← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Douglass I (NYCHA)
55 WEST 100TH STREET · BIN 1081297
💬 Discuss this project
1958Year Built
17Stories
D1Building Class
R7-2Zoning
689,340 sfGross Floor Area
900Units
LL97 Covered0 Active ViolationsFISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: NYC Housing Authority · 340,742 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsGas piping replacement and plumbing1 filing
RoofNYC Housing Authority17p · 4 filings · 20 docs
BulkheadNYC Housing Authority1p · 1 filing · 20 docs
Floor 1NYC Housing Authority1p · 1 filing · 20 docs
Site & exteriorTemporary sidewalk shed installation8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5709/13/2026
Nyha203/21/2026
City103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Thornton Tomasetti306/16/2026
Odc Associates211/01/2024
Self Propriety (MD A Islam)407/08/2024
Joel Phagoo P.E405/20/2024
RKTB Architects204/23/2024
Shenoy Engineering202/16/2024
Ikra Consulting303/25/2022
AK Consulting Services204/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147403/21/2026
Sharon Rader203/21/2026
Joel Phagoo P.E103/21/2026
Shenoy Engineering403/21/2026
AK Consulting Services1003/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold2307/08/2026
J & N Construction GroupGeneral Contractor704/09/2026
J & N Construction GroupScaffold507/08/2026
MNK EnterprisesScaffold407/08/2026
Zoria HousingScaffold307/08/2026
Skyline P & HPlumbing203/22/2026
Alliance Elevator CompanyElectrical203/21/2026
D.D.S. Mechanical PBG & HeatingPlumbing107/08/2026
Zoria HousingGeneral Contractor107/08/2026
Tri-State Electrical & Mechanical IElectrical103/21/2026
Tri-State Electrical & Mechanical IElectrical103/22/2026
The Maintenance CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP Engineers & Architects1438306/16/2026
Socotec Engineering4983211/01/2024
RI Consulting Services8904207/22/2024
Joel Phagoo, PE2416102/20/2024
MT Group798202/16/2024
Building Lifecycle
All (128)Filed (25)Permit Issued (24)Signed Off (12)Facade (FISP) (15)Violation (19)Inspection (1)Objection (2)Special Inspection (30)
10/14/2026
Signed off — Alteration
HEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08014317-I1
10/01/2026
Signed off — Alteration
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08014341-I1
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
06/23/2026
Special inspection requirement — Final
JAMES WILSON
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES WILSON
06/23/2026
Special inspection requirement — Masonry
JAMES WILSON
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
06/16/2026
Filed — Alteration
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08014341-P2
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
05/29/2026
Special inspection requirement — Final
JAMES WILSON
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES WILSON
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
05/29/2026
Special inspection requirement — Masonry
JAMES WILSON
03/02/2026
Permit issued — General Construction
M08014317-I1-GC
10/10/2025
Permit issued — Structural
M08014341-I1-ST
09/12/2025
Signed off — Alteration
M01051445-I1
08/05/2025
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
M00346100-I1
07/29/2025
Signed off — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 55 WEST 100TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01054286-I1
05/06/2025
Signed off — Alteration
M01054274-I1
11/20/2024
Signed off — Alteration
M00994429-I1
11/04/2024
Special inspection requirement — Final
TIMOTHY WEBB
11/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
11/04/2024
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
11/01/2024
Filed — Alteration
M00994429-P1
08/29/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
08/27/2024
Permit issued — General Construction
M08014317-I1-GC
08/08/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885350-I1
08/08/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885348-I1
07/29/2024
Permit issued — Suspended Scaffold
M01072966-P1-SC
07/29/2024
Special inspection requirement — Post-installed Anchors
MD ISLAM
07/24/2024
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01006350-I1
07/22/2024
Filed — Alteration
Suspended scaffold outrigger system and materials hoist system at 55 West 100 Street, Manhattan NY for roof replacement and repair works.
M01072966-P1
07/22/2024
Permit issued — Plumbing
M00346100-I1-PL
07/22/2024
Permit issued — Suspended Scaffold
M01072966-I1-SC
07/22/2024
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/22/2024
Special inspection requirement — Final
TIMOTHY WEBB
07/22/2024
Special inspection requirement — Post-installed Anchors
MD ISLAM
07/18/2024
Objection raised — Other
07/18/2024
Objection resolved — Addressed
07/11/2024
Filed — Alteration
Suspended scaffold outrigger system and materials hoist system at 55 West 100 Street, Manhattan NY for roof replacement and repair works.
