← Back
BuildNYC
Elevator cooperative
55 PARK TERRACE EAST
MANHATTAN · Inwood · BIN 1065004
💬 Discuss this project
1939Year Built
9Stories
D4Building Class
R7AZoning
87,400 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized22 Active Violations ▸FISP: SAFE
Elevator cooperative · 30,900 sf lot · 2.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOutrigger system facade repairUnder Construction1p · 1 filing · 10 docs
BulkheadMasonry replacement along bulkhead1p · 1 filing · 3 docs
Floor 21 filing
Floor 14p · 1 filing · 2 docs
Site & exteriorTemporary Sidewalk Shed InstallationUnder Construction11p · 3 filings · 8 docs
Filed — no permit issuedLimited facade repairs and flashing repairs10p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Terrace Gardens3303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cribstone Engineering209/23/2026
Queens208/04/2026
Falcon Associates103/12/2026
Merritt Engineering Consultants104/04/2023
Enthink Engineers203/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Falcon Group203/21/2026
Merritt Engineering Consultant203/21/2026
Xinos Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold607/08/2026
Argon ElectricalElectrical403/21/2026
Superior Plumbing & HeatingPlumbing207/08/2026
Shuir Electrical ContractorsElectrical203/22/2026
Real Dependabl ContractingGeneral Contractor203/21/2026
Xinos ConstructionScaffold210/14/2026
Master 2 Plumbing & HeatingPlumbing203/22/2026
Webstar Electrical ContractorsElectrical103/21/2026
Nicaj GjeloshElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898208/04/2026
Falcon Engineering Co5649103/12/2026
AA Building & Inspection1519104/04/2023
Merritt Engineering Consulting460104/04/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/13/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01326679-I1-SH
09/23/2026
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01326679-P2
08/31/2026
Co-op apartment B82 sold for $1,030,000
08/20/2026
Elevator Category 1 inspection report filed
165 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXinos Construction10/13/2026
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction12/29/2025
DOB NOWSidewalk ShedPermit IssuedXinos Construction12/02/2025
DOB NOWSidewalk ShedSigned-offReliable Enterprises12/01/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises11/29/2023
DOB NOWGeneral ConstructionSigned-offReal Dependabl Contracting05/09/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises04/03/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises03/30/2023
DOB NOWPlumbingPermit IssuedSuperior Plumbing & Heating03/30/2021
DOB NOWPlumbingPermit IssuedSuperior Plumbing & Heating03/12/2020
BISOTISSUEDRite-Way Wood-Crafts Co03/30/2021
BISOTISSUEDRite-Way Wood-Crafts Co02/28/2020
BISOTISSUEDRenovation by MY Home12/11/2018
BISPLISSUEDPrime Piping & Heating12/30/2016
BISOTISSUEDCMP Contracting12/20/2016
BISEQISSUEDB H & B Construction06/02/2014
BISEQISSUEDReal Dependabl Contracting05/21/2014
BISOTISSUEDReal Dependabl Contracting03/21/2014
BISOTISSUEDL & Z Restoration03/12/2014
BISEQISSUEDL & Z Restoration03/12/2014
BISEQISSUEDB H & B Construction02/25/2014
BISOTISSUEDReal Dependabl Contracting06/06/2012
BISEQISSUEDB H & B Construction05/23/2012
BISEQISSUEDB H & B Construction05/23/2012
BISOTISSUEDL & Z Restoration06/29/2010
BISEQISSUEDIntersystems06/21/2010
BISPLISSUEDS. Tieger Plumbing Co01/15/2009
BISPLISSUEDA.D.S. Plumbing and Heating02/22/2007
BISEQISSUEDLiberty Arch. Products Co01/10/2007
BISOTISSUEDGoldsmith Construction01/05/2007
BISEQISSUEDLiberty Arch. Products Co06/07/2006
BISOTISSUEDDJM Contracting06/05/2000
BISPLISSUEDFred Smith P&H Co04/06/1999
BISEQISSUEDT.B.R09/28/1998
BISOTISSUEDDJM Contracting08/26/1998
BISEQISSUEDSpring Interprises01/09/1997
BISEQISSUEDSpring Interprises05/29/1996
12 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedTower Electric—
09/10/2026Permit IssuedIP2 ElectricGeneral Wiring
03/29/2026Permit IssuedArma ElectricGeneral Wiring
07/20/2024CompleteShuir Electrical ContractorsGeneral Wiring
11/02/2023CompleteShuir Electrical ContractorsGeneral Wiring
04/03/2023CompleteRichard Neu—
10/26/2022CompleteShuir Electrical ContractorsGeneral Wiring
03/09/2022CompleteCreggan Electrial—
11/17/2020CompleteK & G Electric CoGeneral Wiring
06/19/2018Permit IssuedStar Electrical Contractors—
04/20/2018Permit IssuedStar Electrical Contractors—
02/05/2018CompleteGeorge HolnessGeneral Wiring
1 project · most recent 09/23/2026
Sidewalk Shed
FiledStatusContractorScope
09/23/2026Permit IssuedXinos ConstructionSidewalk Shed
1 project · most recent 08/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/04/2026Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/04/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
08/04/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
231 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account