550 7TH AVENUE
MANHATTAN · BIN 1014501
💬 Discuss this project
1924Year Built
23Stories
O4Building Class
M1-9A/R12Zoning
225,981 sfGross Floor Area
30Units
LL97 Covered0 Active Violations 11 likely answered 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: 550 Adler Realty RL · 9,875 sf lot · 22.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsThe Adler Group1 filing
RoofThe Adler Group4p · 2 filings · 6 docs
BulkheadBetamax material hoist installation1p · 1 filing · 3 docs
Floor 26The Adler Group1 filing
Floor 25The Adler Group9p · 2 filings · 20 docs
Floor 24The Adler Group1 filing · 20 docs
Floor 23
Floor 22The Adler Group1 filing · 4 docs
Floor 21Heavy Duty Pipe Scaffold1p · 1 filing · 6 docs
Floor 20The Adler Group6p · 4 filings · 12 docs
Floor 19Adler Holdings Ii, LLC1p · 4 filings · 6 docs
Floor 182253 Apparel GroupUnder Construction10p · 2 filings · 11 docs
Floor 17The Adler Group1 filing · 5 docs
Floor 16
Floor 151 filing · 5 docs
Floor 14The Adler Group9p · 5 filings · 19 docs
Floor 13
Floor 12BSO Seventh Avenue3p · 5 filings · 6 docs
Floor 11The Adler Group4p · 5 filings · 6 docs
Floor 10
Floor 9WeWork4p · 4 filings · 6 docs
Floor 8WeWork4p · 4 filings · 6 docs
Floor 7The Adler Group6p · 3 filings · 6 docs
Floor 6Open Work ShowroomsUnder Construction2p · 7 filings · 20 docs
Floor 5Adler Holdings Ii, LLCUnder Construction1p · 2 filings · 10 docs
Floor 4Adler Holdings Ii, LLCUnder Construction1p · 4 filings · 20 docs
Floor 3
Floor 2RDG Global4p · 4 filings · 8 docs
Floor 1Bank of America8 filings · 6 docs
CellarThe Adler Group2 filings · 20 docs
BasementThe Adler Group1p · 2 filings · 20 docs
Site & exteriorBank of America19 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Adler Holdings41803/21/2026
The Adler Group35610/20/2026
654 Madison Ave Assco5107/08/2026
Adler Group Realty 5501203/21/2026
Nova503/22/2026
Adler403/21/2026
550 Adler Realty RL103/22/2026
HSBC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kazam Consultants4003/21/2026
KM Associates of New York2903/21/2026
Codegreen1403/21/2026
Studio DB603/21/2026
Direct Access Expediting1003/21/2026
EA Design Group2403/21/2026
AE Design Solution403/21/2026
Rock Arch Engineering203/21/2026
Boyd Consulting403/21/2026
Project Expediters Consulting Co203/21/2026
K & M Associates2903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Interior Building ServiceGeneral Contractor2308/27/2026
National MaintenanceSign hanger2007/08/2026
Premier SanitationGeneral Contractor1007/08/2026
West New York Restoration of CTScaffold907/08/2026
Nova Construction ServiceScaffold903/21/2026
Spring ScaffoldingScaffold807/08/2026
Grushinsky Pipng & HeatingFire Protection707/08/2026
Full Circle PlumbingPlumbing707/08/2026
Jeffrey Vulpis PlumbingPlumbing710/04/2026
Construction BrooklynGeneral Contractor409/01/2026
Triton Construction CoGeneral Contractor407/08/2026
One Ten GroupScaffold407/08/2026
Jer ElectricElectrical403/21/2026
Platinum General ServicesGeneral Contractor303/21/2026
Ariel ConsultantsGeneral Contractor303/21/2026
Alklem PlumbingPlumbing307/08/2026
PFL MechanicalPlumbing307/08/2026
Alef Electrical ContractingElectrical203/21/2026
West New York Restoration of CTspecialty_contractor207/08/2026
Demar MechanicalPlumbing208/26/2026
Copper PlumbingPlumbing107/08/2026
Vulpis & Vulpis PlumbingFire Protection107/08/2026
Demar PlumbingFire Protection107/08/2026
AmokFire Protection107/08/2026
Par Plumbing Co., Inc.oFire Protection103/21/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Allstate Electrical ContElectrical103/21/2026
Ariana ContractingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Marcy Engineering9601110/19/2026
Jack Green Associates4222104/14/2026
Christian L. Martos Engineering5965103/04/2026
Studio DB7533302/25/2026
Collectif Engineering, PL7799202/25/2026
Special Testing & Consulting1688411/02/2023
Chen Engineering Services1826211/30/2022
AK Engineering678306/13/2022
Robert F. Germain Jr. PE5100605/11/2022
Building Lifecycle
All (300)Filed (73)Permit Issued (74)Signed Off (46)Facade (FISP) (12)Violation (25)Inspection (36)Objection (4)Special Inspection (30)
10/19/2026
Filed — Alteration
Replace existing 7.5-ton AC unit serving the elevator machine room with three 3-ton ductless split systems.
