← Back
Primarily 1 family with 1 store or office
5508 18 AVENUE
BROOKLYN · BIN 3130740
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R5Zoning
2,400 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 18 AVE BUILDING LLC · 1,600 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 8 docs
Floor 22p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/15/2023$1.4M—5508 18TH AVENUE LLC → 18 AVE BUILDING LLC$583/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSULTING ENGINEERS106/04/2024
MARK WEINBERGER ARCHITECT PLLC305/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGNS803/21/2026
Building Lifecycle
All (46)Filed (4)Violation (3)Objection (30)Special Inspection (9)
07/16/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Scope
07/02/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/20/2024
Objection resolved — Addressed
06/20/2024
Special inspection requirement — Structural Steel - Details
06/14/2024
Objection raised — Scope
06/05/2024
Objection raised — Scope
06/05/2024
Objection raised — Scope
06/04/2024
Filed — Alteration
Installation of 8' Construction fence
B01049479-S3
06/03/2024
Special inspection requirement — Subgrade Inspections
06/03/2024
Special inspection requirement — Structural Cold-Formed Steel
06/03/2024
Special inspection requirement — Structural Steel - High Strength Bolting
06/03/2024
Special inspection requirement — Structural Steel - Welding
06/03/2024
Special inspection requirement — Sprayed fire-resistant materials
05/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/30/2024
Special inspection requirement — Final
05/29/2024
Filed — Alteration
Installation of 8' Construction fence
B01049479-S2
05/29/2024
Objection raised — Scope
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Scope
05/29/2024
Objection resolved — Addressed
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/27/2024
Filed — Alteration
Installation of 8' Construction fence
B01049479-S1
05/24/2024
Objection resolved — Addressed
05/23/2024
Objection resolved — Addressed
05/23/2024
Objection resolved — Addressed
05/23/2024
Objection resolved — Addressed
05/23/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Scope
05/20/2024
Objection raised — Cost
05/20/2024
Objection raised — Scope
05/14/2024
Filed — Alteration
Installation of 8' Construction fence
B01049479-I1
06/27/2023
Violation issued (HPD, closed)
I
06/26/2023
Violation issued (HPD, closed)
C
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Nothing on file for this building.
1 project · most recent 06/04/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/04/2024——Gas, Water/Sanitary
1 project · most recent 06/04/2024
Steel Concrete Wood
FiledStatusContractorScope
06/04/2024——Steel, Concrete, Wood
1 project · most recent 06/04/2024
Fence
FiledStatusContractorScope
06/04/2024——Fence
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/20/2024Structural Steel - Details—special
06/03/2024Subgrade Inspections—special
06/03/2024Structural Cold-Formed Steel—special
06/03/2024Structural Steel - High Strength Bolting—special
06/03/2024Structural Steel - Welding—special
06/03/2024Sprayed fire-resistant materials—special
05/30/2024Structural Stability – Alterations of existing buildings—special
05/30/2024Final—progress
05/29/2024Fire-Resistant Penetrations and Joints—special
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B01049479-S2Request digital key ↗
08/15/2026B01049479-I1Request digital key ↗
08/15/2026B01049479-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B01049479-I1Open ↗
08/25/2026B01049479-S2Open ↗
08/25/2026B01049479-S1Open ↗
Showing 3 of 4 on file for this type