550 WEST 20TH STREET · BIN 1012284
💬 Discuss this project
1931Year Built
8Stories
Y3Building Class
C6-3Zoning
95,837 sfGross Floor Area
2Units
LL97 Covered3 Active Violations 2 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Prison, jail, house of detention · 15,800 sf lot · 6.07 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBayview Reentry Owner LLCUnder Construction7 filings
RoofSidewalk shed and fenceUnder Construction1p · 2 filings
Floor 7Chelsea Beacon Owner LLCUnder Construction1 filing
Floor 6Chelsea Beacon Owner LLCUnder Construction1 filing
Floor 5Chelsea Beacon Owner LLCUnder Construction1 filing
Floor 4Chelsea Beacon Owner LLCUnder Construction1 filing
Floor 3Chelsea Beacon Owner LLCUnder Construction1 filing
Floor 2Chelsea Beacon Owner LLCUnder Construction1 filing
Floor 1Chelsea Beacon Owner LLCUnder Construction1p · 1 filing
CellarChelsea Beacon Owner LLCUnder Construction1p · 1 filing · 3 docs
Site & exteriorPipe scaffold installationUnder Construction3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Minhas General Contractor Company604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Howard I. Shapiro & Associates910/02/2026
Sandeep Gunnala Engineering109/08/2026
Nomad R&D609/04/2026
Plan B Engineering109/03/2026
Langan Engineering107/28/2026
EP Engineering507/27/2026
Thornton Tomasetti106/05/2026
Silman204/01/2026
Cookfox Architects112/19/2025
George J. Xerakias, PE110/02/2025
Bitopi Consultants104/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147803/21/2026
Smep Design & Consultation203/21/2026
AK Consulting Services203/21/2026
Howard I Shapiro Associates403/21/2026
HS Design Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyline Scaffolding GroupScaffold510/04/2026
Minhas General ContractorScaffold304/09/2026
Fifth Avenue BuildersScaffold210/01/2026
Donato Plumbing GroupPlumbing108/26/2026
Star-Delta ElectricElectrical103/21/2026
KG SprinklerFire Protection109/19/2026
Fifth Avenue BuildersGeneral Contractor107/01/2026
Meridian Construction GroupScaffold110/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs687910/02/2026
Sandeep Gunnala Engineering8482109/08/2026
Langan Engineering, Env, Surveyin1265207/28/2026
George J. Xerakias, PE1658110/02/2025
Building Lifecycle
All (144)Filed (30)Permit Issued (16)Signed Off (1)Violation (20)Objection (47)Special Inspection (30)
10/02/2026
Filed — Alteration
INTERIOR NON-STRUCTURAL DEMOLITION AS PER PLANS.
M01304727-P2
10/02/2026
Filed — Alteration
FACADE OPENINGS IN PORTION OF TERRA COTTA EXTERIOR WALL ON NORTH FACADE FOR CONSTRUCTION HOIST INSTALLATION.
M01408218-P1
10/02/2026
Permit issued — Supported Scaffold
M01455319-I1-SF
09/30/2026
Permit issued — Protection and Mechanical Methods
M01311273-I1-PMM
09/22/2026
Special inspection requirement — Final
James Scheld
09/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/18/2026
Permit issued — Standpipe
M01435156-I1-EW-SD
09/17/2026
Special inspection requirement — Final
James Scheld
09/08/2026
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF A PIPE SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01455319-I1
09/08/2026
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
09/08/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Sandeep Gunnala
09/04/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLYWITH CH #33 OF THE NYC BC. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01406614-P3
09/04/2026
Permit issued — Protection and Mechanical Methods
M01406614-S3-PMM
09/03/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLYWITH CH #33 OF THE NYC BC. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01406614-S3
08/26/2026
Objection raised — Other
08/25/2026
Permit issued — Plumbing
M01435148-I1-PL
08/20/2026
Permit issued — Sidewalk Shed
M01406614-S1-SH
08/20/2026
Objection resolved — Resolved
08/19/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLYWITH CH #33 OF THE NYC BC. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01406614-P2
08/19/2026
Special inspection requirement — Fenestration areas
08/19/2026
Special inspection requirement — Air barrier - visual inspection
08/19/2026
Special inspection requirement — Insulation placement and R values
08/19/2026
Special inspection requirement — Fenestration air leakage
08/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/10/2026
Objection raised — Other
07/31/2026
Objection raised — Other
07/31/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Other
07/31/2026
Objection resolved — Resolved
07/30/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLYWITH CH #33 OF THE NYC BC. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01406614-P1
07/30/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
07/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PARTIAL STRUCTURAL DEMOLITION MEANS & METHODS FOR ALT-CO FILED UNDER M01314086-I1.
