| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/12/2022 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | |
| 09/10/2021 | Permit Issued | STRUCTURE TONE TURNER | Air Conditioning Systems | Cooling Iec ×3 |
| 12/20/2019 | — | — | Air Conditioning Systems | Cooling Mitsubishi Electric PKFY-P18NHMU-E2 18,000 BTU · Vrf Indoor ×75 PUHY-P144TKMU-A 144,000 BTU · Vrf Outdoor ×10 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 02/25/2026 | Signed-off | PAR FIRE PROTECTION LLC | 88 heads |
| 01/30/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 1,346 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 02/25/2026 | — | — | — |
| 01/30/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 09/21/2021 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 12/20/2019 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 03/18/2026 | Complete | FOREST ELECTRIC CORP. | 1 meters |
| 02/24/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 09/24/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 11/29/2023 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 11/28/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 11/28/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 11/28/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 11/28/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 11/28/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 11/28/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 08/21/2023 | Complete | NEAD ELECTRIC INC. | — |
| 08/21/2023 | Complete | NEAD ELECTRIC INC. | — |
| 08/19/2023 | Complete | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 07/19/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2026 | Permit Issued | STRUCTURE TONE, LLC | Steel, Concrete |
| 03/18/2024 | Permit Issued | STRUCTURE TONE, LLC | Concrete |
| 11/10/2023 | Permit Issued | STRUCTURE TONE TURNER | Steel |
| 11/10/2023 | Permit Issued | STRUCTURE TONE TURNER | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/21/2022 | Permit Issued | SAFWAY ATLANTIC, LLC | Fence |
| 12/30/2021 | Permit Issued | PLATFORM SOLUTIONS, INC | Scaffold |
| Owner | Filings | Most Recent |
|---|---|---|
| 181 | 09/13/2026 | |
| OXFORD PROPERTIES GROUP | 15 | 07/08/2026 |
| OXFORD PROPERTIES | 333 | 07/08/2026 |
| SAFWAY ATLANIC,LLC | 118 | 07/08/2026 |
| 550 WASHINGTON OWNER DE LLC C | 60 | 03/22/2026 |
| TURNER CONSTRUCTION | 52 | 03/22/2026 |
| METROPOLITAN WALTERS LLC | 5 | 03/22/2026 |
| FOUR STAR HOLDINGS LLC | 1 | 03/22/2026 |
| BLOOMBERG | 1 | 03/22/2026 |
| TURNER CONSTRUCTION COMPY | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GENSLER | 73 | 08/03/2026 |
| ROBERT DERECTOR ASSOCIATES | 107 | 07/23/2026 |
| GILSANZ MURRAY STEFICEK LLP | 25 | 04/10/2026 |
| COOPER CARRY ARCHITECTS NEW YORK, P | 7 | 12/04/2023 |
| LANGAN ENG, ENV, SURVEY, LARCH, DPC | 5 | 09/14/2023 |
| LEVIN ENGINEERING PLLC | 2 | 03/24/2023 |
| LEON SKVIRSKY PE | 2 | 03/07/2023 |
| PLAN B ENGINEERING | 5 | 12/08/2022 |
| G. BLINN CONSULTING, LLC | 3 | 11/15/2022 |
| SAFWAY ATLANTIC LLC | 19 | 10/21/2022 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 09/23/2022 |
| BRAND ACCESS SOLUTIONS | 1 | 07/13/2022 |
| LANGAN ENGINEERING | 2 | 04/12/2022 |
| ABCO-PEERLESS ENGINEERING, P.C. | 1 | 03/18/2022 |
| GREEN RIVER ENVIRONMENTAL ENGINEERI | 4 | 07/08/2021 |
| MRA ENGINEERING P.C. | 2 | 06/03/2021 |
| TAREK M. ZEID, PE, PLLC | 1 | 05/18/2021 |
| PHILIP HABIB & ASSOCIATES | 4 | 05/03/2021 |
| JAMES H. FAHEY | 1 | 06/19/2020 |
| COSENTINI ASSOCIATES | 1 | 11/08/2019 |
| ANDREW FORMICHELLA | 1 | 10/01/2019 |
| JOEL PHAGOO P.E. PLLC | 3 | 11/05/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 205 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 52 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 10 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 20 | 03/21/2026 |
| BUILDING BROTHERS | 4 | 03/21/2026 |
| ABCO-PEERLESS SPRINKLER | 2 | 03/21/2026 |
| MRA ENGINEERING P C | 4 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 2 | 03/21/2026 |
| JMV ASSOCIATES LLC | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE TURNER | General Contractor | 265 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 53 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 51 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 25 | 08/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 25 | 07/08/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 14 | 07/08/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 12 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 11 | 07/08/2026 |
| ALMAR PLUMBING & HTG CORP | Plumbing | 8 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 8 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 7 | 07/08/2026 |
| W & W GLASS LLC | General Contractor | 6 | 07/08/2026 |
| BARRY SAXE | Electrical | 6 | 03/21/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 4 | 07/08/2026 |
| PHASE 1 GROUP INC | Plumbing | 4 | 07/08/2026 |
| LAWRENCE J. LEVINE | Fire Protection | 4 | 03/21/2026 |
| BREEZE NATIONAL INC | General Contractor | 4 | 07/08/2026 |
| ACTIVE SIGNS | Scaffold | 3 | 07/08/2026 |
| ZWICKER ELEC. CO., INC. | Electrical | 2 | 03/22/2026 |
| O'KANE JOHN | Electrical | 2 | 03/21/2026 |
| JOHN O'KANE | Electrical | 2 | 03/21/2026 |
| DIFAZIO ELECTRIC NY, INC | Electrical | 2 | 03/22/2026 |
| PAR PLUMBING CO., INC | Plumbing | 2 | 07/08/2026 |
