← Back
BuildNYC
Elevator cooperative
Sixteenth Street
55 WEST 16TH STREET · BIN 1015372
💬 Discuss this project
1950Year Built
10Stories
D4Building Class
C6-2AZoning
25,639 sfGross Floor Area
10Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: Sixteenth Street Owners · 2,760 sf lot · 9.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSixteenth Street Owners INC.2p · 3 filings · 9 docs
Floor 7Under Construction15p · 1 filing · 10 docs
Floor 6
Floor 5
Floor 4New suspended ceilings and plumbing fixture demo3p · 2 filings · 20 docs
Floor 3
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shed installation8p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sixteenth St Owners3310/04/2026
16th Street Owners2003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Falcon Associates309/30/2026
Danny Forster & Architecture108/05/2026
Queens107/16/2025
Cribstone Engineering107/02/2025
SW Engineering Company105/29/2025
The Rajiv504/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
L & J Design Group803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNA Plumbing ContractorsPlumbing307/08/2026
Xinos ConstructionScaffold207/08/2026
Mock, JR, PElectrical103/21/2026
Ral-Bar ElectricElectrical103/21/2026
AE ElectricElectrical103/21/2026
Star Electrical ContractorsElectrical103/21/2026
Gild RenovationGeneral Contractor107/08/2026
Highline Construction GRGeneral Contractor109/29/2026
Pro ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Falcon Engineering Co5649109/30/2026
Domani Inspection Service843108/05/2026
Queens Engineering8898107/16/2025
Francisco D. Perez PE3306504/14/2023
Building Lifecycle
All (135)Filed (13)Permit Issued (8)Signed Off (2)Facade (FISP) (16)Violation (60)Inspection (2)Objection (6)Special Inspection (28)
10/15/2026
Objection resolved — Resolved
10/14/2026
Objection raised — Scope
09/30/2026
Filed — Alteration
FILED FOR INTERIOR RENOVATION OF DWELLING UNIT #7 LOCATED ON THE 7TH FLOOR AS PER PLANS .TO INCLUDE REMOVAL OF NON LOAD BEARING INTERIOR PARTITIONS. NEW FINISH, CEILING,LIGHT AND MILL WORK. REPLACEMENT OF WINDOW.NO CHANGES IN USE, EGRESS AND OCCUPANCY
M01423814-S2
09/30/2026
Filed — Alteration
FILED FOR INTERIOR RENOVATION OF DWELLING UNIT #7 LOCATED ON THE 7TH FLOOR AS PER PLANS .TO INCLUDE REMOVAL OF NON LOAD BEARING INTERIOR PARTITIONS. NEW FINISH, CEILING,LIGHT AND MILL WORK. REPLACEMENT OF WINDOW.NO CHANGES IN USE, EGRESS AND OCCUPANCY
M01423814-S3
09/30/2026
Filed — Alteration
FILED FOR INTERIOR RENOVATION OF DWELLING UNIT #7 LOCATED ON THE 7TH FLOOR AS PER PLANS .TO INCLUDE REMOVAL OF NON LOAD BEARING INTERIOR PARTITIONS. NEW FINISH, CEILING,LIGHT AND MILL WORK. REPLACEMENT OF WINDOW.NO CHANGES IN USE, EGRESS AND OCCUPANCY
M01423814-S1
09/28/2026
Permit issued — General Construction
M01423814-I1-GC
09/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/16/2026
Special inspection requirement — Maintenance information
09/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
09/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/16/2026
Special inspection requirement — Ventilation and air distribution system
09/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/31/2026
Objection resolved — Addressed
08/31/2026
Special inspection requirement — Sprinkler Systems
RICHARD HAHN
08/31/2026
Special inspection requirement — Final
08/31/2026
Special inspection requirement — Mechanical Systems
08/28/2026
Objection raised — Scope
08/05/2026
Filed — Alteration
FILED FOR INTERIOR RENOVATION OF DWELLING UNIT #7 LOCATED ON THE 7TH FLOOR AS PER PLANS .TO INCLUDE REMOVAL OF NON LOAD BEARING INTERIOR PARTITIONS. NEW FINISH, CEILING,LIGHT AND MILL WORK. REPLACEMENT OF WINDOW.NO CHANGES IN USE, EGRESS AND OCCUPANCY
M01423814-I1
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/07/2026
Special inspection requirement — Preliminary
07/07/2026
Special inspection requirement — Air barrier - visual inspection
07/07/2026
Special inspection requirement — Fenestration air leakage
07/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/07/2026
Special inspection requirement — Fenestration areas
07/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/07/2026
Special inspection requirement — Post-installed Anchors
06/29/2026
Special inspection requirement — Final
07/16/2025
Filed — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with NYC 2022 building code, Chapter 33. No changes in use, egress or occupancy.
