← Back
Two family brick
550 61 STREET
BROOKLYN · Sunset Park (Central) · BIN 3143789
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6BZoning
2,000 sfGross Floor Area
2Units
11 Open Violations 9 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Cellar2p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LXC CONSTRUCTION INC. C/O103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC404/22/2024
BASSIRI402/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WING JAY CONSTRUCTION INCGeneral Contractor707/08/2026
LXC CONSTRUCTION INCGeneral Contractor603/21/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010304/22/2024
Building Lifecycle
All (54)Filed (8)Permit Issued (9)Signed Off (4)Violation (14)Inspection (8)Objection (6)Special Inspection (5)
03/04/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/08/2025
Violation issued (ECB, open)
Construction
09/08/2025
Violation issued (ECB, open)
Construction
09/08/2025
Violation issued (ECB, open)
Construction
08/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2024
Signed off — Alteration
INSTALL RETAINING WALL ON OPEN SPACE (REAR YARD).AS PER PLAN, NO CHANGES OF USE, EGRESS, OR OCCUPANCY
B01025469-I1
10/28/2024
Permit issued — General Construction
B01025469-I1-ST
10/28/2024
Permit issued — Structural
B01025469-I1-FO
10/09/2024
Signed off — Alteration
REMOVING SOIL TO REMEDIATE WORK FOR NEW RETAINING WALL ON OPEN SPACE(REAR YARD).
B00987569-I1
09/10/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/26/2024
Permit issued — Construction Fence
B00984856-I1-FN
04/25/2024
Violation issued (ECB, open)
Construction
04/23/2024
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
04/23/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
XIUCHENG LI
04/23/2024
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
04/23/2024
Special inspection requirement — Final
XIUCHENG LI
04/23/2024
Special inspection requirement — Footing and Foundation
XIUCHENG LI
04/22/2024
Filed — Alteration
INSTALL RETAINING WALL ON OPEN SPACE (REAR YARD).AS PER PLAN, NO CHANGES OF USE, EGRESS, OR OCCUPANCY
B01025469-P1
04/01/2024
Permit issued — Structural
B01025469-I1-GC
03/25/2024
Filed — Alteration
INSTALL RETAINING WALL ON OPEN SPACE (REAR YARD).AS PER PLAN, NO CHANGES OF USE, EGRESS, OR OCCUPANCY
B01025469-I1
03/22/2024
Permit issued — Earth Work
B00987569-I1-EA
03/22/2024
Permit issued — Construction Fence
B00984856-I1-FN
02/27/2024
Signed off — Alteration
REMOVE DOB VIOLATION: 102323C23-02968 & 102323C23-02969; REMOVE ILLEGAL PARTITION WALL & DOORS AND RESTORE BACK TO LEGAL CONDITION AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00957443-I1
02/27/2024
Signed off — Alteration
REMOVE DOB VIOLATION: 102323C23-02968 & 102323C23-02969; REMOVE KITCHEN AND 3-PC BATHROOM ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00957452-I1
02/27/2024
Objection resolved — Addressed
02/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/15/2024
Filed — Alteration
REMOVE DOB VIOLATION: 102323C23-02968 & 102323C23-02969; REMOVE KITCHEN AND 3-PC BATHROOM ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00957452-P1
01/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2024
Objection resolved — Addressed
01/16/2024
Permit issued — Construction Fence
B00984856-I1-FN
01/12/2024
Objection resolved — Addressed
01/11/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/11/2024
Objection raised — Inspections
01/11/2024
Objection raised — Scope
01/11/2024
Objection raised — Scope
01/10/2024
Filed — Alteration
REMOVING SOIL TO REMEDIATE WORK FOR NEW RETAINING WALL ON OPEN SPACE(REAR YARD).
B00987569-I1
01/04/2024
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE WORK IN CONJUNCTION WITH DOB NOW GENERAL CONSTRUCTION APPLICATION #B00943305.
B00984856-I1
12/27/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2023
Filed — Alteration
REMOVE DOB VIOLATION: 102323C23-02968 & 102323C23-02969; REMOVE ILLEGAL PARTITION WALL & DOORS AND RESTORE BACK TO LEGAL CONDITION AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00957443-P1
12/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2023
Permit issued — Plumbing
B00957452-I1-PL
11/16/2023
Permit issued — General Construction
B00957443-I1-GC
11/07/2023
Filed — Alteration
REMOVE DOB VIOLATION: 102323C23-02968 & 102323C23-02969; REMOVE ILLEGAL PARTITION WALL & DOORS AND RESTORE BACK TO LEGAL CONDITION AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00957443-I1
11/07/2023
Filed — Alteration
REMOVE DOB VIOLATION: 102323C23-02968 & 102323C23-02969; REMOVE KITCHEN AND 3-PC BATHROOM ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00957452-I1
10/24/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/24/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/29/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/29/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWING JAY CONSTRUCTION INC10/28/2024
DOB NOWStructuralPermit IssuedWING JAY CONSTRUCTION INC10/28/2024
DOB NOWConstruction FencePermit IssuedWING JAY CONSTRUCTION INC04/26/2024
DOB NOWStructuralPermit IssuedWING JAY CONSTRUCTION INC04/01/2024
DOB NOWEarth WorkSigned-offLXC CONSTRUCTION INC03/22/2024
DOB NOWConstruction FencePermit IssuedLXC CONSTRUCTION INC03/22/2024
DOB NOWConstruction FencePermit IssuedWING JAY CONSTRUCTION INC01/16/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/04/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC11/16/2023
2 projects · most recent 11/22/2023
General Wiring
FiledStatusContractorScope
11/22/2023CompleteKJK ELECTRIC INC2 meters
11/16/2023CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 04/22/2024
Concrete
FiledStatusContractorScope
04/22/2024Permit IssuedWING JAY CONSTRUCTION INCConcrete
1 project · most recent 01/04/2024
Fence
FiledStatusContractorScope
01/04/2024Permit IssuedWING JAY CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/10/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/23/2024Concrete - Cast-In-PlaceXIUCHENG LIspecial
04/23/2024Subsurface Conditions – Fill Placement & In-Place DensityXIUCHENG LIspecial
04/23/2024Subgrade InspectionsXIUCHENG LIspecial
04/23/2024FinalXIUCHENG LIprogress
04/23/2024Footing and FoundationXIUCHENG LIprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00957452-I1Request digital key ↗
08/26/2026B00957452-P1Request digital key ↗
08/26/2026B00957443-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00957452-I1Open ↗
08/26/2026B00957443-P1Open ↗
08/26/2026B00957443-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01025469-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01025469-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00987569-I1Open ↗