Shopping center, with or without parking
550 GATEWAY DRIVE
BROOKLYN · BIN 3398505
💬 Discuss this project
2013Year Built
—Stories
K6Building Class
C4-2Zoning
87,072 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Shopping center, with or without parking · Owner of record: GATEWAY CENTER PROPERTIES PHASE II OWNER , LLC · 66,738 sf lot · 1.3 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 1Under Construction51p · 1 filing · 20 docs
MezzanineUnder Construction55p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GATEWAY CENTER PROPERTIES PHASE II OWNER , LLC2703/22/2026
MARCH ASSOC CONSTS IN103/22/2026
RADIAL POWER DEVELOPMENT, LLC503/21/2026
PC RICHARDS AND SON703/21/2026
SPORTS AUTHORITY403/21/2026
NORDSTROM STORE DESIGN303/21/2026
NORDSTROM103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASSOCIATES2403/21/2026
NEW YORK SIGN CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRENNAN OPERATING INCGeneral Contractor1207/08/2026
A&A PLUMBING CORPPlumbing207/08/2026
SPIRO SINANISElectrical103/21/2026
ADVANCED PLBG, MECH & SPRFire Protection106/27/2026
GOING SIGN SVCNGScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES4221107/17/2026
JOSEPH MARTINES PE, PLLC1428506/03/2026
Building Lifecycle
All (119)Filed (19)Permit Issued (14)Signed Off (7)Violation (2)Inspection (15)Objection (32)Special Inspection (30)
07/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2026
Objection resolved — Resolved
07/30/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/20/2026
Signed off — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-S4
07/17/2026
Filed — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-A3
07/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE GREEN
07/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE GREEN
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE GREEN
07/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE GREEN
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
07/14/2026
Filed — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-A2
07/13/2026
Special inspection requirement — Sprayed fire-resistant materials
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Lowest Floor Elevation
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Fenestration air leakage
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Fenestration areas
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE GREEN
07/13/2026
Special inspection requirement — Air barrier - visual inspection
LAWRENCE GREEN
07/01/2026
Signed off — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-S2
06/30/2026
Permit issued — Mechanical Systems
B01182890-S2-MS
06/30/2026
Permit issued — General Construction
B01182890-I1-GC
06/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2026
Signed off — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-S5
06/25/2026
Signed off — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-S1
06/25/2026
Objection resolved — Addressed
06/17/2026
Special inspection requirement — Designated Seismic System
06/17/2026
Special inspection requirement — Deep Foundation Elements
Nejm Jundi
06/17/2026
Special inspection requirement — Footing and Foundation
JOSEPH MARTINES
06/17/2026
Special inspection requirement — Final
JOSEPH MARTINES
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH MARTINES
06/17/2026
Special inspection requirement — Post-installed Anchors
JOSEPH MARTINES
06/16/2026
Signed off — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-S7
06/15/2026
Permit issued — Structural
B01182890-S7-ST
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Inspections
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Other
06/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2026
Special inspection requirement — Preliminary
JOSEPH MARTINES
06/05/2026
Special inspection requirement — Final
JOSEPH MARTINES
06/05/2026
Special inspection requirement — Masonry
JOSEPH MARTINES
06/05/2026
Special inspection requirement — Designated Seismic System
06/05/2026
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH MARTINES
06/05/2026
Special inspection requirement — Structural Steel - Welding
JOSEPH MARTINES
06/05/2026
Special inspection requirement — Structural Cold-Formed Steel
JOSEPH MARTINES
06/05/2026
Special inspection requirement — Structural Steel - Details
JOSEPH MARTINES
06/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JOSEPH MARTINES
06/03/2026
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01184003-I1
06/03/2026
Filed — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-P4
06/03/2026
Objection resolved — Addressed
06/02/2026
Objection raised — Other
06/02/2026
Objection resolved — Addressed
05/29/2026
Filed — Alteration CO
IT IS PROPOSED TO FILE FOR MECHANICAL WORK FOR NEW TENANT, INCLUDING A COMMERCIAL KITCHEN WITH HOOD AND DUCT EXHAUST SYSTEM ON THE FIRST FLOOR AS SHOWN ON PLANS.
