Office only, 7-19 stories
Arnhold Hall
55 WEST 13 STREET · BIN 1009722
💬 Discuss this project
1900Year Built
9Stories
O3Building Class
C6-2Zoning
86,117 sfGross Floor Area
6Units
LL97 Covered1 Open Violation ▸FISP: SWARMP
Office only, 7-19 stories · Owner of record: NEW SCHOOL-SOCL RESEARCH · 10,325 sf lot · 8.34 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 2 filings · 20 docs
Floor 210p · 3 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW SCHOOL15307/10/2026
VIKING RESTORATION SERVICES707/08/2026
SKYLINE SCAFFOLDING GROUP507/08/2026
FRANCO REMODELING CORP.503/22/2026
T-MOBILE403/22/2026
NEW SCHOOL-SOCL RESEARCH303/22/2026
THE NEW SCHOOL GROUND FLO603/22/2026
NEW SCHOOL UNIVERSITY3403/22/2026
BON MARCHER INC.103/22/2026
BOM MARCHE INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.903/21/2026
Rigid Structural Design, LLC603/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
HIERARCH-E403/21/2026
D R BROWN1003/21/2026
DESIGN 2147 LIMITED103/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
AE DESIGN SOLUTION203/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
EUROCELT EXPEDITING, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIVE TOWN NEON SIGN CO INScaffold507/08/2026
STRUCTURECRAFT CONTRACTINGeneral Contractor507/08/2026
VIKING RESTORATION SVCEGeneral Contractor507/08/2026
JAVELIN ELECTRIC INCElectrical303/22/2026
WATCH HILL WIRELESS SOLUGeneral Contractor303/21/2026
NEPTUNE SIGNS AWNINGSScaffold207/10/2026
LEVINE, GEORGEFire Protection203/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor207/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor107/08/2026
JOSEPH BRAMANElectrical103/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor107/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
NEE ELECTRICAL, LLCElectrical103/22/2026
SHAW MECHANICAL INCPlumbing107/08/2026
JOSEPH SORTINOElectrical103/21/2026
PRECISION HOIST & SCAFFO*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DARIUS TORABY ARCHITECTS,116105/14/2025
BACON LANE ARCHITECT, LLC5402104/03/2025
MEP INSPECTIONS, INC1102303/07/2023
GRANT ENGINEERING CONSULT3512203/02/2023
Building Lifecycle
All (165)Filed (25)Permit Issued (26)Signed Off (15)Facade (FISP) (12)Violation (60)Inspection (9)Objection (4)Special Inspection (14)
07/29/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01228118-I1
07/08/2026
Permit issued — Sign
M01196990-I1-SG
06/16/2026
Permit issued — General Construction
M01219741-I1-GC
06/15/2026
Permit issued — General Construction
M01199871-I1-GC
05/29/2026
Permit issued — Suspended Scaffold
M01219741-S1-SC
05/22/2026
Permit issued — Sidewalk Shed
M01228118-I1-SH
05/21/2026
Permit issued — General Construction
M01199871-I1-GC
04/24/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01228118-P2
11/10/2025
Filed — Alteration
HEREWITH FILING OF EXISTING ROOF ASSEMBLY, PARAPET REPAIRS AT INTERIOR AT INTERIOR FACE & COPINGS & INSTALLATION OF ROOF RAILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01219741-P1
08/13/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01228118-P1
06/05/2025
Permit issued — General Construction
M01219741-I1-GC
05/22/2025
Permit issued — Sidewalk Shed
M01228118-I1-SH
05/21/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01228118-I1
05/20/2025
Permit issued — General Construction
M01199871-I1-GC
05/16/2025
Filed — Alteration
HEREWITH FILING OF EXISTING ROOF ASSEMBLY, PARAPET REPAIRS AT INTERIOR AT INTERIOR FACE & COPINGS & INSTALLATION OF ROOF RAILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01219741-S1
05/16/2025
Permit issued — Suspended Scaffold
M01219741-S1-SC
05/14/2025
Filed — Alteration
HEREWITH FILING OF EXISTING ROOF ASSEMBLY, PARAPET REPAIRS AT INTERIOR AT INTERIOR FACE & COPINGS & INSTALLATION OF ROOF RAILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01219741-I1
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
DARIUS TORABY
05/02/2025
Special inspection requirement — Insulation placement and R values
DARIUS TORABY
05/02/2025
Special inspection requirement — Masonry
DARIUS TORABY
05/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DARIUS TORABY
05/02/2025
Special inspection requirement — Final
DARIUS TORABY
04/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01194904-I1
04/04/2025
Permit issued — Sidewalk Shed
M01194904-I1-SH
04/03/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01194904-I1
04/03/2025
Filed — Alteration
M01199871-I1
04/02/2025
Permit issued — Sign
M01196990-I1-SG
03/28/2025
Filed — Alteration
ERECT 3 NON-ILLUMINATED SIGNS ON EXISTING MARQUEE STRUCTURE. SIGNS ARE ACCESSORY TO THE NEW SCHOOL.