M01314086-S8
07/27/2026
Filed — Alteration
FILING HEREWITH REMOVAL OF ALL EXISTING GAS PIPING AS PER PLANS.
M01435148-I1
07/27/2026
Filed — Alteration
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE "1". PHASE "2": STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
M01435156-I1
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/22/2026
Objection raised — Other
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection raised — Other
07/22/2026
Objection resolved — Addressed
07/22/2026
Special inspection requirement — Standpipe Systems
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection resolved — Addressed
07/15/2026
Objection raised — Cost
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Scope
07/15/2026
Objection raised — Other
06/24/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/11/2026
Objection resolved — Addressed
06/05/2026
Signed off — Alteration
M01156162-I1
06/05/2026
Filed — Alteration
FILING HEREWITH LOCALIZED REPAIRS OF BRICK, TERRACOTTA AND CAST STONE MASONRY AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01404994-I1
06/03/2026
Permit issued — Protection and Mechanical Methods
M01311265-I1-PMM
06/02/2026
Permit issued — Suspended Scaffold
M01156162-I1-SC
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedMeridian Construction Group10/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedFifth Avenue Builders09/30/2026
DOB NOWStandpipePermit IssuedKG Sprinkler09/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group09/04/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing Group08/25/2026
DOB NOWSidewalk ShedPermit IssuedSkyline Scaffolding Group08/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedFifth Avenue Builders06/03/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/02/2026
DOB NOWSidewalk ShedPermit IssuedSkyline Scaffolding Group06/01/2026
DOB NOWConstruction FencePermit IssuedSkyline Scaffolding Group06/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group06/01/2026
DOB NOWGeneral ConstructionPermit IssuedFifth Avenue Builders05/26/2026
DOB NOWSidewalk ShedPermit IssuedMinhas General Contractor10/27/2025
DOB NOWSuspended ScaffoldPermit IssuedNew Roc Contracting10/03/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/30/2024
DOB NOWSidewalk ShedPermit IssuedMinhas General Contractor04/04/2024
BISEQISSUEDSafway Atlantic03/08/2023
BISEQISSUEDSafway Atlantic12/27/2021
BISEQISSUEDSafway Atlantic01/13/2021
BISEQISSUEDSafway Atlantic08/30/2019
BISEQISSUEDSafway Atlantic09/25/2018
BISEQISSUEDSafway Atlantic10/20/2017
BISOTISSUEDTishman Interiors11/14/2016
BISEQISSUEDSafway Atlantic11/03/2016
BISEQISSUEDJ & G General Contracting05/26/2010
BISEQISSUEDCSC of New York05/07/2004
BISEQISSUEDCSC of New York04/21/2004
1 project · most recent 07/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
07/28/2026——Heating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 07/28/2026
Sprinkler System
FiledStatusContractorScope
07/28/2026——Sprinkler System
07/27/2026Permit IssuedKG Sprinkler4 outlets
2 projects · most recent 07/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/28/2026——Gas, Storm, Water/Sanitary
07/27/2026Permit IssuedDonato Plumbing GroupGas
4 projects · most recent 10/16/2026
General Wiring
FiledStatusContractorScope
10/16/2026Permit IssuedReliant Electrical Cont'g1 meters, 1 new_meters
08/28/2026Permit IssuedJam ElectricalGeneral Wiring
08/25/2026Permit IssuedReliant Electrical Cont'g—
05/29/2026Permit IssuedTop Shelf Electric—
3 projects · most recent 10/02/2026
Steel Concrete
FiledStatusContractorScope
10/02/2026——2 scope_items
07/28/2026——Steel, Concrete
06/01/2026——1 scope_items
2 projects · most recent 09/08/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
09/08/2026Permit IssuedMeridian Construction GroupScaffold
09/04/2026Permit IssuedSkyline Scaffolding GroupFence, Sidewalk Shed
1 project · most recent 10/02/2025
Suspended Scaffold
FiledStatusContractorScope
10/02/2025Permit IssuedNew Roc ContractingSuspended Scaffold
1 project · most recent 10/02/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/02/2025Permit IssuedNew Roc ContractingSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
09/22/2026FinalJames Scheldprogress
09/22/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/17/2026FinalJames Scheldprogress
09/08/2026Post-installed AnchorsSandeep Gunnalaspecial
09/08/2026Alternative Materials - OTCR Buildings Bulletin NumberSandeep Gunnalaspecial
08/19/2026Fenestration areas—energy_progress
08/19/2026Air barrier - visual inspection—energy_progress
08/19/2026Insulation placement and R values—energy_progress
08/19/2026Fenestration air leakage—energy_progress
08/19/2026Fenestration and door U-factor and product ratings—energy_progress
07/30/2026Construction Operations Influencing Adjacent Structures—special
07/22/2026Standpipe Systems—special
05/29/2026Final—progress
05/29/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
05/27/2026FinalJames Scheldprogress