B01182890-P7
05/29/2026
Objection raised — Mechanical
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBRENNAN OPERATING INC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedBRENNAN OPERATING INC06/30/2026
DOB NOWStructuralSigned-offBRENNAN OPERATING INC06/15/2026
DOB NOWGeneral ConstructionPermit IssuedBRENNAN OPERATING02/12/2026
DOB NOWStructuralSigned-offBRENNAN OPERATING01/21/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP12/10/2025
DOB NOWFoundationSigned-offBRENNAN OPERATING08/06/2025
DOB NOWStructuralSigned-offBRENNAN OPERATING08/06/2025
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR07/29/2025
DOB NOWGeneral ConstructionPermit IssuedBRENNAN OPERATING07/15/2025
DOB NOWMechanical SystemsSigned-offBRENNAN OPERATING07/15/2025
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING07/11/2025
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING06/25/2025
DOB NOWSignSigned-offPOLSINELLI, HENRY03/04/2025
BISOTISSUEDACCORD POWER INC08/30/2024
BISOTISSUEDACCORD POWER INC01/24/2024
BISOTISSUEDZ-CAR-D CORP07/20/2016
BIS—ISSUEDINTERBORO SIGN & ELECL MA07/19/2016
BISOTISSUEDZ-CAR-D CORP07/19/2016
BISOTISSUEDZ-CAR-D CORP07/19/2016
BIS—ISSUEDINTERBORO SIGN & ELECL MA07/19/2016
BIS—ISSUEDINTERBORO SIGN & ELECL MA07/19/2016
BISSPISSUEDMANENGEERING BUREAU INC07/11/2016
BISMHISSUEDKENCO DESIGNS INC06/20/2016
BISOTISSUEDKENCO DESIGNS INC06/20/2016
BISOTISSUEDNATIONAL MAINTENANCE INC10/24/2014
BISOTISSUEDNATIONAL MAINTENANCE INC10/24/2014
BIS—ISSUEDNATIONAL MAINTENANCE, INC10/24/2014
BISOTISSUEDNATIONAL MAINTENANCE INC10/24/2014
BISOTISSUEDNATIONAL MAINTENANCE INC10/24/2014
BIS—ISSUEDNATIONAL MAINTENANCE, INC10/24/2014
BISOTISSUEDNATIONAL MAINTENANCE INC10/24/2014
BISOTISSUEDCAPITOL AWNING CO INC10/08/2014
BISSPISSUEDABCO-PEERLESS SPRKLR CORP10/07/2014
BISOTISSUEDBRACKENRIDGE CONST CO INC09/16/2014
BISEQISSUEDMARCH ASSOCIATES CONSTRUCTION09/03/2014
BIS—ISSUEDMARCH ASSOCIATES CONSTRUCTION09/03/2014
BISOTISSUEDT.J. SIGNS UNLIMITED INC08/29/2014
BISOTISSUEDT.J. SIGNS UNLIMITED INC08/29/2014
BISOTISSUEDT.J. SIGNS UNLIMITED INC08/29/2014
+ 21 more permits on file
1 project · most recent 07/17/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026Permit IssuedBRENNAN OPERATING INCAir Conditioning Systems, Heating Systems
Cooling
Lg ARWM288DA55 288,000 BTU · Vrf Outdoor ×2
Heating
Lg ARWM288DA55 324,000 BTU · Vrf Outdoor ×2
1 project · most recent 07/17/2026
Sprinkler System
FiledStatusContractorScope
07/17/2026Signed-offADVANCED PLBG, MECH & SPRSprinkler System
1 project · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026Permit IssuedA&A PLUMBING CORPGas, Water/Sanitary
3 projects · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026Permit IssuedCANNELLA ELECTRIC INC—
10/17/2025Permit IssuedMETROPOLIS ELECTRIC CORPGeneral Wiring
01/14/2025CompletePOWER SURGE ELECTRIC, INC8 meters, 1 new_meters
1 project · most recent 07/17/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/17/2026Permit IssuedBRENNAN OPERATING INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
07/15/2026HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
07/15/2026HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
07/15/2026Energy Code Compliance InspectionsLAWRENCE GREENprogress
07/15/2026Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
07/15/2026HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
07/13/2026Energy Code Compliance InspectionsLAWRENCE GREENprogress
07/13/2026Fire-Resistance Rated ConstructionLAWRENCE GREENprogress
07/13/2026Lowest Floor ElevationLAWRENCE GREENprogress
07/13/2026Fenestration air leakageLAWRENCE GREENenergy_progress
07/13/2026Fenestration areasLAWRENCE GREENenergy_progress
07/13/2026Fenestration and door U-factor and product ratingsLAWRENCE GREENenergy_progress
07/13/2026Air barrier - visual inspectionLAWRENCE GREENenergy_progress
07/13/2026Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
07/13/2026Mastic and Intumescent Fire-resistant CoatingsLAWRENCE GREENspecial
07/13/2026Sprayed fire-resistant materialsLAWRENCE GREENspecial
06/17/2026Footing and FoundationJOSEPH MARTINESprogress
06/17/2026Concrete - Cast-In-PlaceJOSEPH MARTINESspecial
06/17/2026FinalJOSEPH MARTINESprogress
06/17/2026Deep Foundation ElementsNejm Jundispecial
06/17/2026Designated Seismic System—special
06/17/2026Post-installed AnchorsJOSEPH MARTINESspecial
06/05/2026Concrete - Cast-In-PlaceJOSEPH MARTINESspecial
06/05/2026Designated Seismic System—special
06/05/2026FinalJOSEPH MARTINESprogress
06/05/2026PreliminaryJOSEPH MARTINESprogress
Latest 25 of 103.