M01470310-I1
10/15/2026
Special inspection requirement — Maintenance information
Jacob Stone
10/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacob Stone
10/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacob Stone
10/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Jacob Stone
10/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jacob Stone
10/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jacob Stone
10/06/2026
Special inspection requirement — Final
Jacob Stone
10/06/2026
Special inspection requirement — Mechanical Systems
Jacob Stone
09/25/2026
Signed off — Alteration
Widening of existing exterior door opening at 24th floor set back penthouse level. No Change to use, egress or occupancy.
M01336377-S1
09/01/2026
Signed off — Alteration
Mechanical work elated to interior renovations as shown herewith on drawings. No change to use, egress, or occupancy.
M01341310-S1
08/31/2026
Permit issued — Mechanical Systems
M01336377-S1-MS
08/26/2026
Permit issued — Mechanical Systems
M01341310-S1-MS
08/13/2026
Signed off — Alteration
Construction work related as shown herewith on drawings. No change in use, occupancy or egress.
M01386620-I1
06/03/2026
Permit issued — General Construction
M00652278-I1-GC
04/28/2026
Permit issued — General Construction
M01386620-I1-GC
04/24/2026
Permit issued — Sprinklers
M01341310-S2-EW-SP
04/21/2026
Filed — Alteration
Construction work related as shown herewith on drawings. No change in use, occupancy or egress.
M01386620-I1
04/14/2026
Filed — Alteration
Mechanical work elated to interior renovations as shown herewith on drawings. No change to use, egress, or occupancy.
M01341310-S1
04/14/2026
Filed — Alteration
Mechanical work elated to interior renovations as shown herewith on drawings. No change to use, egress, or occupancy.
M01341310-S2
04/13/2026
Special inspection requirement — Final
Nicholas Tjartjalis
03/04/2026
Filed — Alteration
Widening of existing exterior door opening at 24th floor set back penthouse level. No Change to use, egress or occupancy.
M01336377-S3
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAMIAN ZUNINO
03/04/2026
Special inspection requirement — Final
DAMIAN ZUNINO
03/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
DAMIAN ZUNINO
03/02/2026
Signed off — Alteration
General construction related to interior partitions and installation of doors and frames as shown herewith on drawings. No change to use, egress, or occupancy.
M01294819-I1
03/02/2026
Signed off — Alteration
Office modifications to the 8th and 9th floors
M00623667-I1
02/25/2026
Filed — Alteration
Widening of existing exterior door opening at 24th floor set back penthouse level. No Change to use, egress or occupancy.
M01336377-S1
02/25/2026
Filed — Alteration
Widening of existing exterior door opening at 24th floor set back penthouse level. No Change to use, egress or occupancy.
M01336377-S2
02/24/2026
Filed — Alteration
Widening of existing exterior door opening at 24th floor set back penthouse level. No Change to use, egress or occupancy.
