← Back
BuildNYC
Five to six families
55 TEN EYCK STREET
BROOKLYN · BIN 3069677
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R6BZoning
3,750 sfGross Floor Area
6Units
Rent Stabilized6 Active Violations 5 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Five to six families · Owner of record: 55 Ten Eyck Street · 2,500 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Unit 3L4p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
228 Seventh Ave1507/08/2026
55 Ten Eyck403/22/2026
J Wasser & Co203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/08/2024$2.3M—55 TEN EYCK LLC → 55 TEN EYCK STREET LLC$620/sf building
10/17/2013$1.4M—Private party → 55 TEN EYCK LLC$387/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LCW Engineering511/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KSC ContractorGeneral Contractor107/08/2026
Morell BuildersGeneral Contractor103/21/2026
Arco Plumbing & HeatingPlumbing103/21/2026
KSC Contractorspecialty_contractor107/08/2026
MPS Plumbing & HeatingPlumbing107/08/2026
BT's Plumbing and HeatingPlumbing107/28/2016
TCS ConstructionGeneral Contractor109/23/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW Engineering1103310/21/2024
Building Lifecycle
03/19/2026
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING MAXIMUM TEMPERATURE OF 130 DEGREES IN THE ENTIRE APARTMENT…
HPD violation · closed
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
04/02/2025
§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CARPET AT BUILDING REAR AT…
HPD violation · closed
04/01/2025
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOTWATER EXCEEDS THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOTWATER FIXTURES…
HPD violation · open
03/25/2025
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY
HPD violation · closed
230 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKSC Contractor10/31/2024
DOB NOWPlumbingSigned-offMPS Plumbing & Heating07/26/2024
DOB NOWGeneral ConstructionSigned-offKSC Contractor06/28/2024
BISPLISSUEDBT's Plumbing and Heating07/28/2016
BISPLISSUEDArco Plumbing and Heating03/31/2016
BISOTISSUEDMorell Builders03/31/2016
BISOTISSUEDTCS Construction09/23/2014
BISOTISSUEDN/A03/19/1999
BISOTISSUEDN/N03/05/1999
1 project · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025Permit IssuedA.C. Morgan ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/27/2024HVAC-R and service water piping design and insulationluis wongenergy_progress
11/27/2024Energy Code Compliance Inspectionsluis wongprogress
11/27/2024Tenant Protection Plan Complianceluis wongspecial
11/22/2024Tenant Protection Plan Compliance—special
11/22/2024HVAC-R and service water piping design and insulation—energy_progress
11/22/2024Energy Code Compliance Inspections—progress
10/21/2024HVAC-R and service water heating equipmentluis wongenergy_progress
10/21/2024Mechanical Systemsluis wongspecial
10/21/2024Tenant Protection Plan Complianceluis wongspecial
10/21/2024Finalluis wongprogress
10/21/2024Energy Code Compliance Inspectionsluis wongprogress
06/04/2024Tenant Protection Plan Complianceluis wongspecial
06/04/2024Structural Stability – Alterations of existing buildingsluis wongspecial
06/04/2024Fire-Resistant Penetrations and Jointsluis wongspecial
06/04/2024Fenestration air leakageluis wongenergy_progress
06/04/2024Fenestration and door U-factor and product ratingsluis wongenergy_progress
06/04/2024Lighting in dwelling unitsluis wongenergy_progress
06/04/2024Energy Code Compliance Inspectionsluis wongprogress
59 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account