550 WEST 160TH STREET
MANHATTAN · BIN 1062789
💬 Discuss this project
1906Year Built
5Stories
C1Building Class
R7-2Zoning
—Gross Floor Area
15Units
74 Active Violations 73 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: New York Equity Fund 2004 · 3.21 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBulger / Luacaw1 filing · 8 docs
Floor 5Bulger / Luacaw1 filing · 8 docs
Floor 4Bulger / Luacaw1 filing · 8 docs
Floor 3Bulger / Luacaw1 filing · 8 docs
Floor 2Bulger / Luacaw1 filing · 8 docs
Floor 1Bulger / Luacaw1 filing · 8 docs
CellarBulger / Luacaw1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1203/21/2026
Builder Buildings403/21/2026
New York Equity Fund 2004203/22/2026
City103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Emtg Consultants309/10/2026
Urban Quotient107/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City-Wide Testing416209/10/2026
Building Lifecycle
All (108)Filed (4)Violation (60)Objection (14)Special Inspection (30)
10/21/2026
Objection raised — Other
10/21/2026
Objection resolved — Resolved
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Other
09/10/2026
Filed — Alteration
Replace existing boilers with two new 285,000 BTUH gas-fired hot-water boilers (B-1 and B-2), including associated piping, controls, and insulation
M01419298-S3
09/09/2026
Objection raised — Other
09/08/2026
Filed — Alteration
Replace existing boilers with two new 285,000 BTUH gas-fired hot-water boilers (B-1 and B-2), including associated piping, controls, and insulation
M01419298-S2
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
08/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/28/2026
Special inspection requirement — Post-installed Anchors
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
C
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/12/2026
Objection raised — Cost
08/12/2026
Objection raised — Other
08/12/2026
Objection raised — Other
08/11/2026
Filed — Alteration
Replace existing boilers with two new 285,000 BTUH gas-fired hot-water boilers (B-1 and B-2), including associated piping, controls, and insulation
M01419298-S1
08/07/2026
Special inspection requirement — Heating Systems
08/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/07/2026
Special inspection requirement — Shutoff dampers
08/07/2026
Special inspection requirement — Permanent certificate
08/07/2026
Special inspection requirement — Maintenance information
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/03/2026
Objection raised — Other
08/03/2026
Objection raised — Other
08/03/2026
Objection raised — Other
07/28/2026
Filed — Alteration
Replace existing boilers with two new 285,000 BTUH gas-fired hot-water boilers (B-1 and B-2), including associated piping, controls, and insulation
M01419298-I1
07/27/2026
Special inspection requirement — Lighting controls
ELIAS RASABI
07/27/2026
Special inspection requirement — Interior lighting power
ELIAS RASABI
07/27/2026
Special inspection requirement — Exterior lighting power
ELIAS RASABI
07/21/2026
Special inspection requirement — Mechanical Systems
07/21/2026
Special inspection requirement — Final
07/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
07/01/2026
Special inspection requirement — Masonry
ELIAS RASABI
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
07/01/2026
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
07/01/2026
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFBISSUEDNicholas A. Cantatore01/10/2007
BISSPISSUEDThe Plumbing Company11/08/2006
BISEQISSUEDColgate Scaf06/24/2006
BIS—ISSUEDAlmo Group03/14/2006
BISEQISSUEDAlmo Group03/14/2006
BISEQISSUEDAlmo Group01/06/2006
BISEQISSUEDColgate Scaf07/07/2005
BISSPISSUEDBletsas Plumbing & Heating03/16/2005
BISEQISSUEDAlmo Group03/10/2005
BIS—ISSUEDAlmo Group03/10/2005
BISPLISSUEDBletsas Plumbing & Heating12/17/2004
BISEQISSUEDAlmo Group08/06/2004
BIS—ISSUEDSigma Contracting06/10/2004
BISOTISSUEDSkylark General Contractors08/16/1999
BISFBISSUEDS.J. Fuel Co10/08/1997
BISPLISSUEDEdward Esbin & Sons03/01/1994
BISEQISSUEDEaster Construction01/21/1994
BISFBISSUEDS.J. Fuel Co05/25/1993
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/28/2026Fire-Resistant Penetrations and Joints—special
08/28/2026HVAC-R and service water heating equipment—energy_progress
08/28/2026HVAC-R and service water piping design and insulation—energy_progress
08/28/2026HVAC-R and service water heating system controls—energy_progress
08/28/2026Energy Code Compliance Inspections—progress
08/28/2026Tenant Protection Plan Compliance—special
08/28/2026Post-installed Anchors—special
08/07/2026Heating Systems—special
08/07/2026Tenant Protection Plan Compliance—special
08/07/2026Energy Code Compliance Inspections—progress
08/07/2026HVAC-R and service water heating equipment—energy_progress
08/07/2026Shutoff dampers—energy_progress
08/07/2026Permanent certificate—energy_progress
08/07/2026Maintenance information—energy_progress
08/07/2026HVAC-R and service water piping design and insulation—energy_progress
08/07/2026HVAC-R and service water heating system controls—energy_progress
07/27/2026Lighting controlsELIAS RASABIenergy_progress
07/27/2026Interior lighting powerELIAS RASABIenergy_progress
07/27/2026Exterior lighting powerELIAS RASABIenergy_progress
07/21/2026Mechanical Systems—special
07/21/2026Final—progress
07/17/2026Tenant Protection Plan ComplianceELIAS RASABIspecial
07/01/2026MasonryELIAS RASABIspecial
07/01/2026Energy Code Compliance InspectionsELIAS RASABIprogress
07/01/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
Latest 25 of 33.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026M01419298-S1Request digital key ↗
08/15/2026M01419298-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026M01419298-S1Open ↗
08/16/2026M01419298-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026M01419298-S1Open ↗
08/15/2026M01419298-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/16/2026M01419298-S1Open ↗
08/15/2026M01419298-I1Open ↗