← Back
Primarily 2 family with 1 store or office
5507 11 AVENUE
BROOKLYN · BIN 3139663
💬 Discuss this project
1925Year Built
2Stories
S2Building Class
R5Zoning
2,644 sfGross Floor Area
3Units
Rent Stabilized18 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,467 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalFire Protection
Floor 17p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEY ASSOCIATES707/22/2025
EYAL LEVITT ARCHITECT PC212/18/2024
ASHER ARCHITECT103/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHS CONTRACTING LLCGeneral Contractor307/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252907/22/2025
Building Lifecycle
All (123)Filed (10)Permit Issued (4)Signed Off (4)Violation (23)Inspection (10)Objection (45)Special Inspection (27)
08/26/2026
Signed off — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-I1
04/30/2026
Violation issued (HPD, open)
A
03/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2025
Objection resolved — Addressed
11/19/2025
Violation issued (HPD, open)
I
08/06/2025
Objection raised — Scope
07/22/2025
Filed — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-P6
07/16/2025
Special inspection requirement — Lighting controls
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
06/05/2025
Violation issued (HPD, open)
A
04/01/2025
Filed — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-P5
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Lighting controls
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
03/31/2025
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
03/18/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEMS ASSOCIATED DUCTS AND PIPING, TO ADDRESS ECB VIOLATIONS # 34152047L, # 34152046J
B01127345-I1
02/28/2025
Violation issued (FDNY_NOV, closed)
02/25/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/28/2025
Objection resolved — Addressed
01/27/2025
Objection raised — Scope
01/22/2025
Filed — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-P4
01/09/2025
Objection raised — Scope
01/02/2025
Filed — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-P3
01/01/2025
Signed off — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-S1
12/20/2024
Objection raised — Other
12/20/2024
Objection resolved — Addressed
12/18/2024
Filed — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-P1
12/18/2024
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
12/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/17/2024
Signed off — Alteration CO
Interior renovation to first floor and cellar, converting a residential unit to childcare.
B00923932-S2
12/11/2024
Permit issued — Mechanical Systems
B01127345-I1-MS
11/27/2024
Violation issued (HPD, open)
I
11/21/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/31/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS ASSOCIATED DUCTS AND PIPING, TO ADDRESS ECB VIOLATIONS # 34152047L, # 34152046J
B01127345-I1
10/31/2024
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
10/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
10/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
10/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/15/2024
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
10/15/2024
Special inspection requirement — Final
NAVEEN KUMAR
10/11/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCHS CONTRACTING12/11/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/21/2024
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC05/29/2024
DOB NOWGeneral ConstructionPermit IssuedCHS CONTRACTING05/24/2024
1 project · most recent 07/22/2025
Sprinkler System
FiledStatusContractorScope
07/22/2025Signed-offPLBG P & H INCSprinkler System
1 project · most recent 07/22/2025
Water/Sanitary
FiledStatusContractorScope
07/22/2025Signed-offA M B MECHANICAL INCWater/Sanitary
4 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026CompleteFRIED ELECTRIC CO.General Wiring
03/02/2026CompleteFRIED ELECTRIC CO.General Wiring
07/10/2025CompleteACCURATE ELEC'L CORP.General Wiring
02/27/2025CompleteKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/25/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/16/2025Lighting controlsINDARDEO PARBHUNATHenergy_progress
07/16/2025Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
07/16/2025Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
07/16/2025Interior lighting powerINDARDEO PARBHUNATHenergy_progress
07/16/2025Fenestration areasINDARDEO PARBHUNATHenergy_progress
07/16/2025Maintenance informationINDARDEO PARBHUNATHenergy_progress
07/16/2025Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
07/16/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
07/16/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
03/31/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
03/31/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
03/31/2025Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
03/31/2025Lighting controlsINDARDEO PARBHUNATHenergy_progress
03/31/2025Interior lighting powerINDARDEO PARBHUNATHenergy_progress
03/31/2025Fenestration areasINDARDEO PARBHUNATHenergy_progress
03/31/2025Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
03/31/2025Maintenance informationINDARDEO PARBHUNATHenergy_progress
03/31/2025Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
12/18/2024Sprinkler SystemsINDARDEO PARBHUNATHspecial
12/18/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
10/31/2024Maintenance informationINDARDEO PARBHUNATHenergy_progress
10/31/2024HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
10/31/2024HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
10/31/2024HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
10/31/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
Latest 25 of 27.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00839615-I1Request digital key ↗
08/23/2026B01127345-I1Request digital key ↗
08/23/2026B00923932-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00923932-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature21
08/30/2026B00923932-P6Open ↗
08/30/2026B00923932-P6Open ↗
08/30/2026B00923932-P6Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026B00839615-I1Open ↗
08/23/2026B00923932-P1Open ↗
08/23/2026B00923932-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00923932-P1Open ↗
09/01/2026B00923932-P1Open ↗
08/30/2026B00923932-P6Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist6
08/27/2026B00839615-I1Open ↗
08/13/2026B00923932-P5Open ↗
08/13/2026B00923932-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Trees Site Plan2
08/13/2026B00839615-I1Open ↗
08/13/2026B00923932-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026B00839615-I1Open ↗
08/13/2026B00923932-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00839615-I1Open ↗
08/13/2026B00923932-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00839615-I1Open ↗
08/23/2026B00923932-P1Open ↗
08/23/2026B00923932-S2Open ↗
Showing 3 of 10 on file for this type
▸Other Documents6
▸DOB NOWProperty Ownership Certification6
08/27/2026B00839615-I1Open ↗
08/23/2026B00923932-P3Open ↗
08/23/2026B00923932-I1Open ↗
Showing 3 of 6 on file for this type