← Back
Office with commercial, 7-19 stories
55 WEST 47 STREET
MANHATTAN · BIN 1034472
💬 Discuss this project
1963Year Built
13Stories
O6Building Class
C6-4.5Zoning
76,380 sfGross Floor Area
210Units
LL97 CoveredRent Stabilized3 Open Violations 1 unresolved · 2 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: REAL EVERGREEN INTERNATIONAL, INC. · 8,803 sf lot · 8.68 FAR built · Flood zone X
Locations of Work
Structural
Floor 21p · 1 filing · 13 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REAL EVERGREEN INTERNATIONAL, INC.203/22/2026
WO YEE HING REALTY903/22/2026
49-47 ASSOCIATES403/22/2026
WESTERN MANAGEMENT CORP403/22/2026
MANAGEMENT OFFICE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE603/21/2026
PROJECT ENTRY103/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST STAR CONSTRUCTION *General Contractor204/09/2026
PALUMBO, LAWRENCEElectrical203/21/2026
DEAVER, WILLIAMElectrical203/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor104/09/2026
SING CONSTRUCTION, INCGeneral Contractor107/08/2026
URBAN D.C. INCGeneral Contractor104/09/2026
HUSAIN, OSMANElectrical103/21/2026
ISOLANO, JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DANIEL R. WACKS, P.E., P.2333111/13/2025
M-CON ENGINEERING7341304/09/2025
ALLEN SHINFELD, P.E. PLLC1305102/21/2024
Building Lifecycle
All (77)Filed (6)Permit Issued (5)Signed Off (4)Facade (FISP) (15)Violation (47)
05/04/2026
Signed off — Alteration
MINOR RENOVATION ON 2ND FLOOR FOR EXISTING OFFICE.INSTALL NEW HVAC SYSTEM ON 2ND FLOOR .NO CHANGE IN USE,EGRESS,OCCUPANCY AND BULK
M01172517-I1
02/27/2026
Permit issued — Mechanical Systems
M01172517-I1-MS
12/24/2025
Signed off — Alteration
M01263316-I1
12/15/2025
Signed off — Alteration
Facade Repairs to comply with FISP Local Law 11/98 as shown in the drawings.
M01296861-I1
11/17/2025
Permit issued — General Construction
M01296861-I1-GC-CX
11/13/2025
Filed — Alteration
Facade Repairs to comply with FISP Local Law 11/98 as shown in the drawings.
M01296861-I1
09/04/2025
Permit issued — General Construction
M01172517-I1-GC
08/01/2025
Permit issued — Sidewalk Shed
M01263316-I1-SH
07/31/2025
Filed — Alteration
M01263316-I1
04/09/2025
Filed — Alteration
REPLACE ONE HVAC UNIT ON 2ND FLOOR ROOF,NO CHANGE IN USE,EGRESS,OCCUPANCY AND BULK
M01207622-I1
04/09/2025
Filed — Alteration
REPLACE ONE HVAC UNIT ON 2ND FLOOR ROOF,NO CHANGE IN USE,EGRESS,OCCUPANCY AND BULK
M01201452-I1
03/26/2025
Filed — Alteration
MINOR RENOVATION ON 2ND FLOOR FOR EXISTING OFFICE.INSTALL NEW HVAC SYSTEM ON 2ND FLOOR .NO CHANGE IN USE,EGRESS,OCCUPANCY AND BULK
M01172517-I1
05/21/2024
Signed off — Alteration
replace one electrical HVAC unit on 2nd floor roof as per plans , obtain equipment use permit , no change in use,egress or occupancy
M01005739-I1
05/03/2024
Cycle 9 facade report signed — SWARMP
04/29/2024
Cycle 9 facade inspection completed
02/27/2024
Permit issued — Mechanical Systems
M01005739-I1-MS
02/21/2024
Filed — Alteration
replace one electrical HVAC unit on 2nd floor roof as per plans , obtain equipment use permit , no change in use,egress or occupancy
M01005739-I1
01/31/2024
Cycle 9 facade report submitted
04/21/2023
Violation issued (ECB, closed)
Construction
11/03/2022
Violation issued (HPD, closed)
I
12/17/2021
Violation issued (ECB, open)
Construction
04/20/2021
Violation issued (ECB, open)
Construction
04/21/2020
Violation issued (ECB, closed)
Construction
12/16/2019
Violation issued (ECB, closed)
Construction
09/03/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2018
Cycle 8 facade report submitted
07/13/2018
Cycle 8 facade report signed — SWARMP
07/06/2018
Cycle 8 facade inspection completed
09/21/2017
Cycle 8 facade report submitted
09/21/2017
Cycle 8 facade report signed — UNSAFE
09/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2017
Cycle 8 facade inspection completed
06/29/2017
Violation issued (HPD, closed)
A
06/29/2017
Violation issued (HPD, closed)
A
06/29/2017
Violation issued (HPD, closed)
A
06/29/2017
Violation issued (HPD, closed)
C
06/29/2017
Violation issued (HPD, closed)
A
09/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/02/2015
Violation issued (HPD, closed)
I
06/08/2015
Violation issued (HPD, closed)
C
