← Back
Elevator cooperative
55 NORTH MOORE STREET
MANHATTAN · BIN 1002120
💬 Discuss this project
1890Year Built
6Stories
D4Building Class
C6-2AZoning
23,700 sfGross Floor Area
14Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: LEICESTERCHIRE ARMS LTD · 4,380 sf lot · 5.41 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalFire Protection
Floor 63p · 1 filing · 5 docs
Floor 53p · 1 filing · 5 docs
Floor 43p · 1 filing · 5 docs
Floor 33p · 1 filing · 5 docs
Floor 23p · 1 filing · 5 docs
Floor 145p · 4 filings · 20 docs
Mezzanine3p · 1 filing · 15 docs
Cellar3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGH QUALITY CONST LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRISTOPHER TEETER505/14/2025
KEVIN GALLEN PE LLC103/21/2022
TAN ENGINEERING PC712/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHRISTOPHER TEETER RA1203/21/2026
AGOUTI CONSTRUCTION CONSULTING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CREATIVE HOME BUILDER LLCGeneral Contractor707/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor203/21/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
GREGG NY PLUMBING, INCPlumbing207/08/2026
HV ELECTRIC CORPElectrical103/22/2026
VILLAGE P & H NY INCPlumbing107/08/2026
KG SPRINKLER CORPFire Protection107/08/2026
VILLAGE P & H NY INCFire Protection107/08/2026
AIR DEPOT COMM. REFR. CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962505/14/2025
TAN ENGINEERING, P.C.1291408/31/2021
Building Lifecycle
All (29)Filed (13)Permit Issued (13)Signed Off (3)
12/31/2025
Permit issued — Plumbing
M00620498-I1-PL
05/14/2025
Filed — Alteration
PLUMBING AND SPRINKLER FILINGS IN CONNECTION WITH NYC DOB NOW JOB#: M00531519,M00571106.
M00620498-P1
01/29/2025
Permit issued — General Construction
M00571106-I1-GC
03/19/2024
Permit issued — General Construction
M00571106-I1-GC
04/06/2023
Permit issued — Sprinklers
M00620498-I1-PL
03/29/2023
Permit issued — Mechanical Systems
M00530598-I1-MS
03/29/2023
Permit issued — General Construction
M00571106-I1-GC
01/09/2023
Filed — Alteration
INTERIOR RENOVATION AS INDICATED ON THE PLANS.
M00531519-P1
08/30/2022
Filed — Alteration CO
M00571106-I1
03/21/2022
Filed — Alteration
MECHANICAL SYSTEMS FILINGS IN CONNECTION WITH NYC DOB NOW#: M00531519.
M00530598-I1
03/10/2022
Signed off — Alteration
Modification to existing sprinkler system in conjunction with combination of apartments 2R and 3. Work to include new drain line to cellar. No change of Use, Occupancy Or Egress.
M00336714-I1
02/11/2022
Signed off — Alteration
Mechanical work on floors 2, 3 and the roof in conjunction with the renovation and combination of apartments 2R and 3. No change of Use, Occupancy Or Egress.
M00336563-I1
02/11/2022
Signed off — Alteration
Plumbing work on the second and third floors in conjunction with the renovation and combination of apartments 2R and 3. No change of Use, Occupancy Or Egress.
M00336750-I1
02/11/2022
Permit issued — Sprinklers
M00620498-I1-EW-SP
02/10/2022
Permit issued — Sprinklers
M00620498-I1-PL
12/23/2021
Permit issued — Sprinklers
M00336714-I1-EW-SP
12/02/2021
Filed — Alteration
Plumbing work on the second and third floors in conjunction with the renovation and combination of apartments 2R and 3. No change of Use, Occupancy Or Egress.
M00336750-P2
11/08/2021
Permit issued — General Construction
M00531519-I1-GC
10/28/2021
Filed — Alteration
PLUMBING AND SPRINKLER FILINGS IN CONNECTION WITH NYC DOB NOW JOB#: M00531519,M00571106.
