← Back
BuildNYC
School or academy
Horace Mann School Nursery-Kinderga
55 EAST 90TH STREET · BIN 1046986
💬 Discuss this project
1904Year Built
6Stories
W3Building Class
R8BZoning
10,700 sfGross Floor Area
1Units
0 Active Violations
School or academy · Owner of record: Horace Mann School · 2,517 sf lot · 4.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHorace Mann17p · 3 filings · 18 docs
BulkheadHorace Mann3p · 2 filings · 18 docs
Floor 6Horace Mann2p · 1 filing · 4 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Horace Mann2p · 1 filing · 10 docs
Site & exteriorHorace Mann21p · 4 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Horace Mann School1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG504/08/2026
Paul Perdek207/09/2025
Wellworth Consulting906/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
United Safety Consultants903/21/2026
AE Design Solution803/21/2026
EDG403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1307/08/2026
Preserv BLD Restoration ManagementScaffold603/21/2026
Preserv BLD Restoration ManagementGeneral Contractor407/08/2026
Top Shelf ElectricElectrical103/21/2026
Modern Pro ContractingGeneral Contractor107/08/2026
Horace Mann SchoolElectrical103/21/2026
V. Vass ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578310/09/2025
Leo Y Lee Associates2481204/16/2025
Building Lifecycle
All (98)Filed (18)Permit Issued (18)Signed Off (9)Violation (27)Inspection (2)Objection (12)Special Inspection (12)
08/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Filed — Alteration CO
CONVERT EXISTING 1ST FLOOR REAR YARD AND EXISTING ROOF OF AN EXISTING NURSERY SCHOOL INTO ACCESSORY OUTDOOR PLAY AREAS. NO CHANGES IN FLOOR AREA, BUILDING BULK & HEIGHT, OR TO THE PRIMARY USE GROUP. WORK TO INCLUDE EGRESS COMPLIANCE.
M01263588-P1
02/05/2026
Signed off — Alteration
PROPOSED FACADE & ROOF REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01001452-I1
02/03/2026
Signed off — Alteration
M01288128-I1
01/28/2026
Permit issued — Structural
M01288128-I1-ST
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/05/2025
Permit issued — General Construction
M01263588-I1-GC
10/31/2025
Special inspection requirement — Masonry
Anthony Stasio
10/31/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
10/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
10/31/2025
Special inspection requirement — Final
Anthony Stasio
10/13/2025
Objection resolved — Addressed
10/09/2025
Filed — Alteration
PROPOSED FACADE & ROOF REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01001452-P1
10/01/2025
Filed — Alteration
M01288128-I1
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
10/01/2025
Special inspection requirement — Final
Anthony Stasio
10/01/2025
Special inspection requirement — Masonry
Anthony Stasio
10/01/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
09/19/2025
Signed off — Alteration
M01030689-I1
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01041617-I1
09/18/2025
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-I1
09/18/2025
Signed off — Alteration
M01077565-I1
09/18/2025
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-S2
09/18/2025
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-S3
09/15/2025
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-S1
08/27/2025
Objection raised — Admin
08/27/2025
Objection raised — Cost
08/27/2025
Objection raised — Scope
08/14/2025
Filed — Alteration CO
CONVERT EXISTING 1ST FLOOR REAR YARD AND EXISTING ROOF OF AN EXISTING NURSERY SCHOOL INTO ACCESSORY OUTDOOR PLAY AREAS. NO CHANGES IN FLOOR AREA, BUILDING BULK & HEIGHT, OR TO THE PRIMARY USE GROUP. WORK TO INCLUDE EGRESS COMPLIANCE.
