← Back
BuildNYC
Church, synagogue, chapel
Fourth Church of Christ, Scientist
551 FORT WASHINGTON AVENUE · BIN 1064361
💬 Discuss this project
1932Year Built
3Stories
M1Building Class
R7-2Zoning
12,482 sfGross Floor Area
1Units
0 Active Violations
Church, synagogue, chapel · 10,000 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFourth Church of Christ, Scientist7p · 3 filings · 14 docs
Floor 3Fourth Church of Christ, Scientist2p · 1 filing · 10 docs
Floor 2Fourth Church of Christ, Scientist6p · 2 filings · 15 docs
Floor 1Fourth Church of Christ, Scientist3p · 2 filings · 13 docs
Sub-BasementFourth Church of Christ, Scientist9p · 2 filings · 14 docs
Site & exteriorFourth Church of Christ, Scientist6p · 2 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hebrew Tabernacle of Washington Heights103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Paul Fusco Consulting403/21/2026
Global Arch. Design103/21/2026
Green Studio203/21/2026
TBC & Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Absolute Cooling and HeatingGeneral Contractor507/08/2026
CJ Heating & MechanicalPlumbing507/08/2026
Master Fire MechanicalGeneral Contractor303/21/2026
Tab RestorationsGeneral Contractor303/21/2026
Fusion Electl ContrngElectrical103/22/2026
Ace Group NYScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Structural Engineering BU5883101/15/2026
Global Arch Design & Builders3397309/24/2021
Bazini Engineering1808109/14/2021
NS Engineering & Consulting3652203/23/2021
Building Lifecycle
All (46)Filed (8)Permit Issued (11)Signed Off (3)Violation (7)Special Inspection (17)
05/08/2026
Signed off — Alteration
LIMITED FACADE REPAIRS, INCLUDING RE-POINTING OF MORTAR JOINTS AND REPLACEMENT OF DETERIORATED BRICKWORK.
M01341881-I1
02/18/2026
Permit issued — Sidewalk Shed
M01360174-I1-SH
02/17/2026
Filed — Alteration
M01360174-I1
01/30/2026
Permit issued — General Construction
M01341881-I1-GC
01/15/2026
Filed — Alteration
LIMITED FACADE REPAIRS, INCLUDING RE-POINTING OF MORTAR JOINTS AND REPLACEMENT OF DETERIORATED BRICKWORK.
M01341881-I1
01/03/2026
Special inspection requirement — Masonry
Ruslan Solovyev
01/03/2026
Special inspection requirement — Final
Ruslan Solovyev
08/04/2024
Signed off — Alteration
INSTALL SIX (6) REPLACEMENT SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00507846-I1
08/02/2024
Signed off — Alteration
Adding steel structure on top of existing steel dunnage on the roof for mechanical equipment, there is no change of egress, usage or occupancy under this application.
M00600442-I1
07/30/2024
Permit issued — Structural
M00600442-I1-ST
12/06/2021
Permit issued — Plumbing
M00275378-I1-PL
11/22/2021
Permit issued — Mechanical Systems
M00507846-I1-MS
11/12/2021
Permit issued — Mechanical Systems
M00507846-I1-MS
09/24/2021
Filed — Alteration
Adding steel structure on top of existing steel dunnage on the roof for mechanical equipment, there is no change of egress, usage or occupancy under this application.
M00600442-I1
09/24/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
NITHIN JOHN
09/24/2021
Special inspection requirement — Final
NITHIN JOHN
09/24/2021
Special inspection requirement — Structural Steel - Welding
NITHIN JOHN
09/24/2021
Special inspection requirement — Structural Steel - Details
NITHIN JOHN
09/14/2021
Filed — Alteration
INSTALL SIX (6) REPLACEMENT SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00507846-I1
08/31/2021
Permit issued — Plumbing
M00275378-I1-PL
07/27/2021
Filed — Alteration
Filing herewith plumbing work including replacement of gas piping as per plans submitted herewith. No change to use, occupancy or egress under this application.