M01196990-I1
03/19/2025
Special inspection requirement — Final
JERE MURDOCH
08/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
02/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/10/2024
Permit issued — General Construction
M00922656-I1-GC
12/01/2023
Objection resolved — Addressed
11/28/2023
Objection raised — Scope
11/20/2023
Objection resolved — Addressed
11/17/2023
Signed off — Alteration
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
M00829744-S3
11/15/2023
Signed off — Alteration
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
M00829744-S1
11/09/2023
Filed — No Work
M00941400-I1
11/08/2023
Signed off — Alteration
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
M00829744-S2
11/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/01/2023
Signed off — Alteration
FILING HEREWITH SPRINKLER WORK AS PER PLANS.
M00829744-I1
11/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2023
Objection raised — Scope
09/30/2023
Cycle 9 facade report signed — SWARMP
09/22/2023
Filed — Alteration CO
FILING HEREWITH INTERIOR WORK TO CONVERT KITCHEN TO THE OFFICE AS PER PLANS.
M00922656-I1
09/09/2023
Cycle 9 facade inspection completed
07/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC07/08/2026
DOB NOWGeneral ConstructionPermit IssuedVIKING RESTORATION SVCE06/16/2026
DOB NOWGeneral ConstructionPermit IssuedVIKING RESTORATION SVCE06/15/2026
DOB NOWSuspended ScaffoldPermit IssuedAMERICAN VENTILATION SERV05/29/2026
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/22/2026
DOB NOWGeneral ConstructionPermit IssuedVIKING RESTORATION SVCE05/21/2026
DOB NOWGeneral ConstructionPermit IssuedVIKING RESTORATION SVCE06/05/2025
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/22/2025
DOB NOWGeneral ConstructionPermit IssuedVIKING RESTORATION SVCE05/20/2025
DOB NOWSuspended ScaffoldPermit IssuedAMERICAN VENTILATION SERV05/16/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S04/04/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH04/02/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURECRAFT CONTRACTIN01/10/2024
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP03/31/2023
DOB NOWMechanical SystemsSigned-offSTRUCTURECRAFT CONTRACTIN03/24/2023
DOB NOWPlumbingSigned-offJAMES CRUZ03/20/2023
DOB NOWGeneral ConstructionSigned-offSTRUCTURECRAFT CONTRACTIN03/03/2023
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU03/25/2022
DOB NOWSignSigned-offENRICO PASSARO08/13/2021
DOB NOWSignSigned-offENRICO PASSARO08/11/2021
DOB NOWSignSigned-offENRICO PASSARO08/11/2021
DOB NOWSignSigned-offENRICO PASSARO08/11/2021
DOB NOWSignSigned-offENRICO PASSARO08/11/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC04/11/2019
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C09/06/2018
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*08/24/2018
BISOTISSUEDQWEST CONTRACTING CORP08/07/2019
BISOTISSUEDQWEST CONTRACTING CORP08/07/2019
BISOTISSUEDFRANCO REMODELING CORP04/11/2019
BISBLISSUEDLIBERTY PLUMBING INC11/14/2018
BISEQISSUEDPRECISION HOIST & SCAFFO*08/29/2018
BISMHISSUEDQWEST CONTRACTING CORP08/08/2018
BISOTISSUEDQWEST CONTRACTING CORP08/08/2018
BISOTISSUEDQWEST CONTRACTING CORP08/08/2018
BISSPISSUEDADVANCED PLBG, MECH & SPR07/26/2018
BISPLISSUEDADVANCED PLUMBING MECH06/28/2018
BISBLISSUEDADVANCED PLUMBING MECH06/28/2018
BISOTISSUEDQWEST CONTRACTING CORP06/20/2018
BISMHISSUEDQWEST CONTRACTING CORP06/20/2018
BISOTISSUEDQWEST CONTRACTING CORP06/20/2018
+ 36 more permits on file
8 projects · most recent 06/04/2025
General Wiring
FiledStatusContractorScope
06/04/2025CompleteTOP SHELF ELECTRIC CORP—
05/19/2025CompleteNEE ELECTRICAL, LLC—