M01263588-I1
08/01/2025
Permit issued — Sidewalk Shed
M00913399-I1-SH
07/11/2025
Permit issued — Protection and Mechanical Methods
M01077565-I1-PMM
07/09/2025
Filed — Alteration
M01077565-I1
06/16/2025
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-P5
06/16/2025
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-P4
05/29/2025
Permit issued — Protection and Mechanical Methods
M01041617-I1-PMM
05/08/2025
Permit issued — Protection and Mechanical Methods
M00913399-S3-PMM
05/08/2025
Permit issued — Protection and Mechanical Methods
M00913399-S2-PMM
05/08/2025
Permit issued — Supported Scaffold
M00913399-S1-SF
04/30/2025
Permit issued — General Construction
M01001452-I1-GC
04/30/2025
Violation issued (ECB, closed)
Construction
04/30/2025
Violation issued (ECB, closed)
Construction
04/18/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/18/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
04/16/2025
Filed — Alteration
M01030689-P1
04/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/15/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
12/19/2024
Permit issued — Suspended Scaffold
M01030689-I1-SC
08/02/2024
Permit issued — Sidewalk Shed
M00913399-I1-SH
07/09/2024
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-P3
06/19/2024
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-P2
06/19/2024
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-P1
06/04/2024
Permit issued — Protection and Mechanical Methods
M01041617-I1-PMM
05/29/2024
Filed — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01041617-I1
05/10/2024
Permit issued — Suspended Scaffold
M01030689-I1-SC
05/09/2024
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-S2
05/09/2024
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-S3
05/09/2024
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00913399-S1
05/09/2024
Permit issued — Supported Scaffold
M00913399-S1-SF
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPreserv BLD Restoration Management01/28/2026
DOB NOWGeneral ConstructionPermit IssuedModern Pro Contracting11/05/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/01/2025
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management07/11/2025
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management05/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/08/2025
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding05/08/2025
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management04/30/2025
DOB NOWSuspended ScaffoldSigned-offPreserv Building Restoration12/19/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management06/04/2024
DOB NOWSuspended ScaffoldSigned-offPreserv Building Restoration05/10/2024
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding05/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/09/2024
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management04/30/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/04/2023
BISEQISSUEDConsolidated Scaffold & Bridge06/25/2013
BISEQISSUEDConsolidated Scaffold & Bridge06/25/2013
BISOTISSUEDJust About Building Associates02/12/2013
BISMHISSUEDGood-Will Mechanical07/06/2012
BISMHISSUEDGood-Will Mechanical06/07/2012
BISPLISSUEDCasa Mechanical Co09/13/2004
BISBLISSUEDCasa Mechanical Co09/13/2004
1 project · most recent 08/04/2023
FiledStatusContractorScope
08/04/2023CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/31/2025MasonryAnthony Stasiospecial
10/31/2025Post-installed AnchorsAnthony Stasiospecial
10/31/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
10/31/2025FinalAnthony Stasioprogress
10/01/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
10/01/2025FinalAnthony Stasioprogress
10/01/2025MasonryAnthony Stasiospecial
10/01/2025Post-installed AnchorsAnthony Stasiospecial
04/18/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/18/2025Post-installed AnchorsLeo Leespecial
04/15/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/15/2025Post-installed AnchorsLeo Leespecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Horace MannEducationEntire building
Project M01288128 Alteration · LOC Issued · 10/01/2025
Project M01263588 Alteration CO · Permit Entire · 08/14/2025
Project M01077565 Alteration · LOC Issued · 07/09/2025
Project M01041617 Alteration · LOC Issued · 05/29/2024
Project M01030689 Alteration · LOC Issued · 04/05/2024
Project M01001452 Alteration · LOC Issued · 04/01/2024
Project M00913399 Alteration · LOC Issued · 08/03/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/27/2026M01001452-P1Request digital key ↗
08/27/2026M01001452-I1Request digital key ↗
08/27/2026M01030689-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION6
06/28/2013121687022Open ↗
06/28/2013121690287Open ↗
02/14/2013121530806Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
06/28/2013121687022Open ↗
06/28/2013121690287Open ↗
02/14/2013121530806Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLPC Approval/Permit5
08/18/2026M01263588-I1Open ↗
08/13/2026M01263588-P1Open ↗
08/13/2026M01001452-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026M01041617-I1Open ↗
08/27/2026M00913399-P5Open ↗
08/27/2026M00913399-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M01030689-I1Open ↗
09/01/2026M01030689-I1Open ↗
09/01/2026M01030689-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/28/2013121687022Open ↗
06/28/2013121690287Open ↗
03/07/2013121065408Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/28/2013121687022Open ↗
06/28/2013121690287Open ↗
02/14/2013121530806Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/28/2013121687022Open ↗
06/28/2013121690287Open ↗
02/14/2013121530806Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026M01001452-I1Open ↗
08/26/2026M01001452-P1Open ↗
▸Trade Schedules & Equipment16
▸BISEQUIPMENT USE APPLICATION/PERMIT10
03/07/2013121065408Open ↗
05/10/2012121065408Open ↗
05/10/2012121065408Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS6
03/07/2013121065408Open ↗
03/07/2013121065408Open ↗
03/07/2013121065408Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/10/2012121065408Open ↗
04/17/2012121045145Open ↗
05/10/2012121065408Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
02/14/2013121530806Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026M01288128-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01001452-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY2
05/10/2012121065408Open ↗
04/17/2012121045145Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/07/2013121065408Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/14/2013121530806Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/07/2013121065408Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/19/2022121690287Open ↗
01/19/2022121687022Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/27/2026M01030689-I1Open ↗
08/22/2026M01077565-I1Open ↗
08/21/2026M01288128-I1Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/28/2013121687022Open ↗
06/28/2013121690287Open ↗
02/14/2013121530806Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/07/2013121065408Open ↗
▸BISLANDMARKS APPROVAL1
03/07/2013121065408Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M01001452-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/07/2013121065408Open ↗
02/14/2013121530806Open ↗
05/10/2012121065408Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
06/28/2013121687022Open ↗
06/28/2013121690287Open ↗
02/14/2013121530806Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
08/24/2012121065408Open ↗
▸BISeFiling Job Application Cover Sheet1
04/17/2012121045145Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building2
08/18/2026M01263588-I1Open ↗
08/13/2026M01263588-P1Open ↗
▸DOB NOWCalculations2
08/27/2026M01030689-I1Open ↗
08/13/2026M01030689-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/27/2026M01030689-I1Open ↗
08/13/2026M01030689-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026M01263588-I1Open ↗
08/13/2026M01263588-P1Open ↗