction FencePermit IssuedCanido Basonas Construction Service04/30/2026
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction Service04/14/2026
DOB NOWSuspended ScaffoldSigned-offCanido Basonas Construction02/12/2026
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service11/17/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/31/2025
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service09/03/2025
DOB NOWSuspended ScaffoldSigned-offCanido Basonas Construction06/04/2025
DOB NOWConstruction FencePermit IssuedCanido Basonas Construction Service05/29/2025
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service05/29/2025
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction Service05/23/2025
DOB NOWConstruction FencePermit IssuedG & C Builders Improvement04/14/2025
DOB NOWConstruction FencePermit IssuedG & C Builders Improvement11/27/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding11/01/2024
DOB NOWConstruction FencePermit IssuedK.E.S. Construction10/31/2023
DOB NOWGeneral ConstructionPermit IssuedK.E.S. Construction10/16/2023
BISOTISSUEDEdras Group07/20/2017
BISOTISSUEDEdras Group05/16/2017
BISEQISSUEDRock Group NY04/27/2017
BISBLISSUEDEmpire State Fuel03/01/1996
BISPLISSUEDElite Plumbing & Heating03/01/1996
5 projects · most recent 10/30/2024
General Wiring
FiledStatusContractorScope
10/30/2024Permit IssuedBorowide Elect'l Contractors—
08/09/2024CompleteTrue Electric—
10/06/2021Permit IssuedMangi Electrical—
10/06/2021Permit IssuedMangi Electrical—
10/14/2020Permit IssuedMangi ElectricalGeneral Wiring
3 projects · most recent 05/23/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
05/23/2025Permit IssuedCanido Basonas Construction ServiceScaffold
10/31/2024Signed-offAndamio ScaffoldingSidewalk Shed
10/24/2023Permit IssuedCanido Basonas Construction ServiceFence
1 project · most recent 08/20/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/20/2025Permit IssuedCanido Basonas Construction ServiceTenant Protection Plan 72 Hour
1 project · most recent 05/29/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/29/2025Signed-offCanido Basonas ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/27/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/27/2025Post-installed AnchorsGeorge Xerakiasspecial
08/07/2023MasonryAlejandro Molinaspecial
08/07/2023Post-installed AnchorsAlejandro Molinaspecial
08/07/2023Tenant Protection Plan ComplianceAlejandro Molinaspecial
06/19/2023FinalAlejandro Molinaprogress
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account