| E.T. VANDERBECK INC | General Contractor | 1 | 07/08/2026 |
| ALLRAN ELECTRIC OF NY LLC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CODEGREEN | 510 | 151 | 05/05/2026 |
| URBAN ENGINEERS OF NEW YO | 470 | 28 | 11/10/2023 |
| G. BLINN CONSULTING, LLC | 2894 | 3 | 11/15/2022 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 1 | 05/18/2021 |
| STRUCTURAL CONSULTING SER | 1919 | 1 | 06/19/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 08/07/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 05/08/2026 |
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 05/06/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 03/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 03/26/2026 |
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 03/26/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 03/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 03/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 02/19/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 02/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 02/18/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 02/18/2026 |
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 12/31/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 12/31/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 11/24/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 09/12/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 08/08/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 08/04/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 08/04/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 01/30/2025 |
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 01/30/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 12/11/2024 |
| DOB NOW | Plumbing | Signed-off | ALMAR PLUMBING & HTG CORP | 09/12/2024 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 06/05/2024 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 04/15/2024 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 04/11/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 03/18/2024 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 03/14/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 03/14/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 02/08/2024 |
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 02/01/2024 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 02/01/2024 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 12/12/2023 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 12/06/2023 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 11/29/2023 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 11/16/2023 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 11/14/2023 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 10/17/2023 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 09/06/2023 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE TURNER | 07/25/2023 |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/15/2026 | Pass PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/08/2026 | Pass CND-Occupancy Inspection | Pass | View ↗ |
| 08/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/14/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/20/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/04/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 05/01/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/22/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/15/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/14/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/03/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/31/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/09/2026 | Final | Stephanie Lan | progress |
| 04/22/2026 | Public Assembly Emergency Lighting | James Sullivan Jr | progress |
| 04/22/2026 | Public Assembly Emergency Lighting | James Sullivan Jr | progress |
| 04/22/2026 | Public Assembly Emergency Lighting | James Sullivan Jr | progress |
| 04/22/2026 | Public Assembly Emergency Lighting | James Sullivan Jr | progress |
| 03/23/2026 | Luminous Exit Path Markings | HATIM ELSAID | special |
| 02/25/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 02/23/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 02/13/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 02/13/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 01/30/2026 | Structural Steel - Details | James Sullivan Jr | special |
| 01/30/2026 | Concrete - Cast-In-Place | James Sullivan Jr | special |
| 01/30/2026 | Structural Steel - Welding | James Sullivan Jr | special |
| 01/30/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 01/30/2026 | Structural Steel - High Strength Bolting | James Sullivan Jr | special |
| 01/30/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 01/30/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 01/27/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 01/27/2026 | Sprayed fire-resistant materials | HATIM ELSAID | special |
| 01/27/2026 | Standpipe Systems | HATIM ELSAID | special |
| 01/27/2026 | Fire-Resistance Rated Construction | HATIM ELSAID | progress |
| 01/27/2026 | Mastic and Intumescent Fire-resistant Coatings | HATIM ELSAID | special |
| 01/27/2026 | Final | James Sullivan Jr | progress |
| 01/27/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 01/27/2026 | Final | Stephanie Lan | progress |