DOB06/22/2007WORK W/O A PERMIT. WORK NOTED: TOTAL GUT REHAB OF 1ST. FL. APT. AND CONSTRUCTION WORK IN PROGRESS. NEW PARTITION (WOOD,METAL) FRAMING NEW WATER AND WASTE LINES, TILE FL. WORK ABOUT 50% COMPLET. REMEDY: STOP ALL WORK IMMEDIATELY OBTAIN PERMITS, CHECK WITH DOB
HPD09/17/2003SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS REQUIRED
Miscellaneous religious facility · Owner of record: PARK SLOPE CHRISTIANCENTER INC · 4,752 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.