M01072966-I1
07/09/2024
Cycle 9 facade report submitted
07/08/2024
Filed — Alteration
M01054274-P1
07/08/2024
Cycle 9 facade report signed — SAFE
06/26/2024
Cycle 9 facade inspection completed
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2024
Permit issued — Sidewalk Shed
M00885348-I1-SH
06/14/2024
Permit issued — Construction Fence
M00885350-I1-FN
05/23/2024
Permit issued — Supported Scaffold
M01054286-I1-SF
05/22/2024
Filed — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 55 WEST 100TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01054286-I1
05/22/2024
Filed — Alteration
M01054274-I1
05/22/2024
Permit issued — Sidewalk Shed
M01054274-I1-SH
05/21/2024
Permit issued — Construction Fence
M01051445-I1-FN
05/20/2024
Filed — Alteration
M01051445-I1
05/20/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885348-P1
05/20/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885350-P1
05/01/2024
Special inspection requirement — Masonry
JAMES WILSON
05/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group03/02/2026
DOB NOWStructuralSigned-offJ & N Construction Group10/10/2025
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group08/27/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&N Construction Group07/29/2024
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating07/22/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&N Construction Group07/22/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/17/2024
DOB NOWConstruction FenceSigned-offZoria Housing06/14/2024
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group05/23/2024
DOB NOWSidewalk ShedSigned-offJ & N Construction Group05/22/2024
DOB NOWConstruction FenceSigned-offJ & N Construction Group05/21/2024
DOB NOWGeneral ConstructionSigned-offZoria Housing04/26/2024
DOB NOWSuspended ScaffoldSigned-offZoria Housing02/28/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/08/2023
DOB NOWConstruction FenceSigned-offZoria Housing06/08/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/08/2023
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/17/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/03/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/06/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/04/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding10/29/2020
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/02/2020
DOB NOWConstruction FenceSigned-offRoma Scaffolding11/14/2019
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/08/2019
BISPLISSUEDCape Plumbing12/02/2003
BISOTISSUEDTrataors Plumbing & Heating04/07/1997
BISPLISSUEDTrataros PBG/Ace Construction04/07/1997
BISOTISSUEDLeroy Williams PLG and Heating03/12/1993
BISPLISSUEDLeroy Williams PLG and Heating03/12/1993
8 projects · most recent 06/20/2025
General Wiring
FiledStatusContractorScope
06/20/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
08/07/2024CompleteLit Mode Electrical Contg—
05/15/2024CompleteLit Mode Electrical Contg—
05/15/2024CompleteLit Mode Electrical Contg—
03/21/2024CompleteQ.Y. Electric—
03/15/2023CompleteQ.Y. Electric—
09/13/2019Permit IssuedRaiden Electric—
08/22/2019CompleteGilston Electrical ContractingGeneral Wiring
1 project · most recent 06/16/2026
Concrete
FiledStatusContractorScope
06/16/2026Signed-offJ & N Construction GroupConcrete
1 project · most recent 07/22/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/22/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/29/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/23/2026Fire-Resistant Penetrations and JointsJAMES WILSONspecial
06/23/2026FinalJAMES WILSONprogress
06/23/2026Tenant Protection Plan ComplianceJAMES WILSONspecial
06/23/2026MasonryJAMES WILSONspecial
06/23/2026Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
05/29/2026Fire-Resistant Penetrations and JointsJAMES WILSONspecial
05/29/2026FinalJAMES WILSONprogress
05/29/2026Tenant Protection Plan ComplianceJAMES WILSONspecial
05/29/2026Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
05/29/2026MasonryJAMES WILSONspecial
11/04/2024FinalTIMOTHY WEBBprogress
11/04/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
11/04/2024MasonryALEXIS SCHLESSINGERMANspecial
11/04/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/29/2024Post-installed AnchorsMD ISLAMspecial
07/22/2024MasonryALEXIS SCHLESSINGERMANspecial
07/22/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
07/22/2024Tenant Protection Plan Compliance—special
07/22/2024FinalTIMOTHY WEBBprogress
07/22/2024Post-installed AnchorsMD ISLAMspecial
05/01/2024MasonryJAMES WILSONspecial
05/01/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
05/01/2024Post-installed AnchorsJAMES WILSONspecial
05/01/2024Energy Code Compliance InspectionsJAMES WILSONprogress
05/01/2024FinalJAMES WILSONprogress
Latest 25 of 42.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch18
08/28/2026M01006350-I1Request digital key ↗
08/27/2026M08014317-I1Request digital key ↗
08/27/2026M08014317-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00234397-P5Request digital key ↗
09/05/2026M00234397-I1Request digital key ↗
08/15/2026M00234397-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00263633-I1Request digital key ↗
08/15/2026M00263633-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026M00346100-I1Request digital key ↗
08/15/2026M00346100-P1Request digital key ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/05/2026M00263633-I1Open ↗
08/28/2026M00346100-P1Open ↗
08/28/2026M00346100-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
08/31/2026M01072966-I1Open ↗
08/31/2026M00346100-I1Open ↗
08/28/2026M00346100-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026M00994429-P1Open ↗
08/27/2026M08014341-I1Open ↗
08/24/2026M08014341-P2Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan6
09/05/2026M00263633-I1Open ↗
08/13/2026M00234397-P5Open ↗
08/13/2026M00234397-P4Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026M00346100-I1Open ↗
08/13/2026M00994429-I1Open ↗
▸Approvals, Objections & Sign-offs44
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
09/05/2026M00263633-I1Open ↗
08/28/2026M00346100-I1Open ↗
08/28/2026M00346100-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
09/05/2026M00263633-I1Open ↗
08/27/2026M08014341-P2Open ↗
08/13/2026M00263633-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026M00234397-I1Open ↗
08/13/2026M00263633-I1Open ↗
08/13/2026M00346100-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/27/2026M08014317-I1Open ↗
08/27/2026M08014341-I1Open ↗
08/13/2026M00994429-I1Open ↗
▸Other Documents8
▸DOB NOWManufacturer's Specifications3
08/13/2026M01072966-I1Open ↗
08/13/2026M01072966-P1Open ↗
08/13/2026M01006350-I1Open ↗
▸DOB NOWCalculations3
08/13/2026M01006350-I1Open ↗
08/13/2026M01072966-I1Open ↗
08/13/2026M01072966-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M08014317-P1Open ↗
08/13/2026M08014317-I1Open ↗