M01336377-P1
02/18/2026
Special inspection requirement — Post-installed Anchors
Christian Martos
02/18/2026
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
02/18/2026
Special inspection requirement — Structural Steel - Details
Christian Martos
02/18/2026
Special inspection requirement — Structural Steel - Welding
Christian Martos
02/18/2026
Special inspection requirement — Masonry
Christian Martos
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
02/18/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Christian Martos
02/04/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/23/2026
Permit issued — General Construction
M01336377-I1-GC
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/22/2026
Special inspection requirement — Final
Christian Martos
01/22/2026
Special inspection requirement — Final
DAMIAN ZUNINO
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAMIAN ZUNINO
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
DAMIAN ZUNINO
01/21/2026
Permit issued — Sprinklers
M01327407-I1-EW-SP
01/20/2026
Permit issued — Plumbing
M01341310-I1-PL
01/20/2026
Permit issued — Plumbing
M01327407-I1-PL
01/09/2026
Filed — Alteration
Modifications to the existing plumbing and sprinkler systems on the 4th floor. No change to use, egress, or occupancy.
M01327407-I1
01/09/2026
Filed — Alteration
Additions/Modifications to existing mechanical system as per plans herewith. No change to use, egress, or occupancy.
M01122784-P1
01/09/2026
Permit issued — General Construction
M01336377-I1-GC
01/08/2026
Filed — Alteration
Mechanical work elated to interior renovations as shown herewith on drawings. No change to use, egress, or occupancy.
M01341310-I1
01/08/2026
Special inspection requirement — Mechanical Systems
RAFAEL FIGUEROA
01/08/2026
Special inspection requirement — Final
RAFAEL FIGUEROA
01/05/2026
Filed — Alteration
Widening of existing exterior door opening at 24th floor set back penthouse level. No Change to use, egress or occupancy.
M01336377-I1
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
12/02/2025
Special inspection requirement — Mechanical Systems
JACK GREEN
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offConstruction Brooklyn08/31/2026
DOB NOWMechanical SystemsSigned-offInterior Building Service08/26/2026
DOB NOWGeneral ConstructionPermit IssuedPremier Sanitation06/03/2026
DOB NOWGeneral ConstructionSigned-offInterior Building Service04/28/2026
DOB NOWSprinklersPermit IssuedGrushinsky Pipng & Heating04/24/2026
DOB NOWGeneral ConstructionSigned-offConstruction Brooklyn01/23/2026
DOB NOWSprinklersPermit IssuedVulpis & Vulpis Plumbing01/21/2026
DOB NOWPlumbingSigned-offJeffrey Vulpis Plumbing01/20/2026
DOB NOWPlumbingSigned-offJeffrey Vulpis Plumbing01/20/2026
DOB NOWGeneral ConstructionSigned-offPremier Sanitation01/09/2026
DOB NOWGeneral ConstructionSigned-offInterior Building Service10/21/2025
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating08/26/2025
DOB NOWMechanical SystemsPermit IssuedInterior Building Service05/27/2025
DOB NOWMechanical SystemsPermit IssuedInterior Building Service04/10/2025
DOB NOWPlumbingSigned-offPFL Mechanical01/24/2025
DOB NOWGeneral ConstructionSigned-offInterior Building Service12/13/2024
DOB NOWPlumbingSigned-offPFL Mechanical11/06/2024
DOB NOWGeneral ConstructionSigned-offInterior Building Service10/23/2024
DOB NOWPlumbingPermit IssuedACS Environmental & Construction08/13/2024
DOB NOWGeneral ConstructionPermit IssuedPremier Sanitation06/04/2024
DOB NOWGeneral ConstructionSigned-offInterior Building Service04/12/2024
DOB NOWGeneral ConstructionSigned-offPlatinum General Services12/14/2023