▾Documents — 610 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch20
08/22/2026B01182890-A3Request digital key ↗
08/22/2026B01184003-I1Request digital key ↗
08/21/2026B01243219-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/21/2026B01241946-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION50
08/28/2023340890735Open ↗
09/22/2016321244578Open ↗
08/03/2016321429156Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION34
01/24/2024340890735Open ↗
07/21/2016321289164Open ↗
07/21/2016321289155Open ↗
Showing 3 of 34 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
10/11/2016321289164Open ↗
10/11/2016321240402Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
10/18/2016321289146Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/20/2016321244578Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/15/2026B01182890-A2Open ↗
08/13/2026B01182890-I1Open ↗
08/13/2026B01182890-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/15/2026B01182890-A2Open ↗
08/13/2026B01182890-I1Open ↗
08/13/2026B01182890-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01182890-P1Open ↗
08/13/2026B01182890-I1Open ↗
08/13/2026B01182890-P2Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/29/2023340890735Open ↗
▸Seals & Professional Certifications183
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION72
12/08/2016321244578Open ↗
10/13/2016321244578Open ↗
10/13/2016321244578Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/02/2026B01182890-P4Open ↗
09/02/2026B01182890-P4Open ↗
09/02/2026B01182890-P4Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/02/2026B01182890-P4Open ↗
09/02/2026B01182890-P4Open ↗
09/01/2026B01182890-S7Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/21/2026B01243219-I1Open ↗
08/16/2026B01182890-S2Open ↗
08/16/2026B01182890-S1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
07/21/2016321289164Open ↗
07/21/2016321289155Open ↗
07/21/2016321289146Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
07/21/2016321289164Open ↗
07/21/2016321289155Open ↗
07/21/2016321289146Open ↗
Showing 3 of 18 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/14/2023340890735Open ↗
▸Trade Schedules & Equipment51
▸BISSELF-CERT PLUMBING NOTICE21
08/12/2015320962785Open ↗
06/10/2015320992324Open ↗
06/10/2015320996106Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
09/22/2016321244578Open ↗
06/17/2016321244578Open ↗
03/18/2015320962785Open ↗
Showing 3 of 12 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
01/05/2017321429156Open ↗
06/12/2015320732230Open ↗
04/02/2015320732230Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
06/10/2015320992324Open ↗
06/10/2015321213432Open ↗
12/17/2014320904134Open ↗
▸BISSIGN HANGER CERTIFICATE2
10/11/2016321240377Open ↗
10/11/2016321240386Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
09/20/2016321244578Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/16/2026B01182890-P1Open ↗
08/16/2026B01182890-P2Open ↗
08/15/2026B01182890-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
06/17/2016321244578Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/24/2024340890735Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
10/13/2016321244578Open ↗
10/13/2016321244578Open ↗
07/21/2016321289164Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/13/2025340890735Open ↗
12/08/2016321244578Open ↗
11/21/2016321240402Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/13/2025340890735Open ↗
08/16/2023340890735Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/28/2023340890735Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
11/14/2025340890735Open ↗
▸Inspections & Test Reports5
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/13/2025340890735Open ↗
08/16/2023340890735Open ↗
▸DOB NOWTR5 Test Report1
08/15/2026B01182890-S5Open ↗
▸Approvals, Objections & Sign-offs80
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
11/14/2025340890735Open ↗
01/05/2017321429156Open ↗
12/08/2016321244578Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS26
07/21/2016321289164Open ↗
07/18/2016321240377Open ↗
07/18/2016321240402Open ↗
Showing 3 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
11/14/2025340890735Open ↗
10/11/2016321289155Open ↗
03/20/2015320935994Open ↗
Showing 3 of 14 on file for this type
▸Cost, Insurance & Ownership67
▸BISCOST AFFIDAVIT67
11/13/2025340890735Open ↗
08/28/2023340890735Open ↗
01/05/2017321429156Open ↗
Showing 3 of 67 on file for this type
▸Filing & Intake Forms42
▸BISEFILING COVER SHEET35
08/03/2016321429156Open ↗
07/21/2016321289146Open ↗
07/21/2016321289164Open ↗
Showing 3 of 35 on file for this type
▸BISADDITIONAL INFORMATION4
01/18/2024340890735Open ↗
08/16/2023340890735Open ↗
05/19/2015320962785Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet3
08/14/2023340890735Open ↗
Showing 1 of 3 on file for this type
▸Other Documents25
▸DOB NOWPlot Diagram6
08/15/2026B01182890-P4Open ↗
08/15/2026B01182890-A2Open ↗
08/13/2026B01182890-S5Open ↗
Showing 3 of 6 on file for this type
▸BISOP-4 - Special Report4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/15/2026B01182890-A2Open ↗
08/13/2026B01182890-P1Open ↗
08/13/2026B01182890-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026B01182890-A2Open ↗
08/13/2026B01182890-P1Open ↗
08/13/2026B01182890-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/16/2026B01182890-P1Open ↗
08/16/2026B01182890-P2Open ↗
08/15/2026B01182890-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
08/28/2023340890735Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/05/2017321429156Open ↗
▸DOB NOWFinal Survey1
08/15/2026B01182890-I1Open ↗