03/13/2023CompleteNEE ELECTRICAL, LLC—
03/08/2023CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
10/29/2019CompleteJAVELIN ELECTRIC INCGeneral Wiring
04/09/2019CompleteBOROWIDE ELECT'L CONTR'S—
10/15/2018CompleteJAVELIN ELECTRIC INC—
09/04/2018CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 04/24/2026
Sidewalk Shed
FiledStatusContractorScope
04/24/2026Signed-offSKYLINE SCAFFOLDING GROUPSidewalk Shed
1 project · most recent 11/10/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/10/2025Permit IssuedVIKING RESTORATION SVCESuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/02/2025Energy Code Compliance InspectionsDARIUS TORABYprogress
05/02/2025Insulation placement and R valuesDARIUS TORABYenergy_progress
05/02/2025MasonryDARIUS TORABYspecial
05/02/2025Structural Stability – Alterations of existing buildingsDARIUS TORABYspecial
05/02/2025FinalDARIUS TORABYprogress
03/19/2025FinalJERE MURDOCHprogress
03/07/2023HVAC-R and service water piping design and insulationNicolas Crosettoenergy_progress
03/01/2023Post-installed AnchorsNicolas Crosettospecial
02/15/2023FinalNicolas Crosettoprogress
07/17/2021FinalRichard Wainerprogress
07/17/2021FinalRichard Wainerprogress
07/17/2021FinalRichard Wainerprogress
04/05/2019FinalPaul Perdekprogress
09/05/2018FinalBaris Acarprogress
▾Documents — 635 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch22
09/06/2026M00069542-I1Request digital key ↗
09/06/2026M00076673-I1Request digital key ↗
09/03/2026M00559748-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026M00941400-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00151582-I1Request digital key ↗
▸Applications & Permits125
▸BISPLAN / WORK APPROVAL APPLICATION66
03/12/2024123550665Open ↗
03/06/2024123550665Open ↗
02/28/2024123550665Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION50
08/08/2019123550665Open ↗
08/08/2019123550665Open ↗
08/08/2019123550665Open ↗
Showing 3 of 50 on file for this type
▸BISPLACE OF ASSEMBLY7
03/28/2018122430930Open ↗
03/08/2018122430930Open ↗
01/15/2016122430930Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications148
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION89
10/30/2019123853231Open ↗
10/30/2019123853231Open ↗
09/19/2019123853231Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/06/2026M00069542-I1Open ↗
09/05/2026M00151582-I1Open ↗
09/03/2026M00559749-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/19/2026M00829744-I1Open ↗
09/07/2026M00829744-S2Open ↗
09/02/2026M01196990-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
03/01/2019123853231Open ↗
08/28/2018140797047Open ↗
06/25/2018123550665Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
03/01/2019123853231Open ↗
06/25/2018123550665Open ↗
06/18/2018123550656Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/28/2018140797047Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/28/2018140797047Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/07/2026M00829744-S2Open ↗
08/28/2026M01219741-I1Open ↗
▸Trade Schedules & Equipment46
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
12/26/2018123550665Open ↗
12/10/2018123550665Open ↗
11/14/2018123550656Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
05/06/2024123576512Open ↗
03/01/2017122876682Open ↗
04/22/2016122146098Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
04/06/2017122139024Open ↗
01/27/2017122139024Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
04/06/2017122139024Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
11/30/2018123550665Open ↗
11/19/2018123550665Open ↗
06/25/2018123550665Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/10/2024123550665Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/10/2024123550665Open ↗
