← Back
Two family frame
55 IRVING PLACE
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5174733
💬 Discuss this project
2021Year Built
—Stories
B2Building Class
R3AZoning
2,500 sfGross Floor Area
2Units
Two family frame · 3,600 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Attic1 filing · 2 docs
Floor 21p · 3 filings · 4 docs
Floor 12p · 4 filings · 6 docs
Cellar1p · 3 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DONATO1607/08/2026
CLAWSON303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI201/06/2022
A TECH ENGINEERING NYC, PLLC.107/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA203/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADONIA DEVELOPMENT CORPGeneral Contractor203/21/2026
DONATO, INCPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing207/08/2026
Building Lifecycle
All (19)Filed (3)Permit Issued (5)Signed Off (3)Inspection (8)
05/26/2022
Signed off — Alteration
Installation of new fire sprinkler system with valves and meters for same.
S00551539-I1
05/25/2022
Signed off — Alteration
INSTALLATION OF NEW STORM, WATER/SANITARY AND GAS PLUMBING WORK IN CONJUNCTION WITH A NEW BUILDING A NEW BUILDING (NB) BIS#540193404
S00524563-I1
05/23/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/10/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/05/2022
Permit issued — Plumbing
S65912680-I1-PL
04/28/2022
Signed off — Alteration
10' CURB CUT NORTH SIDE OF IRVING PLACE, WEST OF PROPERTY LINE
S00561955-I1
04/05/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/30/2022
Permit issued — Curb Cut
S00561955-I1-CC
02/07/2022
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
02/03/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
02/01/2022
Permit issued — Plumbing
S00551539-I1-PL
01/06/2022
Filed — Alteration
10' CURB CUT NORTH SIDE OF IRVING PLACE, WEST OF PROPERTY LINE
S00561955-I1
11/05/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/16/2021
Permit issued — Plumbing
S65912680-I1-PL
07/09/2021
Filed — Alteration
Installation of new fire sprinkler system with valves and meters for same.
S00551539-I1
06/23/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/16/2021
Permit issued — Plumbing
S00524563-I1-PL
06/11/2021
Filed — Alteration
INSTALLATION OF NEW STORM, WATER/SANITARY AND GAS PLUMBING WORK IN CONJUNCTION WITH A NEW BUILDING A NEW BUILDING (NB) BIS#540193404
S00524563-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC05/05/2022
DOB NOWCurb CutSigned-offMADONIA DEVELOPMENT CORP03/30/2022
DOB NOWPlumbingSigned-offDONATO, INC02/01/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/16/2021
DOB NOWPlumbingSigned-offDONATO, INC06/16/2021
BIS—ISSUEDMADONIA DEVELOPMENT CORP01/27/2022
1 project · most recent 10/27/2021
General Wiring
FiledStatusContractorScope
10/27/2021CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2022Pass-Final PL - UndergroundPassView ↗
04/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
02/07/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
02/03/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/05/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/13/2021Pass-Final PL - UndergroundPassView ↗
06/23/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026S00524563-I1Request digital key ↗
08/25/2026S00551539-I1Request digital key ↗
08/24/2026S00561955-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
06/02/2022540193404Open ↗
05/31/2022540193404Open ↗
12/14/2021540190746Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/24/2022540190746Open ↗
11/25/2020540190746Open ↗
▸BISWORK PERMIT APPLICATION1
05/03/2021540193404Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
04/28/2022540193404Open ↗
12/20/2021540190746Open ↗
▸BISZONING DIAGRAM2
03/19/2021540193404Open ↗
03/17/2021540193404Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/17/2021540193404Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/19/2021540193404Open ↗
▸BISVERIFY TAX LOT1
04/04/2022540193404Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/17/2021540193404Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/04/2022540193404Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00524563-I1Open ↗
08/24/2026S00561955-I1Open ↗
08/13/2026S00551539-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/23/2020540193404Open ↗
11/25/2020540190746Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/23/2020540193404Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/25/2020540190746Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/23/2020540193404Open ↗
▸Trade Schedules & Equipment8
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
04/04/2022540193404Open ↗
12/23/2020540193404Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/28/2022540193404Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/28/2022540193404Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
12/23/2020540193404Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/05/2022540193404Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/05/2022540193404Open ↗
▸BISFINAL PLUMBING SIGNOFF1
06/09/2022540193404Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/27/2021540193404Open ↗
▸BISSTREET TREE SIGNOFF1
04/28/2022540193404Open ↗
▸BISSTREET TREES SITE PLAN1
04/04/2022540193404Open ↗
▸Energy Compliance13
▸BISAIR SEALING AND INSULATION - TESTING2
03/24/2022540193404Open ↗
03/24/2022540193404Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/28/2022540193404Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/28/2022540193404Open ↗
▸BISFENESTRATION AREAS1
04/28/2022540193404Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/27/2021540193404Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/13/2022540193404Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/28/2022540193404Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/28/2022540193404Open ↗
▸BISLIGHTING CONTROLS1
04/28/2022540193404Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/13/2022540193404Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/23/2020540193404Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/28/2022540193404Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/27/2021540193404Open ↗
11/25/2020540190746Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
04/04/2022540193404Open ↗
05/03/2021540193404Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/13/2022540193404Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
04/13/2022540193404Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/14/2022540193404Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/13/2022540193404Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/13/2022540193404Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/13/2022540193404Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/25/2020540190746Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/13/2022540193404Open ↗
▸BISSOIL REPORT1
12/23/2020540193404Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
04/13/2022540193404Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE1
03/19/2021540193404Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/25/2020540190746Open ↗
▸BISCURB CUT (CC) SIGNOFF1
04/28/2022540193404Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
12/23/2020540193404Open ↗
11/25/2020540190746Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION3
05/24/2022540190746Open ↗
11/25/2020540190746Open ↗
11/25/2020540190746Open ↗
▸BISSHUTOFF DAMPERS1
04/28/2022540193404Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/23/2020540193404Open ↗
▸BISMAINTENANCE INFORMATION1
04/28/2022540193404Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
04/28/2022540193404Open ↗
▸BISPERMANENT CERTIFICATE1
04/28/2022540193404Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
05/20/2022540193404Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
04/28/2022540193404Open ↗