M01253013-I1
07/16/2025
Permit issued — Supported Scaffold
M01253013-I1-SF
07/08/2025
Permit issued — Suspended Scaffold
M01250628-I1-SC
07/03/2025
Filed — Alteration
OUTRIGGER SYSTEM INSTALLATION FOR INSPECTION & FACADE REPAIRS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01250628-I1
07/03/2025
Permit issued — Sidewalk Shed
M01250512-I1-SH
07/02/2025
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01250512-I1
06/17/2025
Objection resolved — Addressed
06/15/2025
Objection raised — Scope
05/29/2025
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01215391-I1
04/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/24/2025
Special inspection requirement — Post-installed Anchors
04/24/2025
Special inspection requirement — Final
Levon Shaginyan
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/25/2023
Signed off — Alteration
M00492325-I1
05/18/2023
Signed off — Alteration
RENOVATE EXISTING KITCHEN, BATHROOM, CREATE A NEW BATHROOM.
M00524878-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2023
Filed — Alteration
RENOVATE EXISTING KITCHEN, BATHROOM, CREATE A NEW BATHROOM.
M00524878-P3
04/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Rajiv Fernandez
04/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANCISCO PEREZ
03/20/2023
Cycle 9 facade report submitted
03/13/2023
Cycle 9 facade report signed — SWARMP
03/07/2023
Cycle 9 facade inspection completed
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR09/28/2026
DOB NOWSupported ScaffoldPermit IssuedXinos Construction07/16/2025
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction07/08/2025
DOB NOWSidewalk ShedPermit IssuedXinos Construction07/03/2025
DOB NOWPlumbingSigned-offDNA Plumbing Contractors01/20/2023
DOB NOWPlumbingSigned-offDNA Plumbing Contractors11/27/2021
DOB NOWPlumbingSigned-offDNA Plumbing Contractors06/11/2021
DOB NOWGeneral ConstructionSigned-offGild Renovation05/18/2021
BISSPISSUEDDemar Plumbing09/09/2025
BISEQISSUEDEverest Scaffolding09/10/2018
BISOTISSUEDJepol Construction02/01/2018
BISEQISSUEDEverest Scaffolding09/29/2017
BISSPISSUEDAJC Sprinkler09/08/2017
BISOTISSUEDJepol Construction06/15/2017
BISOTISSUEDJepol Construction04/19/2017
BISEQISSUEDEverest Scaffolding10/05/2016
BISOTISSUEDPro Concrete Contractors07/24/2015
BISOTISSUEDPro Concrete Contractors04/20/2015
BISOTISSUEDAccura Restoration04/14/2015
BISOTISSUEDAccura Restoration09/12/2013
BISSPISSUEDSafety Fire Sprinkler08/29/2013
BISSPISSUEDAlltype Fire Protection03/08/2013
BISPLISSUEDNaf Pak Plumbing & Heating03/08/2013
BISOTISSUEDAccura Restoration01/14/2013
BISMHISSUEDPine Builders12/31/2012
BISOTISSUEDPine Builders12/04/2012
BISEQISSUEDRockledge Scaffold03/29/2012
BISPLISSUEDNaf Pak Plumbing & Heating11/18/2011
BISSPISSUEDAlltype Fire Protection11/18/2011
BISOTISSUEDE.H. General Contractors11/16/2011
BISMHISSUEDE.H. General Contractors11/16/2011
BISEQISSUEDRockledge Scaffold01/07/2008
BISEQISSUEDRockledge Scaffold12/19/2007
BISEQISSUEDRockledge Scaffold04/12/2007
BISOTISSUEDAlpine Construction & Development02/21/2007
BISEQISSUEDRockledge Scaffold02/02/2007
BISOTISSUEDMulti Construction06/08/2006
BISPLISSUEDAmok02/27/2006
BISOTISSUEDMulti Construction08/04/2005
BISPLISSUEDPaul Soto Plumbing Co03/02/2005
+ 13 more permits on file
1 project · most recent 09/30/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/30/2026Permit IssuedHighline Construction GRHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NA3-U1 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 09/30/2026
FiledStatusContractorScope
09/30/2026———
1 project · most recent 09/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/30/2026——Gas, Water/Sanitary
3 projects · most recent 03/19/2024
General Wiring
FiledStatusContractorScope
03/19/2024CompleteRal-Bar Electric1 meters
12/06/2023CompleteRedline Electric—
01/06/2018CompleteDenmar ElectricGeneral Wiring
2 projects · most recent 07/16/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/16/2025Permit IssuedXinos ConstructionScaffold
07/02/2025Permit IssuedXinos ConstructionSidewalk Shed
1 project · most recent 07/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/03/2025Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/16/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/04/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/16/2026HVAC-R and service water heating equipment—energy_progress
09/16/2026Maintenance information—energy_progress
09/16/2026Duct leakage testing, insulation and design—energy_progress
09/16/2026HVAC-R and service water piping design and insulation—energy_progress
09/16/2026Ventilation and air distribution system—energy_progress
09/16/2026HVAC-R and service water heating system controls—energy_progress
08/31/2026Sprinkler SystemsRICHARD HAHNspecial
08/31/2026Final—progress
08/31/2026Mechanical Systems—special
07/07/2026Fire-Resistant Penetrations and Joints—special
07/07/2026Tenant Protection Plan Compliance—special
07/07/2026Energy Code Compliance Inspections—progress