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2014
Violation issued (HPD, closed)
B
02/27/2014
Violation issued (HPD, closed)
B
09/24/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/24/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/10/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/10/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/30/2010
Cycle 6 facade report submitted
09/30/2010
Cycle 7 facade report submitted
09/23/2010
Cycle 6 facade report signed — SAFE
09/23/2010
Cycle 7 facade report signed — SAFE
09/22/2010
Cycle 6 facade inspection completed
09/22/2010
Cycle 7 facade inspection completed
06/02/2010
Violation issued (ECB, closed)
Construction
08/10/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/10/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2009
Violation issued (ECB, closed)
Construction
12/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFIRST STAR CONSTRUCTION *02/27/2026
DOB NOWGeneral ConstructionSigned-offURBAN D.C. INC11/17/2025
DOB NOWGeneral ConstructionSigned-offFIRST STAR CONSTRUCTION *09/04/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/01/2025
DOB NOWMechanical SystemsSigned-offSING CONSTRUCTION02/27/2024
BISSPISSUEDAAA TOTAL PLUMBING INC07/05/2023
BISSPISSUEDAAA TOTAL PLUMBING INC02/17/2022
BISSPISSUEDAAA TOTAL PLUMBING INC12/04/2020
BISSPISSUEDAAA TOTAL PLUMBING INC11/19/2019
BISOTISSUEDURBAN D.C. INC05/29/2018
BISOTISSUEDURBAN D.C. INC03/27/2018
BISOTISSUEDURBAN D.C. INC02/23/2018
BISMHISSUEDKTC DESIGN GROUP INC02/22/2018
BISPLISSUEDROCK E SMALL PLBG&HTG INC11/15/2017
BISMHISSUEDKTC DESIGN GROUP INC11/08/2017
BISEQISSUEDEVEREST SCAFFOLDING INC09/14/2017
BISPLISSUEDTOP DOG PLBG & HTG CORP09/27/2012
BISBLISSUEDTOP DOG PLBG & HTG CORP02/29/2012
BISPLISSUEDCREO MECHANICAL INC10/17/2011
BISOTISSUEDNEW EMPIRE BUILDER CORP10/17/2011
BISPLISSUEDH2O CONCEPT PLBG & HTG CO08/12/2011
BISBLISSUEDH2O CONCEPT PLBG & HTG CO08/11/2010
BISOTISSUEDCHINA PEFECT CONSTR CORP07/30/2010
BISOTISSUEDEMPIRE GEN CONSTRUCTION U04/15/2010
BISEQISSUEDP.J.B. CONTRACTING CORP04/09/2010
BISEQISSUEDMSS CONSTRUCTION CORP04/18/2005
BISOTISSUEDKY CONRACTING CORP03/25/1998
BIS—ISSUEDSOLO CONSTRUCTION CO01/24/1991
BISEQISSUEDHEYDT CONTRACTING CORP11/08/1990
1 project · most recent 04/09/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/09/2025——Heating and Air Conditioning Systems
Heat / Cool
Carrier 48FCFM28A3A5-8W0A0 25 tons · Condensing Unit ×1
1 project · most recent 04/09/2025
Gas
FiledStatusContractorScope
04/09/2025——Gas
6 projects · most recent 09/11/2025
General Wiring
FiledStatusContractorScope
09/11/2025CompleteATMOS ELECTRIC SVCE CORPGeneral Wiring
07/29/2025CompleteBOROWIDE ELECT'L CONTR'S—
05/12/2024Permit IssuedJAM ELECTRICAL CORP—
06/21/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
03/23/2021CancelledLINTECH ELECTRIC, INCGeneral Wiring
12/29/2017CompleteAWESOME ELECTL CONTNG INC1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/12/2025Structural Cold-Formed SteelDANIEL WACKSspecial
11/12/2025Tenant Protection Plan ComplianceDANIEL WACKSspecial
11/12/2025Structural Steel - DetailsDANIEL WACKSspecial
11/07/2025MasonryDANIEL WACKSspecial
10/02/2025FinalDANIEL WACKSprogress
04/01/2025Tenant Protection Plan ComplianceMichelle Contrispecial
03/25/2025HVAC-R and service water heating equipmentMichelle Contrienergy_progress
03/25/2025HVAC-R and service water heating system controlsMichelle Contrienergy_progress
03/25/2025Maintenance informationMichelle Contrienergy_progress
02/06/2025Fire-Resistance Rated ConstructionMichelle Contriprogress
02/06/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
02/06/2025Energy Code Compliance InspectionsMichelle Contriprogress
02/05/2025Tenant Protection Plan ComplianceMichelle Contrispecial
01/27/2025Mechanical SystemsMichelle Contrispecial
01/27/2025FinalHung Pui Hoprogress
02/21/2024HVAC-R and service water heating equipmentALLEN SHINFELDenergy_progress
02/21/2024HVAC-R and service water heating system controlsALLEN SHINFELDenergy_progress
02/21/2024HVAC-R and service water piping design and insulationALLEN SHINFELDenergy_progress
02/21/2024Maintenance informationALLEN SHINFELDenergy_progress