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction04/03/2023
DOB NOWGeneral ConstructionPermit IssuedPremier Sanitation03/29/2023
DOB NOWSprinklersSigned-offAmok01/13/2023
DOB NOWSprinklersSigned-offAriana Contracting01/04/2023
DOB NOWPlumbingPermit IssuedFull Circle Plumbing12/14/2022
DOB NOWMechanical SystemsSigned-offTriton Construction Co11/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offA. Peter Luger Construction09/27/2022
DOB NOWPlumbingPermit IssuedCopper Mechanical07/27/2022
DOB NOWGeneral ConstructionSigned-offA. Peter Luger Construction07/26/2022
DOB NOWGeneral ConstructionPermit IssuedPremier Sanitation06/24/2022
DOB NOWGeneral ConstructionSigned-offInterior Building Service06/23/2022
DOB NOWPlumbingSigned-offJeffrey Vulpis Plumbing06/21/2022
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating06/16/2022
DOB NOWMechanical SystemsSigned-offInterior Building Service06/13/2022
DOB NOWSprinklersSigned-offDemar Plumbing06/08/2022
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction06/02/2022
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating05/27/2022
DOB NOWMechanical SystemsSigned-offInterior Building Service05/25/2022
+ 60 more permits on file
4 projects · most recent 10/19/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/19/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXV36AVJU9 34,400 BTU · Heat Pump Outdoor ×3
04/14/2026Signed-offInterior Building ServiceHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Heat Controller MCR060AK C30COPS 60,000 BTU · Wshp ×1
MCR060AK C30COPS 60,000 BTU · Wshp ×1
Sigma SDSV-C.11802S2DS 185,000 BTU · Wshp ×1
Ventilation
Greenheck CSP-A700 450 CFM · Exhaust Fan ×1
SP-B150 50 CFM · Exhaust Fan ×1
03/04/2026Signed-offConstruction BrooklynHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
01/09/2026Permit IssuedInterior Building ServiceAir Conditioning Systems, Heating Systems
Cooling
Comfort Aire HBH-060 58,800 BTU · Wshp ×12
Heating
Comfort Aire HBH-060 71,000 BTU · Wshp ×10
1 project · most recent 04/14/2026
FiledStatusContractorScope
04/14/2026Permit IssuedGrushinsky Pipng & Heating108 heads
3 projects · most recent 04/14/2026
Water/Sanitary
FiledStatusContractorScope
04/14/2026Signed-offJeffrey Vulpis PlumbingWater/Sanitary
06/13/2022Signed-offJeffrey Vulpis PlumbingWater/Sanitary
01/19/2021Permit IssuedFull Circle PlumbingWater/Sanitary
16 projects · most recent 08/04/2026
General Wiring Lighting Boiler Controls HVAC Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedCentennial Elevator IndustriesGeneral Wiring
02/16/2026CompleteGlendale Electl Contng—
01/22/2026Permit IssuedJer ElectricGeneral Wiring, Lighting
01/12/2023CompleteMaximum ElectricBoiler Controls
06/08/2022CompleteDelco ElectricalGeneral Wiring
05/09/2022CompleteJer ElectricGeneral Wiring
04/14/2022Permit IssuedCitywide Electrical WiringGeneral Wiring
09/09/2021CompleteLaredo ElectricGeneral Wiring
08/12/2021Permit IssuedCitywide Electrical WiringGeneral Wiring
04/16/2021CompleteNash Electric Services—
04/29/2020CompleteE-J Electric Installation CoGeneral Wiring
03/05/2020Permit IssuedJer ElectricHVAC Wiring
02/18/2020Permit IssuedJer ElectricGeneral Wiring, Lighting
02/18/2020Permit IssuedJer ElectricGeneral Wiring, Lighting
01/20/2020Permit IssuedCitywide Electrical WiringGeneral Wiring
1 project · most recent 03/04/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
03/04/2026Signed-offConstruction BrooklynSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 36
DateTypeResultReport
02/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/13/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 36.