07/07/2026Fire-Resistance Rated Construction—progress
07/07/2026Preliminary—progress
07/07/2026Air barrier - visual inspection—energy_progress
07/07/2026Fenestration air leakage—energy_progress
07/07/2026Fenestration and door U-factor and product ratings—energy_progress
07/07/2026Fenestration areas—energy_progress
07/07/2026Exterior Insulation and Finish Systems (EIFS)—special
07/07/2026Post-installed Anchors—special
06/29/2026Final—progress
04/24/2025Tenant Protection Plan Compliance—special
04/24/2025Post-installed Anchors—special
04/24/2025FinalLevon Shaginyanprogress
04/11/2023Energy Code Compliance InspectionsRajiv Fernandezprogress
Latest 25 of 28.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00492325-I1Request digital key ↗
08/31/2026M00524878-P3Request digital key ↗
08/31/2026M00524878-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits37
▸BISWORK PERMIT APPLICATION21
09/10/2025122976011Open ↗
09/11/2018140558901Open ↗
02/01/2018122976011Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
10/21/2025122976011Open ↗
08/06/2025122976011Open ↗
05/01/2018122934192Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications43
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
11/21/2018140558901Open ↗
08/29/2018122934192Open ↗
03/31/2017122976011Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/05/2026M01423814-S2Open ↗
10/05/2026M01423814-S3Open ↗
10/05/2026M01423814-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/05/2026M01423814-S3Open ↗
10/05/2026M01423814-S2Open ↗
09/01/2026M00524878-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00524878-P3Open ↗
08/31/2026M00524878-P1Open ↗
08/31/2026M01215391-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/04/2016140558901Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/04/2016140558901Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/04/2012120999633Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/04/2016140558901Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/04/2012120999633Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE5
10/02/2013120769392Open ↗
07/29/2013120769392Open ↗
05/20/2013120769392Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/21/2025122976011Open ↗
06/14/2012120769392Open ↗
08/09/2011120769392Open ↗
▸BISEQUIPMENT USE PERMITS2
07/02/2013120769392Open ↗
07/01/2013120769392Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/27/2017122976011Open ↗
12/23/2016122976011Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
07/01/2013120769392Open ↗
07/02/2013120769392Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
12/23/2016122976011Open ↗
11/22/2016122934192Open ↗
10/04/2016140558901Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
10/05/2026M01423814-S2Open ↗
10/05/2026M01423814-S1Open ↗
09/03/2026M00492325-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
12/23/2016122976011Open ↗
11/22/2016122934192Open ↗
09/19/2014122135705Open ↗
Showing 3 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
09/19/2014122135705Open ↗
07/29/2013121726007Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
08/09/2011120769392Open ↗
10/06/2011120769392Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/04/2012120999633Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
08/29/2018122934192Open ↗
12/23/2016122976011Open ↗
12/19/2016122934192Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/29/2018122934192Open ↗
10/27/2015122135705Open ↗
10/27/2015121365682Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
08/09/2011120769392Open ↗
08/09/2011120769392Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/02/2013120769392Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/04/2016140558901Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00492325-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/04/2016140558901Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/21/2018140558901Open ↗
08/29/2018122934192Open ↗
10/27/2015122135705Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
11/19/2012121365682Open ↗
04/04/2012120999633Open ↗
08/09/2011120769392Open ↗
▸BISSHED LETTER2
09/11/2018140558901Open ↗
09/11/2018140558901Open ↗
▸BISSUPERSEDING LETTER2
09/10/2025122976011Open ↗
09/09/2013120769392Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/02/2017140558901Open ↗
06/19/2017122976011Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
08/29/2018122934192Open ↗
08/29/2018122934192Open ↗
05/01/2018122934192Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET8
12/29/2016122976011Open ↗
11/22/2016122934192Open ↗
09/19/2014122135705Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION7
10/27/2025122976011Open ↗
05/17/2018122934192Open ↗
04/12/2017122976011Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
11/21/2018140558901Open ↗
08/29/2018122934192Open ↗
05/01/2018122934192Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/04/2016140558901Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01250628-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01250628-I1Open ↗