05/27/2026Structural Stability – Alterations of existing buildings—special
05/26/2026Post-installed Anchors—special
05/26/2026Masonry—special
05/26/2026Structural Stability – Alterations of existing buildings—special
05/20/2026Final—progress
03/09/2026Construction Operations Influencing Adjacent Structures—special
02/10/2026Air barrier continuity plan testing—energy_progress
02/10/2026Vestibules—energy_progress
02/10/2026Protection of exposed foundation insulation—energy_progress
01/26/2026FinalJames Scheldprogress
Latest 25 of 56.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
10/04/2026M01455319-P1Request digital key ↗
10/04/2026M01455319-I1Request digital key ↗
08/27/2026M01028549-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION14
11/22/2021122887242Open ↗
11/23/2018122887242Open ↗
08/22/2018122887242Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
03/08/2023122887242Open ↗
12/28/2021122887242Open ↗
01/13/2021122887242Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/18/2026M01314086-I1Open ↗
08/18/2026M01314086-S6Open ↗
08/15/2026M01404994-I1Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/18/2026M01314086-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026M01314086-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature29
10/05/2026M01304727-P2Open ↗
10/05/2026M01408218-P1Open ↗
10/03/2026M01455319-P1Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
08/22/2018122887242Open ↗
04/10/2017122934398Open ↗
01/09/2017122921142Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/05/2026M01408218-P1Open ↗
10/03/2026M01455319-P1Open ↗
10/03/2026M01455319-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/05/2026M01304727-P2Open ↗
09/01/2026M01304727-I1Open ↗
08/25/2026M01304727-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/22/2018122887242Open ↗
11/15/2016122934398Open ↗
05/25/2010120362277Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/22/2018122887242Open ↗
11/22/2016122887242Open ↗
11/15/2016122934398Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/25/2010120362277Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/12/2016122921142Open ↗
12/07/2016122921133Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/18/2026M01314086-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWCertificate of No Harassment3
10/05/2026M01304727-P2Open ↗
08/13/2026M01304727-I1Open ↗
08/13/2026M01304727-P1Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
01/09/2017122921142Open ↗
11/16/2016122934398Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/12/2016122921142Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/18/2026M01314086-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/05/2026M01304727-P2Open ↗
08/19/2026M01304727-P1Open ↗
08/19/2026M01304727-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/25/2010120362277Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/12/2016122921142Open ↗
11/15/2016122934398Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/22/2016122887242Open ↗
▸Inspections & Test Reports4
▸DOB NOWSoil Report2
08/13/2026M01314086-S1Open ↗
08/18/2026M01314086-S1Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/09/2017122921133Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/18/2026M01314086-S1Open ↗
▸Approvals, Objections & Sign-offs30
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
09/15/2026M01406614-P3Open ↗
08/20/2026M01406614-P2Open ↗
08/18/2026M01314086-S4Open ↗
Showing 3 of 17 on file for this type
▸BISSHED LETTER7
03/08/2023122887242Open ↗
12/28/2021122887242Open ↗
12/28/2021122887242Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/08/2023122887242Open ↗
03/08/2023122887242Open ↗
12/28/2021122887242Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
05/25/2010120362277Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/10/2017122934398Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/10/2017122934398Open ↗
12/12/2016122921142Open ↗
12/12/2016122921142Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET6
12/12/2016122921142Open ↗
12/12/2016122921142Open ↗
12/07/2016122921133Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
03/29/2019122887242Open ↗
11/21/2018122887242Open ↗
01/09/2017122921142Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
03/08/2023122887242Open ↗
12/28/2021122887242Open ↗
01/13/2021122887242Open ↗
Showing 3 of 4 on file for this type
▸Other Documents25
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION18
12/28/2021122887242Open ↗
12/28/2021122887242Open ↗
12/28/2021122887242Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/18/2026M01314086-I1Open ↗
08/18/2026M01314086-S6Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01156162-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01290490-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/18/2026M01314086-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01290490-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026M01314086-I1Open ↗