M00620498-I1
08/31/2021
Filed — Alteration
Modification to existing sprinkler system in conjunction with combination of apartments 2R and 3. Work to include new drain line to cellar. No change of Use, Occupancy Or Egress.
M00336714-P2
08/31/2021
Filed — Alteration
Plumbing work on the second and third floors in conjunction with the renovation and combination of apartments 2R and 3. No change of Use, Occupancy Or Egress.
M00336750-P1
08/19/2021
Filed — Alteration
Mechanical work on floors 2, 3 and the roof in conjunction with the renovation and combination of apartments 2R and 3. No change of Use, Occupancy Or Egress.
M00336563-P1
06/17/2021
Filed — Alteration
INTERIOR RENOVATION AS INDICATED ON THE PLANS.
M00531519-I1
04/19/2021
Permit issued — Plumbing
M00336750-I1-PL
11/24/2020
Permit issued — Mechanical Systems
M00336563-I1-MS
11/06/2020
Permit issued — Plumbing
M00336750-I1-PL
10/01/2020
Filed — Alteration
Modification to existing sprinkler system in conjunction with combination of apartments 2R and 3. Work to include new drain line to cellar. No change of Use, Occupancy Or Egress.
M00336714-I1
10/01/2020
Filed — Alteration
Mechanical work on floors 2, 3 and the roof in conjunction with the renovation and combination of apartments 2R and 3. No change of Use, Occupancy Or Egress.
M00336563-I1
10/01/2020
Filed — Alteration
Plumbing work on the second and third floors in conjunction with the renovation and combination of apartments 2R and 3. No change of Use, Occupancy Or Egress.
M00336750-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC12/31/2025
DOB NOWGeneral ConstructionPermit IssuedCREATIVE HOME BUILDER01/29/2025
DOB NOWGeneral ConstructionPermit IssuedCREATIVE HOME BUILDER03/19/2024
DOB NOWSprinklersSigned-offGREGG NY PLUMBING, INC04/06/2023
DOB NOWMechanical SystemsPermit IssuedCREATIVE HOME BUILDER03/29/2023
DOB NOWGeneral ConstructionPermit IssuedCREATIVE HOME BUILDER03/29/2023
DOB NOWSprinklersPermit IssuedVILLAGE P & H NY INC02/11/2022
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC02/10/2022
DOB NOWSprinklersSigned-offH M SPRINKLER INC12/23/2021
DOB NOWGeneral ConstructionPermit IssuedHIGH QUALITY CONSTRUCTION11/08/2021
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS04/19/2021
DOB NOWMechanical SystemsSigned-offAIR DEPOT COMM REFR COR11/24/2020
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS11/06/2020
BISOTISSUEDDEAN FINE BUILDING LLC06/29/2021
BISOTISSUEDDEAN FINE BUILDING LLC06/29/2021
BISOTISSUEDDEAN FINE BUILDING LLC02/04/2021
BISOTISSUEDDEAN FINE BUILDING LLC02/04/2021
BISOTISSUEDDEAN FINE BUILDING LLC09/28/2020
BISOTISSUEDDEAN FINE BUILDING LLC09/25/2020
BISSPISSUEDMETFLOW FIRE CONTROL LLC05/01/2015
BISPLISSUEDZARA PLUMBING CORP02/12/2015
BISPLISSUEDM C M PLBG & HTG, INC07/30/2014
BISPLISSUEDM C M PLBG & HTG, INC12/13/2012
BISPLISSUEDDEROZA-WATSON PLBG & HTG11/13/2012
BISOTISSUEDCORTLANDT CONTRACTING CORP11/09/2012
BIS—ISSUEDFRAZIER & SONS CONSTRUCTI10/16/2012
BISPLISSUEDZONE PLUMBING & HEATING C05/09/2012
BISEQISSUEDFROGIERO CONTRACTING INC01/31/2012
BIS—ISSUEDFROGIERO CONTRACTING INC11/10/2011
BIS—ISSUEDCHANDRABALI RAMANAND10/05/2009
BISPLISSUEDDEMAR PLUMBING CORP02/23/2009
BIS—ISSUEDEVEREST REALTY HOLDINGS I02/19/2008
BISMHISSUEDEVEREST REALTY HOLDINGS I02/13/2008
BISEQISSUEDEVEREST REALTY HOLDINGS I02/13/2008
BISPLISSUEDDEMAR PLUMBING CORP07/31/2007
BISSPISSUEDFIRE PREVENTION PROD. COR07/30/2007
BISOTISSUEDKELLERAN GROUP INC07/25/2007
BISSPISSUEDFIRE PREVENTION PROD. COR06/21/2007
BISPLISSUEDM.O.D. PLUMBING & HTG CORP05/01/2007
BISPLISSUEDMICHAEL BRUNO LICENSED PLBR04/27/2007
+ 9 more permits on file
