← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
551 RUGBY ROAD
BROOKLYN · BIN 3120161
💬 Discuss this project
1921Year Built
3Stories
R6Building Class
R3XZoning
3,940 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · 4,000 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNTECT LLC207/24/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUNTECT LLC4788107/24/2024
Building Lifecycle
All (43)Filed (2)Violation (7)Objection (22)Special Inspection (12)
05/04/2026
Violation issued (HPD, closed)
A
11/20/2025
Violation issued (HPD, closed)
I
06/09/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
08/18/2024
Objection resolved — Addressed
08/18/2024
Objection resolved — Addressed
08/18/2024
Objection resolved — Addressed
08/18/2024
Objection resolved — Addressed
08/18/2024
Objection resolved — Addressed
08/18/2024
Objection resolved — Addressed
08/18/2024
Objection resolved — Addressed
08/18/2024
Objection resolved — Addressed
08/17/2024
Special inspection requirement — Air barrier - visual inspection
David Haner
08/17/2024
Special inspection requirement — Lighting controls
David Haner
08/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
David Haner
08/17/2024
Special inspection requirement — Maintenance information
David Haner
08/17/2024
Special inspection requirement — Fenestration air leakage
David Haner
08/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
David Haner
08/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
David Haner
08/17/2024
Special inspection requirement — Fenestration areas
David Haner
08/17/2024
Special inspection requirement — Interior lighting power
David Haner
08/14/2024
Objection raised — Energy
08/14/2024
Objection raised — Accessibility
08/14/2024
Objection raised — Other
08/08/2024
Objection raised — Other
08/08/2024
Objection resolved — Addressed
08/08/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Other
07/26/2024
Objection raised — Structural
07/26/2024
Objection raised — Energy
07/26/2024
Objection raised — Other
07/26/2024
Objection raised — Accessibility
07/26/2024
Objection raised — Other
07/26/2024
Objection raised — Other
07/24/2024
Filed — Alteration
PERFORM PLUMBING MODIFICATION WORK IN RELATION TO RENOVATION OF APARTMENT #1. REMOVE, INSTALL & REPLACE FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
B01010477-S1
07/24/2024
Filed — Alteration
PERFORM PLUMBING MODIFICATION WORK IN RELATION TO RENOVATION OF APARTMENT #1. REMOVE, INSTALL & REPLACE FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
B01010477-I1
04/09/2024
Violation issued (HPD, closed)
A
02/25/2024
Special inspection requirement — Final
David Haner
02/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Haner
02/25/2024
Special inspection requirement — Lighting in dwelling units
David Haner
03/22/2023
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
A
Nothing on file for this building.
1 project · most recent 07/24/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/24/2024——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/17/2024Air barrier - visual inspectionDavid Hanerenergy_progress
08/17/2024Lighting controlsDavid Hanerenergy_progress
08/17/2024HVAC-R and service water piping design and insulationDavid Hanerenergy_progress
08/17/2024Maintenance informationDavid Hanerenergy_progress
08/17/2024Fenestration air leakageDavid Hanerenergy_progress
08/17/2024Fenestration and door U-factor and product ratingsDavid Hanerenergy_progress
08/17/2024HVAC-R and service water heating equipmentDavid Hanerenergy_progress
08/17/2024Fenestration areasDavid Hanerenergy_progress
08/17/2024Interior lighting powerDavid Hanerenergy_progress
02/25/2024FinalDavid Hanerprogress
02/25/2024Fire-Resistant Penetrations and JointsDavid Hanerspecial
02/25/2024Lighting in dwelling unitsDavid Hanerenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01010477-S1Request digital key ↗
08/24/2026B01010477-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01010477-S1Open ↗
08/24/2026B01010477-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026B01010477-S1Open ↗
08/24/2026B01010477-I1Open ↗