▾Special Inspection Requirements (DOB NOW) — 124
DateRequirementInspectorRole
10/15/2026Fire-Resistant Penetrations and JointsJacob Stonespecial
10/15/2026HVAC-R and service water piping design and insulationJacob Stoneenergy_progress
10/15/2026Maintenance informationJacob Stoneenergy_progress
10/15/2026HVAC-R and service water heating system controlsJacob Stoneenergy_progress
10/15/2026HVAC-R and service water heating equipmentJacob Stoneenergy_progress
10/15/2026Energy Code Compliance InspectionsJacob Stoneprogress
10/06/2026FinalJacob Stoneprogress
10/06/2026Mechanical SystemsJacob Stonespecial
04/13/2026FinalNicholas Tjartjalisprogress
03/04/2026FinalDAMIAN ZUNINOprogress
03/04/2026Fire-Resistance Rated ConstructionDAMIAN ZUNINOprogress
03/04/2026Fire-Resistant Penetrations and JointsDAMIAN ZUNINOspecial
02/18/2026Structural Stability – Alterations of existing buildingsChristian Martosspecial
02/18/2026Structural Steel - High Strength BoltingChristian Martosspecial
02/18/2026Structural Steel - WeldingChristian Martosspecial
02/18/2026Structural Steel - DetailsChristian Martosspecial
02/18/2026MasonryChristian Martosspecial
02/18/2026Concrete - Cast-In-PlaceChristian Martosspecial
02/18/2026Post-installed AnchorsChristian Martosspecial
01/22/2026Fire-Resistance Rated ConstructionDAMIAN ZUNINOprogress
01/22/2026FinalChristian Martosprogress
01/22/2026Fire-Resistant Penetrations and JointsDAMIAN ZUNINOspecial
01/22/2026FinalDAMIAN ZUNINOprogress
01/08/2026FinalRAFAEL FIGUEROAprogress
01/08/2026Mechanical SystemsRAFAEL FIGUEROAspecial
Latest 25 of 124.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
2253 Apparel GroupOfficeFloor 18
Project M01294819 Alteration · LOC Issued · 10/10/2025
Bank of AmericaBank / Financial branchFloor 1
Project M00918893 Alteration · LOC Issued · 12/11/2023
Project M00266745 Alteration · LOC Issued · 11/20/2019
Project M00030411 Alteration · LOC Issued · 05/25/2018
Project M00030381 Alteration · LOC Issued · 05/23/2018
Project M00030383 Alteration · LOC Issued · 05/22/2018
Project M00030399 Alteration · LOC Issued · 05/22/2018
Project M00030404 Alteration · Permit Entire · 05/22/2018
Project M00030409 Alteration · Permit Entire · 05/22/2018
BSO Seventh AvenueOfficeFloor 12
Project M08049425 Alteration · LOC Issued · 12/12/2022
Open Work ShowroomsOfficeFloor 6
Project M00664290 Alteration · LOC Issued · 02/08/2022
Project M00665556 Alteration · LOC Issued · 02/08/2022
RDG GlobalOfficeFloor 2
Project M00468371 Alteration · LOC Issued · 03/15/2021
Project M00468377 Alteration · LOC Issued · 03/15/2021
WeWorkOfficeFloors 8, 9
Project M00285929 Alteration · LOC Issued · 01/02/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,284 on file (BIS + DOB NOW)
▸Plans & Drawings103
▸DOB NOWPlans/Sketch72
10/20/2026M01470310-I1Request digital key ↗
09/06/2026M00001235-I1Request digital key ↗
09/06/2026M00002280-I1Request digital key ↗
Showing 3 of 72 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
09/05/2026M00294704-I1Request digital key ↗
09/04/2026M00362678-P1Request digital key ↗
09/04/2026M00362678-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sign7
09/05/2026M00266736-I1Request digital key ↗
09/05/2026M00266731-I1Request digital key ↗
09/05/2026M00266724-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00290798-I1Request digital key ↗
09/05/2026M00294685-I1Request digital key ↗
09/04/2026M00468371-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00285929-I1Request digital key ↗
09/05/2026M00294744-I1Request digital key ↗
09/04/2026M00468377-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/03/2026M00362689-I1Request digital key ↗
09/03/2026M00362689-P2Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00453166-P1Request digital key ↗
09/04/2026M00469396-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸Applications & Permits325
▸BISPLAN / WORK APPROVAL APPLICATION177
02/02/2026101337313Open ↗
08/06/2025102730840Open ↗
01/25/2024104080236Open ↗
Showing 3 of 177 on file for this type
▸BISWORK PERMIT APPLICATION144
12/10/2020140988091Open ↗
09/04/2020140942041Open ↗
06/29/2020140915730Open ↗
Showing 3 of 144 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications629
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION256
03/18/2020123832610Open ↗
01/24/2020123719976Open ↗
01/24/2020123719976Open ↗
Showing 3 of 256 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature102
10/20/2026M01470310-I1Open ↗
09/06/2026M00006724-I1Open ↗