1 project · most recent 03/21/2022
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/21/2022Permit IssuedCREATIVE HOME BUILDER LLCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUN038GSS4 38,000 BTU · Vrf Outdoor ×1
ARUN060GSS4 60,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck CSP-B110 70 CFM · Exhaust Fan ×2
CSP-B150 100 CFM · Exhaust Fan ×1
SP-B80 20 CFM · Exhaust Fan ×1
TCB-1-13 1,000 CFM · Kitchen Exhaust ×1
Fantech DBF-4XLT 173 CFM · Exhaust Fan ×1
Panasonic FV-10VE2 100 CFM · Erv ×1
Trane BCHC-024 1,000 CFM · Makeup Air ×1
Ducts & Piping
N/A n/a 1 kW · Ductwork ×1
1 project · most recent 05/14/2025
FiledStatusContractorScope
05/14/2025Permit IssuedPARAMOUNT SERVICES, LLC—
1 project · most recent 05/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/14/2025Signed-offGREGG NY PLUMBING, INCGas, Water/Sanitary
4 projects · most recent 01/19/2024
General Wiring
FiledStatusContractorScope
01/19/2024CompleteGILSTON BROTHERS ELECT'LGeneral Wiring
04/10/2023CompleteKINGS ELECTRIC CO., INC.General Wiring
01/14/2022CompleteHV ELECTRIC CORPGeneral Wiring
06/07/2021CompleteLUME ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
01/17/2023Fire-Resistance Rated ConstructionChristopher Teeterprogress
01/17/2023Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
01/17/2023Lighting in dwelling unitsChristopher Teeterenergy_progress
01/09/2023Lighting in dwelling unitsChristopher Teeterenergy_progress
01/09/2023Fire-Resistance Rated ConstructionChristopher Teeterprogress
01/09/2023Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
12/17/2021Energy Code Compliance InspectionsRoger Tanprogress
12/17/2021HVAC insulation and sealing Roger Tanenergy_progress
11/10/2021Energy Code Compliance InspectionsRoger Tanprogress
11/10/2021HVAC insulation and sealing Roger Tanenergy_progress
10/04/2021Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
09/16/2021Sprinkler SystemsRoger Tanspecial
09/01/2021HVAC and service water heating equipment Roger Tanenergy_progress
09/01/2021FinalRoger Tanprogress
09/01/2021Mechanical SystemsRoger Tanspecial
09/01/2021Fire-Resistant Penetrations and JointsRoger Tanspecial
09/01/2021HVAC and service water heating system controls Roger Tanenergy_progress
09/01/2021HVAC insulation and sealing Roger Tanenergy_progress
08/03/2021Sprinkler SystemsRoger Tanspecial
08/02/2021Energy Code Compliance InspectionsRoger Tanprogress
08/02/2021HVAC insulation and sealing Roger Tanenergy_progress
08/02/2021Fire-Resistant Penetrations and JointsRoger Tanspecial
08/02/2021Mechanical SystemsRoger Tanspecial
08/02/2021FinalRoger Tanprogress
08/02/2021HVAC insulation and sealing Roger Tanenergy_progress
Latest 25 of 29.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch6
09/01/2026M00571106-I1Request digital key ↗
09/01/2026M00531519-P1Request digital key ↗
08/23/2026M00620498-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00336750-P2Request digital key ↗
08/15/2026M00336750-P1Request digital key ↗
08/15/2026M00336750-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026M00336563-I1Request digital key ↗
08/14/2026M00336563-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/15/2026M00336714-P2Request digital key ↗
08/14/2026M00336714-I1Request digital key ↗
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION18
09/16/2021140919718Open ↗
09/16/2021140919718Open ↗
08/03/2021140919718Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWLPC Approval/Permit11
09/04/2026M00336750-P2Open ↗
08/15/2026M00336750-P1Open ↗
08/15/2026M00336750-I1Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION8
09/28/2020140919718Open ↗
