BuildNYC
Professional building / stand-alone funeral home
55 EAST 34TH STREET
MANHATTAN · BIN 1017104
💬 Discuss this project
1951Year Built
6Stories
O7Building Class
C5-2Zoning
44,100 sfGross Floor Area
11Units
LL97 Covered4 Active Violations 2 unresolved · 2 paperwork only 8 old, status unconfirmed ▸FISP: UNSAFE
Professional building / stand-alone funeral home · 7,350 sf lot · 6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMount Sinai Health SystemUnder Construction2p · 2 filings · 10 docs
Floor 6Sixth floor plumbing system modification48p · 3 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Mount Sinai Health System16p · 3 filings · 20 docs
CellarHVAC equipment installation3p · 1 filing · 11 docs
Site & exteriorProposed heavy duty sidewalk shedUnder Construction6p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mount Sinai Queens2307/08/2026
Mount Sinai Health Systems410/04/2026
Beth Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design103/21/2026
Gig Expediting303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ceprine ConstructionScaffold607/08/2026
Paul M MaintenanceGeneral Contractor507/08/2026
PM Electrical MaintenanceElectrical503/21/2026
Bedrock Plumbing & HeatingPlumbing207/08/2026
Phoenix Sutton STRScaffold209/25/2026
PM Electrical MaintenanceElectrical103/22/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Donnelly Mechanicalspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Urban Integrations7993107/08/2026
Atlantic Engineeringlabor1381806/28/2022
Obaid Mian849101/22/2020
Building Lifecycle
All (126)Filed (14)Permit Issued (14)Signed Off (2)Facade (FISP) (16)Violation (48)Inspection (2)Special Inspection (30)
09/24/2026
Filed — Alteration
Facade repair work as per plans filed herewith.
M01401817-I1
09/24/2026
Permit issued — Sidewalk Shed
M01422209-I1-SH
07/27/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00875234-I1
07/23/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01422209-P1
07/21/2026
Permit issued — Suspended Scaffold
M01414863-I1-SC
07/08/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01414863-I1
07/06/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
07/06/2026
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
06/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01422209-I1
06/30/2026
Permit issued — Sidewalk Shed
M01422209-I1-SH
05/13/2026
Special inspection requirement — Final
05/13/2026
Special inspection requirement — Post-installed Anchors
05/13/2026
Special inspection requirement — Structural Steel - Details
05/13/2026
Special inspection requirement — Masonry
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
04/29/2026
Permit issued — Sidewalk Shed
M00875234-I1-SH
05/07/2025
Permit issued — Sidewalk Shed
M00875234-I1-SH
04/29/2025
Cycle 9 facade report submitted
04/29/2025
Cycle 9 facade report signed — UNSAFE
04/01/2025
Cycle 9 facade inspection completed
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/16/2024
Permit issued — Sidewalk Shed
M00875234-I1-SH
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/18/2023
Cycle 9 facade report submitted
09/18/2023
Cycle 9 facade report signed — UNSAFE
09/18/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/08/2023
Cycle 9 facade inspection completed
05/20/2023
Permit issued — Sidewalk Shed
M00875234-I1-SH
05/19/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00875234-I1
12/09/2022
Violation issued (ECB, open)
Local Law
11/17/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
06/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
Christopher O'Malley
06/29/2022
Special inspection requirement — Maintenance information
Christopher O'Malley
06/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
Christopher O'Malley
06/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher O'Malley
06/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
06/29/2022
Special inspection requirement — Post-installed Anchors
Christopher O'Malley
06/28/2022
Filed — Alteration
Mount Sinai - Ambulatory- Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.
M00600379-P1
06/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAWZY SALIB
06/28/2022
Special inspection requirement — Interior lighting power
FAWZY SALIB
06/28/2022
Special inspection requirement — Final
FAWZY SALIB
06/24/2022
Filed — Alteration
Mount Sinai - Ambulatory - Interior renovations including modifications to non load bearing partitions, flooring, doors, ceilings and related construction as per plans filed herewith. No change in use, egress, or occupancy.
M00600296-P1
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/21/2022
Permit issued — General Construction
M00600296-I1-GC
01/21/2022
Permit issued — Plumbing
M00600379-I1-PL
01/20/2022
Permit issued — Mechanical Systems
M00600362-I1-MS
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2021
Filed — Alteration
Mount Sinai - Ambulatory - Interior renovations including modifications to non load bearing partitions, flooring, doors, ceilings and related construction as per plans filed herewith. No change in use, egress, or occupancy.