M00275378-P1
07/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
07/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
04/26/2021
Permit issued — Plumbing
M00275378-I1-PL
04/21/2021
Special inspection requirement — Final
Joseph Bazini
04/21/2021
Special inspection requirement — Mechanical Systems
Joseph Bazini
04/15/2021
Permit issued — Plumbing
M00482005-I1-PL
03/24/2021
Permit issued — Mechanical Systems
M00484506-I1-MS
03/23/2021
Filed — Alteration
INSTALLING NEW COMMERCIAL COOKING EQUIPMENT IN EXISTING HOUSE OF WORSHIP. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00482005-I1
03/19/2021
Filed — Alteration
M00484506-I1
03/11/2021
Special inspection requirement — Electrical motors and elevators
NARI MOTWANI
03/11/2021
Special inspection requirement — Maintenance information
NARI MOTWANI
03/11/2021
Special inspection requirement — Final
DAVIDSON CHRISTMAS
03/11/2021
Special inspection requirement — Mechanical Systems
NARI MOTWANI
03/11/2021
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
03/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
03/11/2021
Special inspection requirement — Duct leakage testing, insulation and design
NARI MOTWANI
02/21/2020
Permit issued — Plumbing
M00275378-I1-PL
02/11/2020
Filed — Alteration
Filing herewith plumbing work including replacement of gas piping as per plans submitted herewith. No change to use, occupancy or egress under this application.
M00275378-I1
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAce Group NY02/18/2026
DOB NOWGeneral ConstructionSigned-offTab Restorations01/30/2026
DOB NOWStructuralSigned-offAbsolute Cooling Heat07/30/2024
DOB NOWPlumbingSigned-offCJ Heating & Mechanical12/06/2021
DOB NOWMechanical SystemsSigned-offAbsolute Cooling Heat11/22/2021
DOB NOWMechanical SystemsSigned-offAbsolute Cooling Heat11/12/2021
DOB NOWPlumbingSigned-offCJ Heating & Mechanical08/31/2021
DOB NOWPlumbingSigned-offCJ Heating & Mechanical04/26/2021
DOB NOWPlumbingPermit IssuedCJ Heating & Mechanical04/15/2021
DOB NOWMechanical SystemsPermit IssuedMaster Fire Mechanical03/24/2021
DOB NOWPlumbingSigned-offCJ Heating & Mechanical02/21/2020
2 projects · most recent 07/27/2021
Gas
FiledStatusContractorScope
07/27/2021Signed-offCJ Heating & MechanicalGas
03/23/2021Permit IssuedCJ Heating & MechanicalGas
2 projects · most recent 02/17/2026
General Wiring
FiledStatusContractorScope
02/17/2026Permit IssuedHigh Quality Electric of NYC—
06/28/2021CompleteFusion Electl ContrngGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/03/2026MasonryRuslan Solovyevspecial
01/03/2026FinalRuslan Solovyevprogress
09/24/2021Structural Stability – Alterations of existing buildingsNITHIN JOHNspecial
09/24/2021FinalNITHIN JOHNprogress
09/24/2021Structural Steel - WeldingNITHIN JOHNspecial
09/24/2021Structural Steel - DetailsNITHIN JOHNspecial
07/27/2021Fire-Resistant Penetrations and JointsNITHIN JOHNspecial
07/20/2021Fire-Resistant Penetrations and JointsNITHIN JOHNspecial
04/21/2021FinalJoseph Baziniprogress
04/21/2021Mechanical SystemsJoseph Bazinispecial
03/11/2021Electrical motors and elevatorsNARI MOTWANIenergy_progress
03/11/2021Maintenance informationNARI MOTWANIenergy_progress
03/11/2021FinalDAVIDSON CHRISTMASprogress
03/11/2021Mechanical SystemsNARI MOTWANIspecial
03/11/2021Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
03/11/2021Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
03/11/2021Duct leakage testing, insulation and designNARI MOTWANIenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fourth Church of Christ, ScientistReligiousEntire building
Project M01360174 Alteration · Permit Entire · 02/17/2026
Project M01341881 Alteration · LOC Issued · 01/15/2026
Project M00600442 Alteration · LOC Issued · 09/24/2021
Project M00507846 Alteration · LOC Issued · 09/14/2021
Project M00482005 Alteration · Permit Entire · 03/23/2021
Project M00484506 Alteration · Permit Entire · 03/19/2021
Project M00275378 Alteration · Permit Entire · 02/11/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
09/04/2026M00484506-I1Request digital key ↗
09/04/2026M00482005-I1Request digital key ↗
09/03/2026M00507846-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00275378-I1Request digital key ↗
08/15/2026M00275378-P1Request digital key ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M00507846-I1Open ↗
08/31/2026M00275378-I1Open ↗
08/29/2026M01341881-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M00507846-I1Open ↗
08/29/2026M01341881-I1Open ↗
08/23/2026M00484506-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00482005-I1Open ↗
09/03/2026M00600442-I1Open ↗
08/19/2026M01341881-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/04/2026M00482005-I1Open ↗
09/03/2026M00600442-I1Open ↗
08/19/2026M01341881-I1Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/03/2026M00600442-I1Open ↗
08/13/2026M00482005-I1Open ↗
08/13/2026M00275378-P1Open ↗
Showing 3 of 6 on file for this type