09/25/2020140919718Open ↗
05/11/2015104305404Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/26/2013120989902Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026M00336750-P1Open ↗
09/02/2026M00336750-P1Open ↗
09/01/2026M00531519-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/04/2026M00336750-P2Open ↗
09/04/2026M00336750-I1Open ↗
09/04/2026M00336750-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M00531519-I1Open ↗
08/29/2026M00531519-P1Open ↗
08/28/2026M00530598-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/31/2014121379301Open ↗
09/20/2012121379301Open ↗
02/28/2012120989902Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/10/2020140919718Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
01/08/2013120989902Open ↗
09/20/2012121379301Open ↗
02/28/2012120989902Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/02/2015104305404Open ↗
09/09/2014121379301Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/25/2008110222090Open ↗
▸Safety & Tenant Protection13
▸DOB NOWTenant Protection Plan7
09/04/2026M00336750-P2Open ↗
08/15/2026M00336750-P1Open ↗
08/15/2026M00336750-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
03/26/2021140919718Open ↗
03/22/2021140919718Open ↗
▸BISPROVIDE UPDATED TENANT PROTECTION PLAN FORM TO MATCH WITH THE NOTES ON PLAN1
09/10/2020140919718Open ↗
▸BISSTREET TREE CHECKLIST1
10/15/2012120989902Open ↗
▸BISST-1 Street Tree Checklist1
10/16/2012120989902Open ↗
▸DOB NOWStreet Tree Checklist1
09/01/2026M00571106-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/04/2026M00336750-P2Open ↗
09/01/2026M00571106-I1Open ↗
08/15/2026M00336750-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/04/2020140919718Open ↗
09/03/2020140919718Open ↗
09/20/2012121379301Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/25/2008110222090Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/31/2014121379301Open ↗
07/09/2013120989902Open ↗
09/20/2012121379301Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/31/2014121379301Open ↗
07/09/2013120989902Open ↗
▸BISTECHNICAL REPORT: ENERGY2
02/28/2012120989902Open ↗
02/28/2012120989902Open ↗
▸BISNYCECC EXEMPTION1
07/10/2020140919718Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00336563-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/04/2022140919718Open ↗
02/04/2022140919718Open ↗
09/04/2020140919718Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/04/2022140919718Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
09/15/2017120989902Open ↗
10/01/2015120989902Open ↗
07/07/2015120989902Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
02/15/2017104122156Open ↗
01/26/2016120989902Open ↗
09/16/2013120989902Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL3
09/04/2020140919718Open ↗
10/25/2012121379301Open ↗
04/19/2012120989902Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/28/2012120989902Open ↗
06/25/2008110222090Open ↗
▸BISSUPERSEDING LETTER1
05/11/2015104305404Open ↗
▸BISLANDMARKS SIGNOFF1
02/08/2022140919718Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
09/04/2020140919718Open ↗
09/04/2020140919718Open ↗
07/10/2020140919718Open ↗
Showing 3 of 7 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
09/25/2020140919718Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/04/2022140919718Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION10
09/22/2021140919718Open ↗
09/22/2021140919718Open ↗
03/26/2021140919718Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET5
08/26/2020140919718Open ↗
09/20/2012121379301Open ↗
02/28/2012120989902Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/10/2020140919718Open ↗