← Back
City residence, one family
550 8 STREET
BROOKLYN · BIN 3025952
💬 Discuss this project
1902Year Built
2Stories
A4Building Class
R7BZoning
3,042 sfGross Floor Area
1Units
City residence, one family · 1,830 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING PC103/08/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYOND COOLING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL CITY ENGINEERING PC7115103/08/2024
Building Lifecycle
All (14)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (11)
06/24/2024
Signed off — Alteration
INSTALLATION OF HEAT PUMP HEATING/COOLING SYSTEM FOR THE EXISTING SINGLE-FAMILY BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00988762-I1
03/18/2024
Permit issued — Mechanical Systems
B00988762-I1-MS
03/08/2024
Filed — Alteration
INSTALLATION OF HEAT PUMP HEATING/COOLING SYSTEM FOR THE EXISTING SINGLE-FAMILY BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00988762-I1
02/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
02/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
02/26/2024
Special inspection requirement — Maintenance information
Zhao Deng
02/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
01/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
Zhao Deng
01/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
01/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Zhao Deng
01/11/2024
Special inspection requirement — Heating Systems
Zhao Deng
01/11/2024
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
Zhao Deng
01/10/2024
Special inspection requirement — Final
Zhao Deng
01/10/2024
Special inspection requirement — Mechanical Systems
Zhao Deng
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBEYOND COOLING LLC03/18/2024
BISPLISSUEDPETER PLUMBING ASSOC. INC.01/02/2003
1 project · most recent 03/26/2024
General Wiring
FiledStatusContractorScope
03/26/2024CompleteGOODALL ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
02/26/2024HVAC-R and service water heating equipmentZhao Dengenergy_progress
02/26/2024HVAC-R and service water piping design and insulationZhao Dengenergy_progress
02/26/2024Maintenance informationZhao Dengenergy_progress
02/26/2024HVAC-R and service water heating system controlsZhao Dengenergy_progress
01/11/2024Tenant Protection Plan ComplianceZhao Dengspecial
01/11/2024Fire-Resistant Penetrations and JointsZhao Dengspecial
01/11/2024Energy Code Compliance InspectionsZhao Dengprogress
01/11/2024Heating SystemsZhao Dengspecial
01/11/2024Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsZhao Dengspecial
01/10/2024FinalZhao Dengprogress
01/10/2024Mechanical SystemsZhao Dengspecial
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026B00988762-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026B00988762-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/30/2026B00988762-I1Open ↗
09/01/2026B00988762-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026B00988762-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00988762-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026B00988762-I1Open ↗