← Back
Single or multiple dwelling with stores or offices
551 WEST 183 STREET
MANHATTAN · Washington Heights (North) · BIN 1063681
💬 Discuss this project
1915Year Built
2Stories
S9Building Class
R7-2Zoning
3,746 sfGross Floor Area
5Units
Rent Stabilized31 Open Violations 28 unresolved · 3 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: 551 WEST 183RD STREET LLC · 1,873 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof2p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar5p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
551 WEST 183RD STREET1407/08/2026
NEW AMERICAN CONSTRUCTION INC503/22/2026
PHOENIX SUTTON STR INC503/22/2026
SHABAK CHRISTIAN SCHOOL103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2023$1.5M—YAHWEH NISSI 183 CORP. → 551 WEST 183RD STREET LLC$400/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC106/03/2026
BITOPI CONSULTANTS LLC411/01/2025
MSM ENGINEERING SERVICES, PLLC103/15/2024
ENTHINK ENGINEERS LLC108/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MA DESIGNS NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFEPIPE PLUMBING INCPlumbing407/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor303/21/2026
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
PALAVICINO, HUGOElectrical103/21/2026
SANCHEZ, JASONElectrical103/21/2026
DONOHUE, MICHAELElectrical103/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
K-LASH CONSTRUCTION CORPGeneral Contractor107/08/2026
MCCLARIN, LEROYElectrical103/21/2026
MOHAB ELECT'L CONTR'G CORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036211/01/2025
Building Lifecycle
All (73)Filed (7)Permit Issued (6)Signed Off (2)Violation (45)Inspection (7)Special Inspection (6)
07/08/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
06/26/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
06/08/2026
Permit issued — Boiler Equipment
M01187914-S2-BE
06/03/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND NEW COMMERCIAL AND RESIDENTIAL COOKING EQUIPMENT, INCLUDING NEW GAS METERS, AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01187914-S2
11/24/2025
Violation issued (HPD, open)
I
11/01/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND NEW COMMERCIAL AND RESIDENTIAL COOKING EQUIPMENT, INCLUDING NEW GAS METERS, AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01187914-P2
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
10/31/2025
Special inspection requirement — Mechanical Systems
KAMRUL AHSAN
10/31/2025
Special inspection requirement — Final
KAMRUL AHSAN
10/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
KAMRUL AHSAN
10/31/2025
Special inspection requirement — Lighting in dwelling units
KAMRUL AHSAN
10/31/2025
Special inspection requirement — Interior lighting power
KAMRUL AHSAN
09/20/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND NEW COMMERCIAL AND RESIDENTIAL COOKING EQUIPMENT, INCLUDING NEW GAS METERS, AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01187914-P1
08/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/29/2025
Permit issued — Plumbing
M01187914-S1-PL
05/02/2025
Permit issued — Plumbing
M01187914-S1-PL
04/03/2025
Permit issued — Mechanical Systems
M01187914-I1-GC-CX
03/23/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND NEW COMMERCIAL AND RESIDENTIAL COOKING EQUIPMENT, INCLUDING NEW GAS METERS, AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01187914-S1
03/23/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND NEW COMMERCIAL AND RESIDENTIAL COOKING EQUIPMENT, INCLUDING NEW GAS METERS, AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01187914-I1
12/03/2024
Violation issued (HPD, open)
I
10/23/2024
Signed off — Alteration
M01019578-I1
03/26/2024
Permit issued — Sidewalk Shed
M01019578-I1-SH
03/15/2024
Filed — Alteration
M01019578-I1
03/13/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/12/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2023
Violation issued (ECB, open)
Construction
11/27/2023
Violation issued (HPD, open)
I
11/16/2022
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
02/24/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00570445-I1
08/23/2021
Permit issued — Sidewalk Shed
M00570445-I1-SH
08/05/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00570445-I1
04/21/2021
Violation issued (HPD, closed)
I
12/17/2019
Violation issued (HPD, closed)
C
12/17/2019
Violation issued (HPD, open)
B
12/17/2019
Violation issued (HPD, open)
B
12/17/2019
Violation issued (HPD, closed)
C
11/08/2019
Violation issued (HPD, closed)
I
02/15/2019
Violation issued (HPD, open)
C
06/27/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/27/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2018
Violation issued (HPD, open)
B
05/02/2018
Violation issued (HPD, closed)
C
05/02/2018
Violation issued (HPD, open)
C
05/02/2018
Violation issued (HPD, open)
B
05/02/2018
Violation issued (HPD, open)
A
04/05/2018
Violation issued (ECB, open)
Construction
04/05/2018
Violation issued (ECB, open)
Construction
01/23/2018
Violation issued (ECB, open)
Unknown
01/25/2017
Violation issued (HPD, closed)
C
01/25/2017
Violation issued (HPD, closed)
C
01/25/2017
Violation issued (HPD, closed)
C
01/25/2017
Violation issued (HPD, open)
B
01/25/2017
Violation issued (HPD, closed)
C
01/25/2017
Violation issued (HPD, closed)
C
01/25/2017
Violation issued (HPD, open)
B
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSAFEPIPE PLUMBING INC06/08/2026
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG05/29/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP05/02/2025
DOB NOWMechanical SystemsPermit IssuedK-LASH CONSTRUCTION CORP04/03/2025
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/26/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION08/23/2021
BISOTISSUEDA.N.C. CONTRACTING CO.,IN03/03/2016
BISOTISSUEDJOSE R TAVERAS10/30/2009
BISOTISSUEDJOSE R TAVERAS DBA CONST11/12/2008
1 project · most recent 06/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2026Permit IssuedK-LASH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Senville SENA-36HF-MOA 36,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 06/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/03/2026Signed-offSAFEPIPE PLUMBING INCGas, Water/Sanitary
4 projects · most recent 05/06/2025
General Wiring
FiledStatusContractorScope
05/06/2025Permit IssuedMOHAB ELECT'L CONTR'G CORGeneral Wiring
10/27/2024Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
03/15/2024CompleteELPO ELECTRICAL CONTG INC—
08/05/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/08/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
06/26/2026Fail-Final Boiler Equipment InspectionFailView ↗
08/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/31/2025Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
10/31/2025Mechanical SystemsKAMRUL AHSANspecial
10/31/2025FinalKAMRUL AHSANprogress
10/31/2025Fenestration and door U-factor and product ratingsKAMRUL AHSANenergy_progress
10/31/2025Lighting in dwelling unitsKAMRUL AHSANenergy_progress
10/31/2025Interior lighting powerKAMRUL AHSANenergy_progress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00570445-I1Request digital key ↗
08/27/2026M01019578-I1Request digital key ↗
08/17/2026M01187914-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
03/11/2016122606714Open ↗
03/11/2016122606714Open ↗
11/02/2009110246038Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/11/2016122606714Open ↗
09/15/2008110246038Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026M01187914-P1Open ↗
08/17/2026M01187914-S1Open ↗
08/17/2026M01187914-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026M01187914-P2Open ↗
08/24/2026M01187914-P2Open ↗
08/24/2026M01187914-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/11/2016122606714Open ↗
09/15/2008110246038Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026M01187914-P2Open ↗
08/24/2026M01187914-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2016122606714Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/11/2016122606714Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026M01187914-P1Open ↗
08/17/2026M01187914-S1Open ↗
08/17/2026M01187914-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/15/2008110246038Open ↗
09/15/2008110246038Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/11/2016122606714Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
09/15/2008110246038Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/11/2016122606714Open ↗
09/15/2008110246038Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/11/2016122606714Open ↗