02/20/2024Tenant Protection Plan ComplianceALLEN SHINFELDspecial
02/20/2024Energy Code Compliance InspectionsALLEN SHINFELDprogress
02/14/2024FinalALLEN SHINFELDprogress
02/14/2024Mechanical SystemsALLEN SHINFELDspecial
▾Documents — 195 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026M01005739-I1Request digital key ↗
08/24/2026M01172517-I1Request digital key ↗
08/24/2026M01201452-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
06/26/2023123819029Open ↗
06/02/2023123819029Open ↗
03/29/2022123819029Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION16
11/20/2019123819029Open ↗
02/27/2018123161005Open ↗
02/22/2018140737246Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
06/26/2019123903419Open ↗
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M01005739-I1Open ↗
09/01/2026M01005739-I1Open ↗
08/30/2026M01296861-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M01005739-I1Open ↗
08/30/2026M01296861-I1Open ↗
08/30/2026M01296861-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026M01005739-I1Open ↗
08/24/2026M01172517-I1Open ↗
08/24/2026M01201452-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
11/09/2017123161005Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
02/22/2018140737246Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/22/2018140737246Open ↗
09/12/2017140693658Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/16/2010120322463Open ↗
04/09/2010120314891Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/22/2018140737246Open ↗
09/12/2017140693658Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
09/13/2018123161005Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
03/20/2018122348049Open ↗
03/12/2018122348049Open ↗
▸BISSCHEDULE B - PLUMBING2
07/03/2012120413926Open ↗
10/07/2011120413926Open ↗
▸BISEQUIPMENT USE PERMITS1
11/05/2018123161005Open ↗
▸BISSPRINKLER SYSTEMS1
07/19/2023123819029Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
08/04/2023123819029Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/05/2018123161005Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
07/03/2019123819029Open ↗
06/26/2019123903419Open ↗
11/09/2017123161005Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M01005739-I1Open ↗
08/24/2026M01201452-I1Open ↗
08/13/2026M01207622-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
02/22/2018140737246Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/19/2015122348049Open ↗
04/09/2010120314891Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/16/2010120322463Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/26/2019123903419Open ↗
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
Showing 3 of 7 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/12/2017140693658Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/05/2018123161005Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/14/2023123819029Open ↗
02/22/2018140737246Open ↗
09/12/2017140693658Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/19/2023123819029Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
08/04/2023123819029Open ↗
11/29/2018140737246Open ↗
11/05/2018123161005Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/25/2019123819029Open ↗
12/16/2013120413926Open ↗
10/11/2012120413926Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/16/2010120322463Open ↗
04/09/2010120314891Open ↗
▸BISFINAL1
07/19/2023123819029Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
11/29/2018140737246Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/26/2023123819029Open ↗
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET6
06/26/2019123903419Open ↗
06/25/2019123819029Open ↗
11/09/2017123161005Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM6
11/29/2018140737246Open ↗
11/05/2018123161005Open ↗
09/20/2018140693658Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
06/26/2023123819029Open ↗
02/04/2022123819029Open ↗
11/05/2018123161005Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/22/2018140737246Open ↗
09/12/2017140693658Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Exempt1
09/07/2010120322463Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/26/2010120314891Open ↗
▸BISFEMA FORM (81-65): DRY FLOOD-PROOFING CERTIFICATE1
06/25/2019123819029Open ↗