09/06/2026M00030409-I1Open ↗
Showing 3 of 102 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST81
03/18/2020123832610Open ↗
12/23/2019123725200Open ↗
12/20/2019123848177Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWProgress Inspector Seal & Signature66
10/20/2026M01470310-I1Open ↗
10/20/2026M01470310-I1Open ↗
10/20/2026M01470310-I1Open ↗
Showing 3 of 66 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT62
12/09/2020140988091Open ↗
08/31/2020140942041Open ↗
06/24/2020140915730Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
10/20/2026M01470310-I1Open ↗
10/20/2026M01470310-I1Open ↗
10/07/2026M01336377-S3Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/09/2020140988091Open ↗
08/31/2020140942041Open ↗
06/24/2020140915730Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/09/2020140988091Open ↗
08/31/2020140942041Open ↗
06/24/2020140915730Open ↗
▸Trade Schedules & Equipment159
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISEQUIPMENT USE PERMITS33
10/26/2020123720429Open ↗
10/26/2020123720429Open ↗
10/22/2020123720429Open ↗
Showing 3 of 33 on file for this type
▸BISSELF-CERT PLUMBING NOTICE29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT17
10/26/2020123720429Open ↗
10/22/2020123720429Open ↗
Showing 2 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection82
▸DOB NOWHPD-1: Anti-Harassment Area Checklist63
09/05/2026M00266736-I1Open ↗
09/04/2026M00362678-P1Open ↗
09/04/2026M00362678-P2Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWCertificate of No Harassment6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
03/18/2020123832610Open ↗
Showing 1 of 3 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos196
▸BISASBESTOS: CERTIFICATION (DEP ACP5)83
12/10/2020140988091Open ↗
12/09/2020140988091Open ↗
09/04/2020140942041Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report82
10/20/2026M01470310-I1Open ↗
09/06/2026M00006724-I1Open ↗
09/06/2026M00030409-I1Open ↗
Showing 3 of 82 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/04/2026M00362678-I1Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance158
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS85
03/18/2020123832610Open ↗
12/23/2019123725200Open ↗
12/20/2019123848177Open ↗
Showing 3 of 85 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS48
10/24/2025140988091Open ↗
09/30/2022140915730Open ↗
06/15/2021140988091Open ↗
Showing 3 of 48 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
10/24/2025140988091Open ↗
10/24/2025140988091Open ↗
06/15/2021140988091Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis9
09/03/2026M00656556-I1Open ↗
09/02/2026M00750320-I1Open ↗
09/04/2026M00468377-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/09/2020140988091Open ↗
06/24/2020140915730Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
06/24/2020140915730Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY22
10/24/2025140988091Open ↗
10/24/2025140988091Open ↗
08/08/2025102730840Open ↗
Showing 3 of 22 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBORINGS / TEST PITS (TR-4) 27-7201
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
08/08/2025102730840Open ↗
▸Approvals, Objections & Sign-offs158
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST123
10/24/2025140988091Open ↗
10/14/2022140915730Open ↗
06/15/2021140988091Open ↗
Showing 3 of 123 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSUPERSEDING LETTER2
03/13/2020104596439Open ↗
Showing 1 of 2 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership212
▸BISCOST AFFIDAVIT212
10/24/2025140988091Open ↗
08/07/2025102730840Open ↗
09/30/2022140915730Open ↗
Showing 3 of 212 on file for this type
▸Filing & Intake Forms223
▸BISEFILING COVER SHEET112
03/18/2020123832610Open ↗
12/23/2019123725200Open ↗
12/23/2019123725200Open ↗
Showing 3 of 112 on file for this type
▸BISBOROUGH INTAKE FORM76
01/24/2020123719976Open ↗
01/23/2020104452496Open ↗
01/21/2020123809058Open ↗
Showing 3 of 76 on file for this type
▸BISADDITIONAL INFORMATION31
04/29/2021123848177Open ↗
12/29/2020140988091Open ↗
12/16/2020140988091Open ↗
Showing 3 of 31 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/09/2020140988091Open ↗
08/31/2020140942041Open ↗
06/24/2020140915730Open ↗
Showing 3 of 4 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProof of Historic Building4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLAA - Supporting Documentation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type