M00600296-I1
10/22/2021
Filed — Alteration
Mount Sinai - Ambulatory - Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy.
M00600362-I1
10/22/2021
Filed — Alteration
Mount Sinai - Ambulatory- Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.
M00600379-I1
10/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
FAWZY SALIB
10/20/2021
Special inspection requirement — Energy Code Compliance Inspections
FAWZY SALIB
10/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
FAWZY SALIB
10/20/2021
Special inspection requirement — Duct leakage testing, insulation and design
FAWZY SALIB
10/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
FAWZY SALIB
10/20/2021
Special inspection requirement — Maintenance information
FAWZY SALIB
10/20/2021
Special inspection requirement — Shutoff dampers
FAWZY SALIB
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR09/24/2026
DOB NOWSuspended ScaffoldPermit IssuedPhoenix Sutton Structural07/21/2026
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR06/30/2026
DOB NOWSidewalk ShedSigned-offCeprine Construction04/29/2026
DOB NOWSidewalk ShedSigned-offCeprine Construction05/07/2025
DOB NOWSidewalk ShedSigned-offCeprine Construction05/16/2024
DOB NOWSidewalk ShedSigned-offCeprine Construction05/20/2023
DOB NOWGeneral ConstructionPermit IssuedPaul M Maintenance01/21/2022
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating01/21/2022
DOB NOWMechanical SystemsPermit IssuedPaul M Maintenance01/20/2022
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating09/28/2021
DOB NOWGeneral ConstructionPermit IssuedPaul M Maintenance09/27/2021
DOB NOWMechanical SystemsPermit IssuedPaul M Maintenance09/27/2021
DOB NOWMechanical SystemsSigned-offDonnelly Mechanical01/22/2020
BISMHISSUEDPlanet Mechanical03/07/2019
BISFSISSUEDAce Atlas11/04/2009
BISEQISSUEDAdvanced Installations01/09/2008
BISOTISSUEDPolonia Development & Pre04/27/2007
BISEQISSUEDAdvanced Installations01/09/2007
BISEQISSUEDAdvanced Installations11/22/2006
BISOTISSUEDPolonia Development & Pre06/29/2006
BISPLISSUEDStellmar Plumbing & Mechanical02/17/2006
BISMHISSUEDThomas Ricotta Contractors09/30/2005
BISMHISSUEDGazetten Construction03/26/2004
BISOTISSUEDGazetten __Construction03/26/2004
BISPLISSUEDCardoza11/17/2003
BISOTISSUEDGazetten __Construction11/05/2003
BISMHISSUEDGazetten Construction11/05/2003
BISPLISSUEDTaggart Ass02/16/1995
BISOTISSUEDJames S. Mitchell & Sons02/07/1995
1 project · most recent 10/22/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/22/2021Permit IssuedPaul M MaintenanceAir Conditioning Systems
Cooling
Mitsubishi Electric PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×1
1 project · most recent 06/28/2022
Water/Sanitary
FiledStatusContractorScope
06/28/2022Signed-offBedrock Plumbing & HeatingWater/Sanitary
8 projects · most recent 06/30/2026
General Wiring
FiledStatusContractorScope
06/30/2026Permit IssuedRichard Neu—
05/31/2023Permit IssuedBorowide Elect'l Contractors—
11/04/2022CompletePM Electrical MaintenanceGeneral Wiring
04/06/2022CompletePM Electrical MaintenanceGeneral Wiring
04/06/2022CompletePM Electrical Maintenance—
01/12/2022Permit IssuedAlbin Gustafson CompanyGeneral Wiring
05/09/2019Permit IssuedLeader Electric CoGeneral Wiring
11/02/2018Permit IssuedCentennial Elevator IndustriesGeneral Wiring
1 project · most recent 09/24/2026
Steel Masonry
FiledStatusContractorScope
09/24/2026——Steel, Masonry
2 projects · most recent 07/23/2026
Sidewalk Shed
FiledStatusContractorScope
07/23/2026Permit IssuedPhoenix Sutton STRSidewalk Shed
05/19/2023Signed-offCeprine ConstructionSidewalk Shed
1 project · most recent 07/08/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/08/2026Permit IssuedPhoenix Sutton StructuralSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
07/06/2026Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
07/06/2026Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
07/06/2026Post-installed AnchorsDANNY TRUJILLOspecial
05/13/2026Final—progress
05/13/2026Post-installed Anchors—special
05/13/2026Structural Steel - Details—special
05/13/2026Masonry—special
05/13/2026Energy Code Compliance Inspections—progress
06/29/2022Energy Code Compliance InspectionsChristopher O'Malleyprogress
06/29/2022HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
06/29/2022Maintenance informationChristopher O'Malleyenergy_progress
06/29/2022HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
06/29/2022HVAC-R and service water piping design and insulationChristopher O'Malleyenergy_progress
06/29/2022Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
06/29/2022Post-installed AnchorsChristopher O'Malleyspecial
