← Back
BuildNYC
General warehouse
550 FOOD CENTER DRIVE
BRONX · Hunts Point · BIN 2117759
💬 Discuss this project
2008Year Built
1.5Stories
E1Building Class
M3-1Zoning
145,079 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 2 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
General warehouse · Owner of record: NYC Department of Small Business Services · 462,567 sf lot · 0.31 FAR built · Flood zone X500
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 13 filings
Cellar2 filings
Site & exterior6 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Ecomonic Development1603/21/2026
Nycedc703/21/2026
NYC Department of Small Business Services103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McCarthy Engineering904/25/2024
Ashraf101/18/2022
Michels & Waldron Associates111/02/2021
Wavic Engineering102/04/2021
D'Huy Engineering112/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio203/21/2026
Construction Permit Services2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Structurecraft ContractingGeneral Contractor1807/08/2026
Platinum Services NYScaffold603/21/2026
Jag Plumbing & MechanicalPlumbing507/08/2026
Full Capacity FirePlumbing503/22/2026
Accurate MechanicalFire Protection207/08/2026
Full Capacity FireFire Protection207/08/2026
Fred Geller ElectricalElectrical103/21/2026
Spirelli ElectricElectrical103/22/2026
Jag Plumbing MechanicalGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4231104/25/2024
Wavic Engineering1733102/04/2021
Building Lifecycle
11/19/2025
VC17: failed to obtain and/or produce required certificate of fitness for installation of device, equipment, system; conducting an operation;…
FDNY_NOV violation · closed
11/12/2025
Elevator Category 1 inspection report filed
07/23/2025
VC12: failed to provide required water-based fire protection system. VC20: failed to conduct required (initial/periodic) inspection or test of…
FDNY_NOV violation · closed
05/06/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS, CONSTRUCTION FENCE SHALL COMPLY THE CHAPTER 33 OF NYC BUILDING CODE OF 2014. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00661279-I1
03/04/2025
Boiler inspection report filed
Initial · no defects · Accepted
106 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Structurecraft Contracting—
DOB NOW—Full Capacity Fire—
DOB NOW—Structurecraft Contracting—
DOB NOW—Structurecraft Contracting—
DOB NOW—Jag Plumbing & Mechanical—
DOB NOW—Platinum Services NY—
DOB NOW—Jag Plumbing & Mechanical—
DOB NOW—Full Capacity Fire—
DOB NOW—Structurecraft Contracting—
DOB NOW—Structurecraft Contracting—
DOB NOW—Structurecraft Contracting—
DOB NOW—Platinum Services NY—
DOB NOW—Accurate Mechanical—
DOB NOW—Accurate Mechanical—
DOB NOW—Jag Plumbing & Mechanical—
DOB NOW—Jag Plumbing & Mechanical—
DOB NOW—Structurecraft Contracting—
DOB NOW—Structurecraft Contracting—
BIS—Structurecraft Contracting—
BIS—Structurecraft Contracting—
BIS—Structurecraft Contracting—
BIS—Structurecraft Contracting—
BIS—Structurecraft Contracting—
BIS—DGC Capital Contracting—
BIS—DGC Capital Contracting—
BIS—Pro-Tech Energy Solutions—
BIS—Pro-Tech Energy Solutions—
BIS—North Shore Neon Sign Co—
BIS—Milric Construction—
BIS—Milric Construction—
BIS—Economy P & H Co—
BIS—Milric Construction—
BIS—Economy P & H Co—
BIS—Milric Construction—
BIS—Milric Construction—
BIS—Milric Construction—
Nothing on file for this building.
Nothing on file for this building.
414 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account