← Back
Two family converted from one family
551 MAC DONOUGH STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3047021
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
2,328 sfGross Floor Area
2Units
Rent Stabilized25 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,867 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 27p · 1 filing · 8 docs
Floor 17p · 1 filing · 8 docs
Cellar7p · 1 filing · 8 docs
Sub-Basement7p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/27/2024$2.3M—— → —$988/sf building
06/03/2024$1.3M—Private party → MARTOV CONSULTING INC.$540/sf building
09/22/2023$1.2M—Private party → Private party$497/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA206/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KORK INCGeneral Contractor303/21/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
RITE WAY HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415106/03/2024
Building Lifecycle
All (63)Filed (2)Permit Issued (3)Violation (48)Inspection (7)Special Inspection (3)
06/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/27/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/24/2025
Violation issued (HPD, open)
I
09/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Violation issued (HPD, open)
I
10/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2024
Permit issued — Plumbing
B01058271-S1-PL
07/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/24/2024
Permit issued — Plumbing
B01058271-S1-PL
06/07/2024
Permit issued — General Construction
B01058271-I1-GC
06/04/2024
Filed — Alteration
Herewith filing alteration application to relaminate walls , new gyp board , replace windows and all finishes as per plans . new metal deck at rear. To existing 3 story 2 family dwelling . No change in use occupancy or egress
B01058271-S1
06/03/2024
Filed — Alteration
Herewith filing alteration application to relaminate walls , new gyp board , replace windows and all finishes as per plans . new metal deck at rear. To existing 3 story 2 family dwelling . No change in use occupancy or egress
B01058271-I1
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
05/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
05/29/2024
Special inspection requirement — Final
JEFFREY BELL
11/28/2023
Violation issued (HPD, open)
I
07/03/2023
Violation issued (HPD, open)
B
07/03/2023
Violation issued (HPD, open)
B
07/03/2023
Violation issued (HPD, open)
B
07/03/2023
Violation issued (HPD, open)
B
07/03/2023
Violation issued (HPD, open)
B
07/03/2023
Violation issued (HPD, open)
B
11/17/2022
Violation issued (HPD, open)
I
03/16/2022
Violation issued (HPD, open)
I
06/17/2021
Violation issued (HPD, closed)
B
06/17/2021
Violation issued (HPD, open)
B
06/17/2021
Violation issued (HPD, open)
B
06/17/2021
Violation issued (HPD, closed)
B
04/21/2021
Violation issued (HPD, open)
I
10/03/2020
Violation issued (HPD, open)
B
10/03/2020
Violation issued (HPD, open)
B
10/03/2020
Violation issued (HPD, open)
B
08/07/2020
Violation issued (HPD, open)
B
08/07/2020
Violation issued (HPD, closed)
A
08/07/2020
Violation issued (HPD, closed)
C
08/07/2020
Violation issued (HPD, open)
B
08/07/2020
Violation issued (HPD, open)
B
08/07/2020
Violation issued (HPD, open)
B
08/07/2020
Violation issued (HPD, open)
B
07/27/2020
Violation issued (HPD, closed)
A
07/27/2020
Violation issued (HPD, closed)
B
07/27/2020
Violation issued (HPD, closed)
A
11/07/2019
Violation issued (HPD, open)
I
01/08/2018
Violation issued (HPD, closed)
I
01/26/2017
Violation issued (HPD, closed)
B
02/20/2015
Violation issued (HPD, closed)
A
02/04/2014
Violation issued (HPD, closed)
B
12/20/2013
Violation issued (HPD, closed)
B
12/20/2013
Violation issued (HPD, closed)
B
12/20/2013
Violation issued (HPD, closed)
C
12/20/2013
Violation issued (HPD, closed)
B
12/20/2013
Violation issued (HPD, closed)
B
11/22/2011
Violation issued (HPD, open)
B
11/05/2011
Violation issued (HPD, closed)
B
11/05/2011
Violation issued (HPD, closed)
B
11/05/2011
Violation issued (HPD, closed)
B
11/05/2011
Violation issued (HPD, closed)
B
11/05/2011
Violation issued (HPD, closed)
B
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLS PLUMBING CORP09/11/2024
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC06/24/2024
DOB NOWGeneral ConstructionPermit IssuedKORK INC06/07/2024
1 project · most recent 07/11/2024
General Wiring
FiledStatusContractorScope
07/11/2024Permit IssuedA.L. ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2026Fail-Final CND-Occupancy InspectionFailView ↗
09/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/29/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
05/29/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
05/29/2024FinalJEFFREY BELLprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01058271-S1Request digital key ↗
08/24/2026B01058271-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01058271-S1Open ↗
08/24/2026B01058271-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B01058271-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01058271-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B01058271-S1Open ↗
08/24/2026B01058271-I1Open ↗