Five to six families
551 SENECA AVENUE
QUEENS · Ridgewood · BIN 4082019
💬 Discuss this project
1905Year Built
3Stories
C2Building Class
R6BZoning
4,650 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Five to six families · Owner of record: 551 SENECA AVENUE LLC · 2,250 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 311p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
551 SENECA AVENUE LLC2507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2021$1.4M—Private party → 551 SENECA AVENUE LLC$292/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES906/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVO CONSTRUCTION LLCGeneral Contractor407/08/2026
PLUMBING NYC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394506/26/2026
Building Lifecycle
All (98)Filed (9)Permit Issued (4)Signed Off (2)Violation (14)Inspection (9)Objection (30)Special Inspection (30)
07/23/2026
Objection raised — Accessibility
07/23/2026
Objection raised — Other
07/23/2026
Objection raised — Accessibility
07/23/2026
Objection raised — Fire_Protection
07/23/2026
Objection raised — Fire_Protection
07/21/2026
Objection raised — Other
06/26/2026
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION TO EXISTING THREE (3) STORY,SIX (6) FAMILY MULTIPLE DWELLING
Q00504497-P6
12/04/2024
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
12/04/2024
Special inspection requirement — Lighting in dwelling units
Paul Raymond
12/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
12/04/2024
Special inspection requirement — Maintenance information
Paul Raymond
12/04/2024
Special inspection requirement — Insulation placement and R values
Paul Raymond
12/04/2024
Special inspection requirement — Permanent certificate
Paul Raymond
12/04/2024
Special inspection requirement — Lighting controls
Paul Raymond
12/04/2024
Special inspection requirement — Fenestration areas
Paul Raymond
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/04/2024
Special inspection requirement — Interior lighting power
Paul Raymond
12/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
12/04/2024
Special inspection requirement — Vestibules
Paul Raymond
12/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
11/14/2024
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION TO EXISTING THREE (3) STORY,SIX (6) FAMILY MULTIPLE DWELLING
Q00504497-P4
11/12/2024
Special inspection requirement — Lighting in dwelling units
Paul Raymond
11/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
11/12/2024
Special inspection requirement — Maintenance information
Paul Raymond
11/12/2024
Special inspection requirement — Vestibules
Paul Raymond
11/12/2024
Special inspection requirement — Interior lighting power
Paul Raymond
11/12/2024
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
11/12/2024
Special inspection requirement — Fenestration areas
Paul Raymond
11/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
11/12/2024
Special inspection requirement — Lighting controls
Paul Raymond
11/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
11/12/2024
Special inspection requirement — Permanent certificate
Paul Raymond
11/12/2024
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/16/2024
Violation issued (HPD, closed)
A
11/27/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2023
Signed off — Alteration
INSTALLATION OF CONCRETE CURB CUT AS PER PLANS FILED HEREWITH
Q08006734-I1
04/20/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/14/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/29/2023
Violation issued (HPD, closed)
A
03/23/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/21/2023
Permit issued — Curb Cut
Q08006734-I1-CC
12/16/2022
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION TO EXISTING THREE (3) STORY,SIX (6) FAMILY MULTIPLE DWELLING
Q00504497-P2
12/16/2022
Special inspection requirement — Permanent certificate
Paul Raymond
12/16/2022
Special inspection requirement — Interior lighting power
Paul Raymond
12/08/2022
Signed off — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH
Q00539708-I1
11/30/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/22/2022
Objection resolved — Addressed
11/21/2022
Objection resolved — Addressed
11/18/2022
Objection raised — Scope
11/14/2022
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH
Q00539708-P2
10/20/2022
Objection raised — Admin
10/07/2022
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION TO EXISTING THREE (3) STORY,SIX (6) FAMILY MULTIPLE DWELLING
Q00504497-P1
09/29/2022
Objection raised — Zoning
09/29/2022
Objection resolved — Addressed
09/29/2022
Objection raised — Scope
09/29/2022
Objection resolved — Addressed
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offAVO CONSTRUCTION LLC03/21/2023
DOB NOWGeneral ConstructionPermit IssuedAVO CONSTRUCTION LLC06/23/2022
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC11/01/2021
DOB NOWGeneral ConstructionPermit IssuedAVO CONSTRUCTION LLC07/19/2021
1 project · most recent 12/06/2022
General Wiring
FiledStatusContractorScope
12/06/2022CompleteLAREDO ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
04/14/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
03/23/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
11/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
12/04/2024Interior lighting powerPaul Raymondenergy_progress
12/04/2024HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
12/04/2024Fenestration areasPaul Raymondenergy_progress
12/04/2024Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
12/04/2024Lighting in dwelling unitsPaul Raymondenergy_progress
12/04/2024Permanent certificatePaul Raymondenergy_progress
12/04/2024Maintenance informationPaul Raymondenergy_progress
12/04/2024Air barrier - visual inspectionPaul Raymondenergy_progress
12/04/2024Insulation placement and R valuesPaul Raymondenergy_progress
12/04/2024Lighting controlsPaul Raymondenergy_progress
12/04/2024VestibulesPaul Raymondenergy_progress
12/04/2024Fire-Resistance Rated ConstructionPaul Raymondprogress
12/04/2024Energy Code Compliance InspectionsPaul Raymondprogress
12/04/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/12/2024Maintenance informationPaul Raymondenergy_progress
11/12/2024Lighting in dwelling unitsPaul Raymondenergy_progress
11/12/2024Insulation placement and R valuesPaul Raymondenergy_progress
11/12/2024Lighting controlsPaul Raymondenergy_progress
11/12/2024Permanent certificatePaul Raymondenergy_progress
11/12/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/12/2024Energy Code Compliance InspectionsPaul Raymondprogress
11/12/2024Fire-Resistance Rated ConstructionPaul Raymondprogress
11/12/2024Fenestration areasPaul Raymondenergy_progress
11/12/2024Air barrier - visual inspectionPaul Raymondenergy_progress
11/12/2024Interior lighting powerPaul Raymondenergy_progress
Latest 25 of 66.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q00539708-P1Request digital key ↗
08/25/2026Q00539708-I1Request digital key ↗
08/21/2026Q00504497-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)5
08/15/2026Q00504497-P6Open ↗
08/13/2026Q00504497-I1Open ↗
08/13/2026Q00504497-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00504497-I1Open ↗
▸Seals & Professional Certifications75
▸DOB NOWProgress Inspector Seal & Signature62
09/27/2026Q00539708-P2Open ↗
09/27/2026Q00539708-P2Open ↗
09/27/2026Q00539708-P2Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q00539708-P1Open ↗
08/25/2026Q00539708-I1Open ↗
08/21/2026Q00504497-P6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00504497-P2Open ↗
08/26/2026Q00504497-P4Open ↗
08/23/2026Q00504497-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/15/2026Q00504497-P6Open ↗
08/13/2026Q00504497-P2Open ↗
08/13/2026Q00504497-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00504497-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026Q00539708-P1Open ↗
08/25/2026Q00539708-I1Open ↗
08/15/2026Q00504497-P6Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00504497-I1Open ↗
08/13/2026Q00539708-I1Open ↗
▸Other Documents17
▸DOB NOWDHCR Document16
08/25/2026Q00539708-P1Open ↗
08/25/2026Q00539708-I1Open ↗
08/25/2026Q00539708-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00504497-I1Open ↗