← Back
STATEN ISLAND
55 CHESTER PLACE
STATEN ISLAND · BIN 5174522
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureFire Protection
Roof1p · 1 filing · 4 docs
Floor 310p · 1 filing · 20 docs
Floor 211p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WWR5459103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS603/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHESTER BUILDERS CORPGeneral Contractor504/09/2026
FLOW-RIGHT PLBG & HTG CORPlumbing407/08/2026
JFR CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677303/12/2025
Building Lifecycle
All (61)Filed (8)Permit Issued (8)Signed Off (3)Inspection (11)Objection (8)Special Inspection (23)
03/12/2025
Filed — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-P3
03/11/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Metering
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
03/11/2025
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
02/21/2025
Signed off — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-S1
10/10/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00551106-I1
09/11/2024
Signed off — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-S2
08/12/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2024
Filed — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-P2
07/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/12/2024
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00551106-P1
06/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2024
Permit issued — Plumbing
S00543378-S2-PL
05/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/28/2024
Permit issued — Plumbing
S00551106-I1-PL
02/12/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/09/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/11/2023
Permit issued — Plumbing
S21829674-S2-PL
09/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/03/2023
Permit issued — General Construction
S00543378-I1-GC
03/01/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/27/2023
Permit issued — Plumbing
S00543378-S2-PL
01/27/2023
Permit issued — Plumbing
S00551106-I1-PL
06/15/2022
Permit issued — General Construction
S00543378-S1-GC-CX
05/18/2022
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00551106-I1
05/04/2022
Permit issued — General Construction
S00543378-I1-GC
12/10/2021
Filed — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-S2
12/10/2021
Objection resolved — Addressed
10/28/2021
Objection raised — Scope
10/05/2021
Filed — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-P1
08/26/2021
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
08/26/2021
Special inspection requirement — Structural Cold-Formed Steel
WILLIAM MONTAGUE
08/26/2021
Special inspection requirement — Structural Steel - Details
WILLIAM MONTAGUE
08/26/2021
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM MONTAGUE
08/26/2021
Special inspection requirement — Structural Steel - Welding
WILLIAM MONTAGUE
08/11/2021
Objection raised — Scope
08/11/2021
Objection resolved — Addressed
07/23/2021
Filed — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-S1
07/15/2021
Objection raised — Scope
07/15/2021
Objection resolved — Addressed
07/07/2021
Objection raised — Energy
07/07/2021
Objection resolved — Addressed
06/30/2021
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
06/29/2021
Filed — New Building
Proposed three (3) story, two (2) Family Residence with accessory off-street parking for three (3) cars
S00543378-I1
06/29/2021
Special inspection requirement — Final
WILLIAM MONTAGUE
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/30/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/28/2024
DOB NOWPlumbingSigned-offJFR CONSTRUCTION CORP10/11/2023
DOB NOWGeneral ConstructionPermit IssuedCHESTER BUILDERS CORP05/03/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR01/27/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR01/27/2023
DOB NOWGeneral ConstructionSigned-offCHESTER BUILDERS CORP06/15/2022
DOB NOWGeneral ConstructionPermit IssuedCHESTER BUILDERS CORP05/04/2022
1 project · most recent 03/12/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/12/2025Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 09/06/2023
General Wiring
FiledStatusContractorScope
09/06/2023CompleteLASER LITE ELECT'L INC.General Wiring
1 project · most recent 03/12/2025
Steel Concrete
FiledStatusContractorScope
03/12/2025Signed-offFLOW-RIGHT PLBG & HTG CORSteel, Concrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/12/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/11/2025Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
03/11/2025Excavations - Sheeting, Shoring, and BracingWILLIAM MONTAGUEspecial
03/11/2025Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
03/11/2025Subgrade InspectionsWILLIAM MONTAGUEspecial
03/11/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/11/2025Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
03/11/2025Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
03/11/2025Maintenance informationWILLIAM MONTAGUEenergy_progress
03/11/2025Interior lighting powerWILLIAM MONTAGUEenergy_progress
03/11/2025Fenestration areasWILLIAM MONTAGUEenergy_progress
03/11/2025MeteringWILLIAM MONTAGUEenergy_progress
03/11/2025Fenestration air leakageWILLIAM MONTAGUEenergy_progress
03/11/2025Air barrier — testing WILLIAM MONTAGUEenergy_progress
03/11/2025Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
03/11/2025Permanent certificateWILLIAM MONTAGUEenergy_progress
08/26/2021Subgrade InspectionsWILLIAM MONTAGUEspecial
08/26/2021Structural Cold-Formed SteelWILLIAM MONTAGUEspecial
08/26/2021Structural Steel - DetailsWILLIAM MONTAGUEspecial
08/26/2021Structural Steel - High Strength BoltingWILLIAM MONTAGUEspecial
08/26/2021Structural Steel - WeldingWILLIAM MONTAGUEspecial
06/30/2021Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
06/29/2021FinalWILLIAM MONTAGUEprogress
06/29/2021Footing and FoundationWILLIAM MONTAGUEprogress
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026S00551106-I1Request digital key ↗
08/24/2026S00551106-P1Request digital key ↗
08/21/2026S00543378-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00543378-P1Open ↗
08/13/2026S00543378-P3Open ↗
08/13/2026S00543378-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00543378-I1Open ↗
08/13/2026S00543378-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00543378-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00551106-I1Open ↗
08/24/2026S00551106-P1Open ↗
08/21/2026S00543378-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026S00543378-P3Open ↗
08/31/2026S00543378-P3Open ↗
08/23/2026S00543378-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026S00543378-P3Open ↗
08/31/2026S00543378-P3Open ↗
08/23/2026S00543378-S1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00543378-I1Open ↗
08/13/2026S00543378-P1Open ↗
08/13/2026S00543378-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00543378-I1—
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/13/2026S00543378-P1Open ↗
08/13/2026S00543378-P3Open ↗
08/13/2026S00543378-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/13/2026S00543378-I1Open ↗
08/13/2026S00543378-S1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026S00543378-S1Open ↗
08/13/2026S00543378-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00543378-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00543378-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00543378-I1Open ↗
08/13/2026S00543378-P1Open ↗
08/13/2026S00543378-P3Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00543378-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00543378-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWOther 8 Documents - Prior to Approval1
08/13/2026S00543378-P1Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form3
08/13/2026S00543378-P1Open ↗
08/13/2026S00543378-I1Open ↗
08/13/2026S00543378-P3Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00543378-S1Open ↗
08/13/2026S00543378-P3Open ↗
08/13/2026S00543378-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026S00543378-I1Open ↗
08/13/2026S00543378-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00543378-I1Open ↗