▸Safety & Tenant Protection3
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
06/06/2017122139051Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00922656-I1Open ↗
▸Environmental & Asbestos31
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
03/06/2019123853231Open ↗
08/30/2016122876682Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/02/2026M00678366-P1Open ↗
09/02/2026M00678366-I1Open ↗
08/31/2026M00829744-S3Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
06/25/2018123550665Open ↗
06/18/2018123576512Open ↗
06/18/2018123550656Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/07/2024123576512Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/01/2019123853231Open ↗
06/25/2018123550665Open ↗
04/06/2017122139024Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
10/30/2019123853231Open ↗
09/19/2019123853231Open ↗
06/06/2017122139051Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/07/2024123576512Open ↗
04/10/2024123550665Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/10/2024123550665Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/10/2024123550665Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/10/2024123550665Open ↗
04/10/2024123550665Open ↗
03/08/2024123550665Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/28/2019123853231Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
04/10/2024123550665Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/10/2024123550665Open ↗
▸Approvals, Objections & Sign-offs88
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
05/07/2024123576512Open ↗
04/10/2024123550665Open ↗
10/30/2019123853231Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
09/06/2026M00069542-I1Open ↗
09/05/2026M00151582-I1Open ↗
09/03/2026M00559749-I1Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
01/19/2017122430930Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
03/14/2018122139051Open ↗
06/12/2017122139051Open ↗
05/09/2017122139051Open ↗
Showing 3 of 7 on file for this type
▸BISFLAME SPREAD/FIRE LETTER1
01/19/2017122430930Open ↗
▸BISFINAL1
04/10/2024123550665Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT47
10/30/2019123853231Open ↗
09/19/2019123853231Open ↗
03/08/2019123550656Open ↗
Showing 3 of 47 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/15/2023123550665Open ↗
11/15/2023123576512Open ↗
▸Filing & Intake Forms66
▸BISEFILING COVER SHEET28
03/01/2019123853231Open ↗
06/25/2018123550665Open ↗
06/25/2018123550665Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION21
03/27/2019123550665Open ↗
12/24/2018123550665Open ↗
11/14/2018123550656Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM14
10/30/2019123853231Open ↗
09/19/2019123853231Open ↗
08/21/2019140797047Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/28/2018140797047Open ↗
Showing 1 of 3 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
03/01/2019123853231Open ↗
08/30/2016122876682Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWManufacturer's Specifications2
08/21/2026M01219741-S1Open ↗
08/13/2026M01219741-P1Open ↗
▸DOB NOWCalculations2
08/21/2026M01219741-S1Open ↗
08/13/2026M01219741-P1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMAINTENANCE INFORMATION1
04/10/2024123550665Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01219741-I1Open ↗
▸DOB NOWAlternate Plan 11
08/28/2026M00941400-I1Open ↗
▸DOB NOWAlternate Plan 21
08/28/2026M00941400-I1Open ↗
▸DOB NOWAlternate Plan 31
08/28/2026M00941400-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026M00922656-I1Open ↗
▸DOB NOWAlternate Plan 41
08/28/2026M00941400-I1Open ↗