06/28/2022Fire-Resistant Penetrations and JointsFAWZY SALIBspecial
06/28/2022Interior lighting powerFAWZY SALIBenergy_progress
06/28/2022FinalFAWZY SALIBprogress
10/20/2021HVAC-R and service water piping design and insulationFAWZY SALIBenergy_progress
10/20/2021Energy Code Compliance InspectionsFAWZY SALIBprogress
10/20/2021HVAC-R and service water heating equipmentFAWZY SALIBenergy_progress
10/20/2021Duct leakage testing, insulation and designFAWZY SALIBenergy_progress
10/20/2021HVAC-R and service water heating system controlsFAWZY SALIBenergy_progress
10/20/2021Maintenance informationFAWZY SALIBenergy_progress
10/20/2021Shutoff dampersFAWZY SALIBenergy_progress
Latest 25 of 45.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai Health SystemMedical / HealthcareFloor 1, Roof
Project M01401817 Alteration · Plan Examiner Review · 09/24/2026
Project M00586916 Alteration · Permit Entire · 09/21/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
10/04/2026M01401817-I1Request digital key ↗
09/03/2026M00587752-I1Request digital key ↗
09/03/2026M00586981-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00273750-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
01/24/2020140833221Open ↗
01/22/2020140833221Open ↗
12/31/2019140833221Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
03/06/2019140833221Open ↗
08/12/2010120434663Open ↗
11/04/2009120198133Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature26
10/02/2026M00586981-I1Open ↗
10/02/2026M00586981-I1Open ↗
10/02/2026M00586981-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/02/2026M00586981-I1Open ↗
10/02/2026M00586981-I1Open ↗
08/28/2026M00600379-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
10/04/2026M01401817-I1Open ↗
09/05/2026M00273750-I1Open ↗
09/03/2026M00586981-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/03/2020140833221Open ↗
01/24/2020140833221Open ↗
08/11/2010120434663Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/11/2010120434663Open ↗
11/02/2009120198133Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/11/2010120434663Open ↗
11/02/2009120198133Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/06/2019140833221Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/06/2019140833221Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/06/2019140833221Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/23/2020140833221Open ↗
▸BISEQUIPMENT USE PERMITS1
01/23/2020140833221Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/02/2009120198133Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00586981-I1Open ↗
08/13/2026M00587752-I1Open ↗
08/13/2026M00600362-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/02/2009120198133Open ↗
11/02/2009120198133Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/11/2010120434663Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/06/2019140833221Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/05/2026M00273750-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/03/2020140833221Open ↗
01/24/2020140833221Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/06/2019140833221Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/03/2020140833221Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/06/2019140833221Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
01/24/2020140833221Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/05/2026M00273750-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/06/2019140833221Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
10/04/2026M01401817-I1Open ↗
09/05/2026M00273750-I1Open ↗
08/16/2026M01422209-P1Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/28/2020140833221Open ↗
02/03/2020140833221Open ↗
01/24/2020140833221Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/03/2020140833221Open ↗
02/03/2020140833221Open ↗
01/24/2020140833221Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/11/2010120434663Open ↗
11/02/2009120198133Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/03/2020140833221Open ↗
01/24/2020140833221Open ↗
03/06/2019140833221Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM4
02/28/2020140833221Open ↗
02/03/2020140833221Open ↗
01/24/2020140833221Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
08/11/2010120434663Open ↗
11/02/2009120198133Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/06/2019140833221Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/26/2010120198133Open ↗
▸BISARA Supporting Document1
01/24/2020140833221Open ↗
▸DOB NOWCalculations1
08/16/2026M01414863-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01414863-I1Open ↗